Open Access. Powered by Scholars. Published by Universities.®

Construction Engineering Commons™

Open Access. Powered by Scholars. Published by Universities.®

2017

Discipline
Institution
Keyword
Publication
Publication Type

Articles 1 - 30 of 63

Full-Text Articles in Construction Engineering

Highly Vented Truss Wall Honeycomb Structures, David J. Sypeck Dec 2017

Highly Vented Truss Wall Honeycomb Structures, David J. Sypeck

Publications

A vented honeycomb structure with a plurality of honeycomb cells arranged in a hierarchical order and having a plurality of truss walls, each truss wall including a plurality of members. The vented honeycomb structure is fabricated by joining a plurality of sheets of trusses using any one of an expansion, a corrugation, and a slotting process. Fabrication can also occur by deposition, casting, additive, extrusion, or aligning and joining methods. The honeycomb cells, truss walls, truss wall openings, and truss wall members can be functionally graded.


Decision Making Processes For Bim Software Selection In The U.S. A.E.C. Industry: Developing A Unified, Streamlined Framework., Richelle Fosu Dec 2017

Decision Making Processes For Bim Software Selection In The U.S. A.E.C. Industry: Developing A Unified, Streamlined Framework., Richelle Fosu

Purdue Polytechnic Doctoral Dissertations

The use of Building Information Modeling (BIM) techniques and tools continues to gain popularity in the Architecture, Engineering and Construction (AEC) industry as more companies in the various sectors are utilizing it in one form or another. In this research, the decision-making process of construction firms with respect to the selection of BIM software for use is investigated. Through one on one interviews and gathered survey responses, a framework mapping out the various paths the exist in the decision-making process are explored. This data is then used to form a framework for BIM software selection in the construction sector of …


Case Study: Mitigating Schedule Impacts From Oshpd Regulations On Medical Equipment, Peter K. Lee Dec 2017

Case Study: Mitigating Schedule Impacts From Oshpd Regulations On Medical Equipment, Peter K. Lee

Construction Management

The vast majority of healthcare construction projects in the state of California work with OSHPD—Office of Statewide Health Planning and Development—to meet California’s Hospital Seismic Safety Law. While meeting the state’s Hospital Seismic Safety Law is important and even critical, working with OSHPD’s stringent regulations does imply additional concerns to be addressed by the project team. One concern regards the approval of bigger medical equipment and its impact on the overall construction schedule. This paper examines the factors that contribute to delays in the construction schedule, responsible parties for the delay, and responsibilities of each involved party. Based on an …


Bridge Build, Andrew Little Nov 2017

Bridge Build, Andrew Little

Student Scholarship

Bridge build design that includes not only a building process, but a research paper to make the best build possible as well.


Stewardship Of International Bim Programmes: Lessons For Ireland, Barry Mcauley, Alan Hore, Roger West, Shiyao Kuang Nov 2017

Stewardship Of International Bim Programmes: Lessons For Ireland, Barry Mcauley, Alan Hore, Roger West, Shiyao Kuang

Conference papers

The support by central government of national Building Information Modelling (BIM) programmes is common throughout the developed world today. To further understand how the different international governments have supported their BIM programmes the BIM Innovation Capability Programme (BICP) research team in Ireland recently completed a comprehensive Global BIM Study to help inform the National BIM Council (NBC) of Ireland in developing a Roadmap to Digital Transition for Ireland’s Construction Sector. This paper details the findings of a more concentrated investigation on a selection of jurisdictions on how particular international BIM programmes are orgainsed, managed and the level of governmental support …


Measuring Walls In Accordance With Arm4 - An Introductory Demonstration, Tony Cunningham Nov 2017

Measuring Walls In Accordance With Arm4 - An Introductory Demonstration, Tony Cunningham

Other Resources

This demonstration involves the measurement of 'traditional' external brick and block cavity walls and internal block partitions. The demonstration is addressed to students taking (Irish) measurement or quantities modules at first year / entry level of quantity surveying related programmes. The worked example has been carried out using traditional handwritten quantity surveying processes on traditional dimension paper. It is acknowledged that this would be carried out using measurement software or on-screen measurement technology in actual practice. The traditional handwritten approach has been retained in order to enable novice students to develop the necessary measurement skills and build confidence through direct …


Ua12/2/1 Wkuherald321, Wku Student Affairs Nov 2017

Ua12/2/1 Wkuherald321, Wku Student Affairs

WKU Administration Documents

Newsletter recapping the top stories of the week.


Introduction To The Ethics Of Physical Embodiment, Linda M. Johnston Nov 2017

Introduction To The Ethics Of Physical Embodiment, Linda M. Johnston

Siegel Institute Ethics Research Scholars

Introduction to the Ethics of Physical Embodiment


What Lessons Can Be Learned From The Delivery Of The First Building On The Grangegorman Campus Using Building Information Management (Bim)?, Pat O'Sullivan, Avril Behan Nov 2017

What Lessons Can Be Learned From The Delivery Of The First Building On The Grangegorman Campus Using Building Information Management (Bim)?, Pat O'Sullivan, Avril Behan

Conference papers

There is an acceptance that BIM, via data management, can be integrated with FM to reduce costs during the Operations and Maintenance stage of a project. However, what has not been documented is the ‘on the ground’ reality which can be reviewed as a lessons learnt exercise to improve the implementation of BIM FM for future projects. This case study sets out to explore the realities of a client’s adoption of BIM based upon the actual experience of the Greenway Hub. Rather than relying on anecdotal evidence the research was based upon the real practices and experiences of the Dublin …


Bs News November/December Nov 2017

Bs News November/December

Building Services Engineering

No abstract provided.


Valuing Variations In Accordance With The Principle Irish Standard Forms Of Building Contract – Worked Examples And Solutions, Tony Cunningham Oct 2017

Valuing Variations In Accordance With The Principle Irish Standard Forms Of Building Contract – Worked Examples And Solutions, Tony Cunningham

Other Resources

Given the nature of the construction process some change is almost inevitable. Standard forms of contract, therefore, cater for such change by including provisions which permit variations and alterations to the works. Variations may range from small inconsequential changes to major revisions which can delay and disrupt the completion to the project and place the project budget under considerable stress.

Establishing a realistic valuation for variations is not always a straightforward task. Even apparently simple changes can have significant unexpected consequences on project outcomes. This study examines how the valuation of variations may be carried out in accordance with the …


Ua66 Ogden College Of Science & Engineering Newsletter, Wku Ogden College Of Science & Engineering Oct 2017

Ua66 Ogden College Of Science & Engineering Newsletter, Wku Ogden College Of Science & Engineering

Ogden College of Science & Engineering Publications

Newsletter created by and about Ogden College of Science & Engineering.

  • Stevens, Cheryl. A Word with the Dean . . .
  • From the Hilltop
  • 3rd Annual Research Experience for Undergraduates Program Conference
  • Into Bowling Green
  • Barren RIver
  • Mammoth Cave National Park
  • Barrow, Alaska
  • South Korea
  • Postcards from the Field
  • WKU Research Foundation
  • Office of Research & Creative Activity
  • About Applied Research & Technology Program
  • Dean's Office News
  • School of Engineering & Applied Sciences
  • How to Connec
  • Ogden College Hall


The Professional Constructor, Full Issue, Volume 42, Number 02 Oct 2017

The Professional Constructor, Full Issue, Volume 42, Number 02

The Professional Constructor

No abstract provided.


The Automation Of Bim For Compliance Checking: A Visual Programming Approach, Jonathan Reinhardt, Malachy Mathews Sep 2017

The Automation Of Bim For Compliance Checking: A Visual Programming Approach, Jonathan Reinhardt, Malachy Mathews

Conference papers

A study by FIATECH confirmed that human interpretation causes inconsistencies in applying building compliance & regulations (Solihin & Eastman, 2015). Producing, updating and quality assuring such processes is inconsistent and unreliable (Preidel & Borrmann, 2016). A barrier to interpretation of building regulations is that software is designed by developers that are separate to local authorities (Solihin & Eastman, 2015). The current literature suggests Singapore, Norway, USA & Australia have all implemented BIM automation systems for building regulations. This study reviews current automation systems and based on this proposes a system of creating a checking system is efficient in the control …


Embedding Life Cycle Costing In 5d Bim, Dermot Kehily, Jason Underwood, Sep 2017

Embedding Life Cycle Costing In 5d Bim, Dermot Kehily, Jason Underwood,

Articles

Life Cycle Costing (LCC) is the consideration of all ‘relevant’ costs and revenues associated with the acquisition and ownership of an asset. LCC has a number of relevant applications, these include project appraisal; facilities management; procurement and tendering and as a means to evaluate sustainable construction. Although these advantages are well recognised, the process is underutilised due to a number of documented barriers to adoption. Notably these include lack of accurate historical databases; the perceived complexity and time consuming nature of the calculations; lack of a standard LCC methodology, and that clients are not requesting LCC. The research presented is …


Bs News September/October Sep 2017

Bs News September/October

Building Services Engineering

No abstract provided.


Bim+Blockchain: A Solution To The Trust Problem In Collaboration?, Malachy Mathews, Dan Robles, Brian Bowe Aug 2017

Bim+Blockchain: A Solution To The Trust Problem In Collaboration?, Malachy Mathews, Dan Robles, Brian Bowe

Conference papers

This paper provides an overview of historic and current organizational limitations emerging in the Architecture, Engineering, Construction, Building Owner / Operations (AECOO) Industry. It then provides an overview of new technologies that attempt to mitigate these limitations. However, these technologies, taken together, appear to be converging and creating entirely new organizational structures in the AEC industries. This may be characterized by the emergence of what is called the Network Effect and it’s related calculus. This paper culminates with an introduction to Blockchain Technology (BT) and it’s integration with the emergence of groundbreaking technologies such as Internet of Things (IoT), Artificial …


Thunderstruck: Teaching Boy Scouts About History And Cannons, Gary H. Nobbs Jr., Andrew D. Nicholls Aug 2017

Thunderstruck: Teaching Boy Scouts About History And Cannons, Gary H. Nobbs Jr., Andrew D. Nicholls

The Exposition

No abstract provided.


Bim Innovation Capability Programme Of Ireland, Barry Mcauley, Alan Hore, Roger West Jul 2017

Bim Innovation Capability Programme Of Ireland, Barry Mcauley, Alan Hore, Roger West

Conference papers

The Irish Government has requested that Enterprise Ireland, an organisation responsible for the development and growth of Irish enterprises in world markets to actively promote the use of BIM in Ireland. This promotion has taken the form of an opportunity for Enterprise Ireland clients to apply for a grant under their BIM Enable and BIM Implementation schemes and also through their funding of the BIM Innovation Capability Programme (BICP) of Ireland. The BICP is a two-year project (2016-2018) which seeks to capture the capability of the Irish Construction Industry and the Higher Education Institutes to respond to the increased requirement …


A Feasibility Investigation Of Modular Portable “Chelson Shelters” Micro-Homes To Alleviate Housing Deficiencies: A Case Study In Mithi, Tharpakar, Pakistan, Muhammad Usman Ghani Jul 2017

A Feasibility Investigation Of Modular Portable “Chelson Shelters” Micro-Homes To Alleviate Housing Deficiencies: A Case Study In Mithi, Tharpakar, Pakistan, Muhammad Usman Ghani

Masters Theses & Specialist Projects

Many people in Mithi, Tharparkar do not have proper housing, face an unhygienic water supply, and have no sanitation facilities. These factors contribute to disease, suffering and the inability to rise above their destitute existence. The idea for building portable houses for the people of Mithi is presented to provide them with better living conditions and where they can feel a sense of security, ownership and sanitation. Research on existing building systems and materials showed that the most feasible structure for the desert environment is modular panels attached to a core unit that contains all the basic plumbing and electrical …


Bs News July/August Jul 2017

Bs News July/August

Building Services Engineering

No abstract provided.


Gas Collection, Haorong Li, Yanshun Yu, Daihong Yu Jun 2017

Gas Collection, Haorong Li, Yanshun Yu, Daihong Yu

Durham School of Architectural Engineering and Construction: Faculty Publications

A system includes a vessel configured to couple with a gas source for drawing gas into the vessel. The vessel is also configured to receive liquid. The system includes an over flow port in fluid communication with the environment external to the vessel. The overflow port is configured to separate gas within the vessel from the external environment. The system also includes an overflow conduit having an end within the overflow port so that when gas pressure within the vessel increases, liquid is received by the over flow conduit. Another system includes a tank defining an air space for receiving …


Introduction To The Ethics Of Clothing And Clothing Production, Linda M. Johnston Jun 2017

Introduction To The Ethics Of Clothing And Clothing Production, Linda M. Johnston

Siegel Institute Ethics Research Scholars

Introduction to the Ethics of Clothing and Clothing Production


Construction Agility - An Integrated Management System, Remington J. Goodwin Jun 2017

Construction Agility - An Integrated Management System, Remington J. Goodwin

Liberal Arts and Engineering Studies

Construction Agility is a management system to be utilized by project managers to create a visual representation of work in progress on the jobsite. This visual component of Construction Agility increases awareness of job site activities among the general contractor, subcontractors, and visitors, thus increasing safety. The system is a Kanban, otherwise known as a batch system, that displays critical activities with physical moveable cards that display the task, the duration, and the proceeding party. There is a focus on handoffs which requires a willingness to open communication. The visual appeal and simplicity of the batch system for all to …


Mt. Carmel Shade Structure, Sonny Moraga, Adam Maclean, Julian Reyes, Christopher Carter Jun 2017

Mt. Carmel Shade Structure, Sonny Moraga, Adam Maclean, Julian Reyes, Christopher Carter

Architectural Engineering

The Mt. Carmel Shade Structure incorporated the efforts of students practicing Architectural Engineering and Construction Management disciplines. The project consisted of designing, engineering and constructing a steel frame structure for the benefit of Mt. Carmel Church and its associated preschool.


Shrinkage Cracking In Concrete Tilt-Up Construction, Stewart Hooks, Jack Robinson Jun 2017

Shrinkage Cracking In Concrete Tilt-Up Construction, Stewart Hooks, Jack Robinson

Architectural Engineering

The purpose of this project is to investigate a particular, undesirable cracking pattern in concrete tilt-up panels that, until now, did not have a known definite cause. The cause of this cracking pattern is hypothesized to be due to shrinkage restraint of the concrete panels. The cracking under investigation occurs at the bottom corners of the Tilt-Up panels, suggesting that the base of the panel is restrained from shrinkage. This project models various components of Tilt-Up Construction that have potential for restraining the panels from shrinking. This project consists of the following main components.

The first aspect of this project …


Mt Carmel Shade Structure, Julian Reyes, Sonny Moraga, Adam Maclean, Christopher Carter Jun 2017

Mt Carmel Shade Structure, Julian Reyes, Sonny Moraga, Adam Maclean, Christopher Carter

Architectural Engineering

A team of for students designed and constructed a shade structure for a local church and day care center. The group was responsible for developing a design which addressed the needs of the congregation as well as the needs of the toddler day care center. The team developed a steel framed scheme with a panelized metal roof which provided a long lasting solution and minimal maintenance costs.


Speculations On A City For Mars, Edouard Terzis May 2017

Speculations On A City For Mars, Edouard Terzis

School of Architecture - Theses

This thesis proposes the reinterpretation of architectural forms as the index of the constitution of the idea of the city. “Speculations on a City on Mars” is paradoxical in a sense as it superposes both the managerial representation of a city, that is Zoning, along with the speculative aspect of an extra-terrestrial city.


Offshore R+D Facility, Philip A. Marble May 2017

Offshore R+D Facility, Philip A. Marble

Bachelor of Architecture Theses - 5th Year

Design a Research + Development facility that merges with a functional Oil Rig. This center will house both a Marine Research Center and Oil rig Research + Development center. Both of these facilities will be in a separate structure than the Oil Rig but will have a connection back to the Living Quarter.


Modular House Revival, Kevin Chiang, Spencer Dilley, Sarah Dowthwaite, Trevor Houghton, Ryan Lefebvre, Michele Leung, Cameron Lober, Chris Martinez, Katie Mayer May 2017

Modular House Revival, Kevin Chiang, Spencer Dilley, Sarah Dowthwaite, Trevor Houghton, Ryan Lefebvre, Michele Leung, Cameron Lober, Chris Martinez, Katie Mayer

Architectural Engineering

The Modular House, located in Poly Canyon, has seen extensive damage since the last caretaker left nearly ten years ago. To prevent further damage and improve the safety and appeal of the structure, we are proposing a renovation of the existing building that removes the existing cladding and partitions. By the end of Spring Quarter 2017, the Modular House will have a guardrail system replacing the wood paneling on the walls and a new steel composite deck to replace the current flooring system. The structural steel framing system will remain as is.