Open Access. Powered by Scholars. Published by Universities.®

Construction Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 8 of 8

Full-Text Articles in Construction Engineering

Reconstructing The Great Hall At Inkallacta, Vincent R. Lee Jan 1998

Reconstructing The Great Hall At Inkallacta, Vincent R. Lee

Andean Past

No abstract provided.


Dickey-Lincoln School Lakes Transmission Project: Final Environmental Impact Statement: Appendix L, New England Division, United States Army Corps Of Engineers, United States Department Of Energy Jan 1981

Dickey-Lincoln School Lakes Transmission Project: Final Environmental Impact Statement: Appendix L, New England Division, United States Army Corps Of Engineers, United States Department Of Energy

Dickey-Lincoln School Lakes Project

This draft EIS Supplement describes the environmental impacts of updated transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Energy produced by the project is to be integrated into the New England electric system if the project is constructed.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The principal objective of this study is to identify the major types and intensity of social and economic impacts anticipated with the proposed pre-construction, construction, operation and maintenance of the Dickey-Lincoln transmission line. In order to address the types of anticipated impacts it was necessary to first develop a socio-economic profile of the affected area.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix D: Transmission Reconnaissance Study, U.S. Department Of The Interior, U.S. Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix D: Transmission Reconnaissance Study, U.S. Department Of The Interior, U.S. Department Of Energy

Dickey-Lincoln School Lakes Project

This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New England grid, and describes the study area involved. It supplements the Transmission System PI anning Study prepared by the Department of Interior (DOI) (February 1977) and the Assessment of Alternative Power Transmission Corridors prepared by VTN Consolidated (VTN) of Boston Mass., for the Dickey-Lincoln School Lakes project.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, one of several prepared under contract to the DOE by various consultants, is published as an appendix to that statement. Appendix F, Geotechnical Impact Study (two volumes, the second being a map volume), documents a study performed by E. C. …


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix G: Land Use Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix G: Land Use Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

This report is in partial fulfillment of the requirement of the National Environmental Policy Act of 1969. It is a study of the existing and proposed land use impacts which would likely occur as a result of construction of the Dickey-Lincoln Transmission Line in con-junction with the Dickey-Lincoln Hydroelectric Project at Lincoln School in Northern Maine. This report is organized and follows basically a topical summary as outlined in the National Environmental Policy Act.


Dickey-Lincoln School Lakes Project: Transmission System Planning Study, United States Department Of The Interior Jan 1977

Dickey-Lincoln School Lakes Project: Transmission System Planning Study, United States Department Of The Interior

Dickey-Lincoln School Lakes Project

The purpose of this report is to investigate various transmission system alternatives and recommend a plan of service to integrate power from the Dickey-Lincoln School Lakes (D-L) Project into the New England electric power transmission system.


Use Of Remote Sensing To Quantify Construction Material And To Define Geologic Lineations : Dickey-Lincoln School Lakes Project, Maine, H. L. Mckim, C. J. Merry Jan 1976

Use Of Remote Sensing To Quantify Construction Material And To Define Geologic Lineations : Dickey-Lincoln School Lakes Project, Maine, H. L. Mckim, C. J. Merry

Dickey-Lincoln School Lakes Project

This report contains Appendixes A and B of Special Report 242, use of remote sensing to quantify construction material and to define geologic lineations.