Open Access. Powered by Scholars. Published by Universities.®
- Keyword
-
- NEEFC (3)
- Impact assessment (2)
- Transportation (2)
- Bridge Construction (1)
- Bridges (1)
-
- City Planning (1)
- Civil Engineering (1)
- Climate change (1)
- Community (1)
- Community Planning (1)
- Commute Time (1)
- Construction (1)
- Construction Costs (1)
- Corridor (1)
- Cost (1)
- Crossing Study (1)
- Culvert (1)
- Environmental planning (1)
- Finance (1)
- Fore River (1)
- Green infrastructure (1)
- Infrastructure (1)
- LD 1725 (1)
- Location Studies (1)
- Low impact development (1)
- Model (1)
- Motorists (1)
- Portland (1)
- Portland Harbor (1)
- Roads (1)
- Publication Type
Articles 1 - 4 of 4
Full-Text Articles in Construction Engineering
Culvert Material Cost Comparison, New England Environmental Finance Center
Culvert Material Cost Comparison, New England Environmental Finance Center
Economics and Finance
The following tables provide a detailed look at the role that culvert material and culvert diameter play in the overall cost of a culvert replacement project. Table 1 displays the cost per foot purchase price arranged by diameter size for the various culvert materials that are currently available. Table 2 displays the average additional culvert pipe material cost (increased cost to upsize minus original in-kind replacement cost) that would be incurred when upsizing a given diameter of culvert with a 50 foot length by factors of: 200%, 250% and 300%.
Construction Cost Models, Barry Dikeman
Construction Cost Models, Barry Dikeman
Economics and Finance
The following are a series of cost estimate models similar in format to a typical engineer’s estimate that were developed in support of our financial impact assessment report for LD 1725. The models us current material costs, labor costs, and equipment costs for the region to provide a comparative cost analysis of seven culvert replacement scenarios. The models provide information about what the cost impact of LD 1725 would be for typical culvert replacements in Maine. However, due to the inherent restrictions of the cost modeling framework we were not able to include the abundance of variables that would be …
Sustainable Portland: Implementation Series 1, New England Environmental Finance Center
Sustainable Portland: Implementation Series 1, New England Environmental Finance Center
Climate Change
When the Sustainable Portland Task Force Report was released in November 2007, under the leadership of Mayor Jim Cohen, Portland Councilor Kevin Donoghue had the idea that students at the Muskie School of Public Service might be able to help implement recommendations from the report. It may have helped that Kevin was himself a graduate of the Community Planning and Development Master’s program at the Muskie School, but it was a good idea nevertheless. He approached Professor Sam Merrill in the CPD program, who spoke with the new Mayor Ed Suslovic about a possible partnership between the City and the …
Bridge / Tunnel Crossing Study : Portland Harbor - Fore River, Portland - South Portland, Maine Department Of Transportation
Bridge / Tunnel Crossing Study : Portland Harbor - Fore River, Portland - South Portland, Maine Department Of Transportation
Maine Collection
Bridge / Tunnel Crossing Study : Portland Harbor - Fore River, Portland - South Portland
Report by Fay, Spofford & Thorndike, Inc., Engineers, Boston, Mass.
Prepared for the Maine Department of Transportation, Augusta, Maine, 1973.
Contents: Table of Contents / List of Figures / List of Tables / Introduction / Summary of Findings / Section 1 - General Background - Location Study / Section 2 - Alternative Facilities and Locations / Section 3 - Comparison of Construction Costs - Tunnel Versus Bridge / Section 4 - Traffic Analysis / Section 5 - Cost Effectiveness Analysis / Section 6 - Financial …