Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 5 of 5
Full-Text Articles in Architecture
Mt. Carmel Shade Structure, Sonny Moraga, Adam Maclean, Julian Reyes, Christopher Carter
Mt. Carmel Shade Structure, Sonny Moraga, Adam Maclean, Julian Reyes, Christopher Carter
Architectural Engineering
The Mt. Carmel Shade Structure incorporated the efforts of students practicing Architectural Engineering and Construction Management disciplines. The project consisted of designing, engineering and constructing a steel frame structure for the benefit of Mt. Carmel Church and its associated preschool.
Shrinkage Cracking In Concrete Tilt-Up Construction, Stewart Hooks, Jack Robinson
Shrinkage Cracking In Concrete Tilt-Up Construction, Stewart Hooks, Jack Robinson
Architectural Engineering
The purpose of this project is to investigate a particular, undesirable cracking pattern in concrete tilt-up panels that, until now, did not have a known definite cause. The cause of this cracking pattern is hypothesized to be due to shrinkage restraint of the concrete panels. The cracking under investigation occurs at the bottom corners of the Tilt-Up panels, suggesting that the base of the panel is restrained from shrinkage. This project models various components of Tilt-Up Construction that have potential for restraining the panels from shrinking. This project consists of the following main components.
The first aspect of this project …
Mt Carmel Shade Structure, Julian Reyes, Sonny Moraga, Adam Maclean, Christopher Carter
Mt Carmel Shade Structure, Julian Reyes, Sonny Moraga, Adam Maclean, Christopher Carter
Architectural Engineering
A team of for students designed and constructed a shade structure for a local church and day care center. The group was responsible for developing a design which addressed the needs of the congregation as well as the needs of the toddler day care center. The team developed a steel framed scheme with a panelized metal roof which provided a long lasting solution and minimal maintenance costs.
Modular House Revival, Kevin Chiang, Spencer Dilley, Sarah Dowthwaite, Trevor Houghton, Ryan Lefebvre, Michele Leung, Cameron Lober, Chris Martinez, Katie Mayer
Modular House Revival, Kevin Chiang, Spencer Dilley, Sarah Dowthwaite, Trevor Houghton, Ryan Lefebvre, Michele Leung, Cameron Lober, Chris Martinez, Katie Mayer
Architectural Engineering
The Modular House, located in Poly Canyon, has seen extensive damage since the last caretaker left nearly ten years ago. To prevent further damage and improve the safety and appeal of the structure, we are proposing a renovation of the existing building that removes the existing cladding and partitions. By the end of Spring Quarter 2017, the Modular House will have a guardrail system replacing the wood paneling on the walls and a new steel composite deck to replace the current flooring system. The structural steel framing system will remain as is.
Clothedral, Jacob T. Holmes, Andres Munoz, Sam Tenreiro Theis, Marta Blachowicz
Clothedral, Jacob T. Holmes, Andres Munoz, Sam Tenreiro Theis, Marta Blachowicz
Architectural Engineering
No abstract provided.