Articles 1 - 8 of 8

Full-Text Articles in Entire DC Network

A Multi-Criteria Methodology For Measuring The Resilience Of Transportation Assets And Prioritizing Security Investments, Michelle S. Dojutrek, Samuel Labi, J Eric Dietz Jan 2014

A Multi-Criteria Methodology For Measuring The Resilience Of Transportation Assets And Prioritizing Security Investments, Michelle S. Dojutrek, Samuel Labi, J Eric Dietz

International Institute for Infrastructure Resilience and Reconstruction (I3R2) Conference

Transportation project prioritization uses performance measures that are related to the transportation asset, its operations, and its environment. However, in the state of practice, evaluation does not consider directly the likelihood of natural or man-made threats, the infrastructure resilience, or the consequences of the infrastructure damage in the event that the threat occurs. Thus, during the prioritization of investments, assets of low security do not receive the due attention they deserve. In defining security as the lack of risk of damage from threats due to inherent structure or functional resilience, this paper is based on the premise that the inclusion …


Simulation Of Bedrock Motion To Obtain Pga Values, Shyanaka Dananjaya, Ranjith Dissanayake, Nimal Senevirathne, Kushan K. Wijesundara Jan 2014

Simulation Of Bedrock Motion To Obtain Pga Values, Shyanaka Dananjaya, Ranjith Dissanayake, Nimal Senevirathne, Kushan K. Wijesundara

International Institute for Infrastructure Resilience and Reconstruction (I3R2) Conference

This study is focused on producing the Peak Ground Acceleration (PGA) values for important cities in Sri Lanka, which would provide the base to develop the national annex to the Euro Code, the current guideline in designing structures. In order to find out the magnitude and the epicenter distance of a 475-year return period earthquake, an earthquake catalog was developed. To simulate the bedrock motion FLAC Software, which uses the Finite Difference approach, was used. Five 2-D FLAC models representing five cross sections of Sri Lanka were developed. Due to the lack of local data records, a dataset of seven …


Compare And Contrast Major Nuclear Power Plant Disasters: Lessons Learned From The Past, Sayanti Mukhopadhyay, Makarand Hastak Dr., Jessica Halligan Jan 2014

Compare And Contrast Major Nuclear Power Plant Disasters: Lessons Learned From The Past, Sayanti Mukhopadhyay, Makarand Hastak Dr., Jessica Halligan

International Institute for Infrastructure Resilience and Reconstruction (I3R2) Conference

The construction of nuclear power plants is a major step towards reducing greenhouse gas emissions compared to the conventional coal-fired or oil-fired power plants. However, some of the major nuclear accidents in the past have raised questions about the safety and reliability of nuclear power plants. This paper compares and contrasts the major nuclear accidents of the past for example, the Chernobyl disaster (USSR), the Fukushima Daiichi disaster (Japan), and the Three Mile Island incident (USA). Although each of the accidents was unique, a thorough comparison found some common issues, such as faulty design of reactors and safety systems, safety …


Motive And Conflict In The Disaster Recovery Process Of Housing Reconstruction In Sri Lanka After The 2004 Indian Ocean Tsunami, Chang Yeol Choi, Riki Honda Jan 2014

Motive And Conflict In The Disaster Recovery Process Of Housing Reconstruction In Sri Lanka After The 2004 Indian Ocean Tsunami, Chang Yeol Choi, Riki Honda

International Institute for Infrastructure Resilience and Reconstruction (I3R2) Conference

Normative solutions for the successful recovery from large-scale disasters have been presented by various researches, but implementation requires a long process, and mechanism for the process to continue is necessary. We consider the consistency among strategies of stakeholders such as government and NGOs. These players make a decision based on not only direct motive but various complex motives and interaction with other players. This paper considers interactive decision-making as a game among stakeholders. As a case to study, we analyze housing reconstruction project in Sri Lanka after the 2004 Indian Ocean Tsunami. There was relatively abundant financial support, but the …


Housing The Workforce Following The Canterbury Earthquakes In New Zealand, Yan Chang-Richards, Suzanne J. Wilkinson, Erica Seville, David Brundson Jan 2014

Housing The Workforce Following The Canterbury Earthquakes In New Zealand, Yan Chang-Richards, Suzanne J. Wilkinson, Erica Seville, David Brundson

International Institute for Infrastructure Resilience and Reconstruction (I3R2) Conference

Temporary housing following a large-scale disaster has a positive effect on household welfare and community recovery. Following the 2010 and 2011 Canterbury earthquakes, a shortage of temporary accommodation created barriers for the outside construction workforce to engage in repairs and rebuild in Christchurch. This study investigates the impacts of housing shortages for the overall recovery and the strategies adopted by both households and the workforce in the building industry. Findings suggest that the interplay among the industry strategies and household strategies for securing housing determines the magnitude and scope of economy-wide inflation. One unfortunate consequence of these industry strategies is …


Development Of Resilience Index In Transport Systems, Seungjae Lee, Jooyoung Kim, Shinhae Lee, Yan Chang-Richards Jan 2014

Development Of Resilience Index In Transport Systems, Seungjae Lee, Jooyoung Kim, Shinhae Lee, Yan Chang-Richards

International Institute for Infrastructure Resilience and Reconstruction (I3R2) Conference

This paper demonstrates the quantification of the resilience index (RI) in transport systems. The transport infrastructure can be managed by using the concepts of resilience. Vugrin, Warren, Ehlen, & Camphouse (2010) emphasized the enhancement of resilience in infrastructure before disasters and the establishment of efficient measures for the recovery of systems in an emergency. The concept of resilience has a significant influence on transport planning and operations for disaster preparation. Lee, Kim, & Lee (2013) investigated the concepts of resilience and examined case studies using valuable asset-management techniques in order to maintain the resilience concepts which should be introduced in …


Flood Risk Management: An Illustrative Approach, Natainia S. Lummen, Y Nagayoshi, H Shirozu, T Hokamura, S Nakajo, F Yamada, N Okada Jan 2014

Flood Risk Management: An Illustrative Approach, Natainia S. Lummen, Y Nagayoshi, H Shirozu, T Hokamura, S Nakajo, F Yamada, N Okada

International Institute for Infrastructure Resilience and Reconstruction (I3R2) Conference

Widespread flooding with significant damage in many countries, such as the Philippines in 2013, highlights the ongoing need for effective flood risk management (FRM). This hinges on comprehensive access to and dissemination of information about the elements and the people at risk. Simulations, real-time graphs, and maps illustrate the spatial distribution of flood risks, spatial allocation and dissemination of flood effects, if flood risk reduction measures are not implemented, as well as the benefits to be derived from the effective implementation and maintenance of flood risk management measures not realized. Using precipitation, river water, and tide levels, a real-time monitoring …


Postdisaster Reconstruction Of Horizontal Infrastructure Systems: A Review Of The Christchurch Rebuild, Kristen A. Macaskill Jan 2014

Postdisaster Reconstruction Of Horizontal Infrastructure Systems: A Review Of The Christchurch Rebuild, Kristen A. Macaskill

International Institute for Infrastructure Resilience and Reconstruction (I3R2) Conference

This paper investigates the decision-making processes guiding postdisaster infrastructure reconstruction— concentrating on wastewater, water supply, stormwater and road networks (“horizontal infrastructure”). It draws on empirical analysis of the postearthquake reconstruction currently underway in Christchurch, New Zealand.

Restoring infrastructure services to provide at least a basic level of essential services after a disaster helps wider economic recovery. Subsequently, there is pressure to restore infrastructure services to predisaster levels as quickly as possible. Reconstruction programmes thus commence in highly uncertain decision-making environments and are reactive to perceived, immediate needs. The extent and nature of the work is later clarified and re-evaluated as …