Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network

Open Access. Powered by Scholars. Published by Universities.®

Civil and Environmental Engineering

Graduate Theses and Dissertations

Retrofit

Publication Year

Articles 1 - 3 of 3

Full-Text Articles in Entire DC Network

Testing And Development Of Pre-Stressed Cfrp Retrofit Strategies For Controlling Fatigue Cracking In Steel Waterway Lock Gate Structures, Maggie Langston Aug 2018

Testing And Development Of Pre-Stressed Cfrp Retrofit Strategies For Controlling Fatigue Cracking In Steel Waterway Lock Gate Structures, Maggie Langston

Graduate Theses and Dissertations

Steel waterway lock gates across the national inland waterway transportation network are reaching and exceeding their intended service life, often experiencing component failures that lead to service interruptions. Unscheduled maintenance and repair of lock gates can be expensive and cause economic ripples throughout the entire inland waterway network. These lock gate component failures are often caused by fatigue cracking from repeated loading during operation. This thesis develops and tests a prestressed carbon fiber reinforced polymer (CFRP) fatigue retrofit for controlling fatigue demands within lock gate components. The study expands upon a recent analytical work by Lozano (2017) by experimentally investigating …


Development Of Pre-Stressed Retrofit Strategies For Mitigating Fatigue Cracking In Steel Waterway Lock Gate Components, Christine Michelle Lozano Dec 2017

Development Of Pre-Stressed Retrofit Strategies For Mitigating Fatigue Cracking In Steel Waterway Lock Gate Components, Christine Michelle Lozano

Graduate Theses and Dissertations

Lock gates are an important part of the transportation infrastructure within the United States (US), having many economic, safety, and environmental benefits over rail and highway transportation systems. Unfortunately, many existing lock gates throughout the US have reached or exceeded their initial design life and require frequent repairs to remain in service. Unscheduled repairs often increase as gates age, having a local economic impact on freight transport which can create economic ripples throughout the nation. Fatigue and corrosion are key causes of unscheduled service interruptions, degrading lock gate components over time. Additionally, because lock gates are submerged during operation, crack …


Development Of Pre-Stressed Cfrp Fatigue Retrofits For Common Steel Bridge Connections, Korey Albert Pough Dec 2015

Development Of Pre-Stressed Cfrp Fatigue Retrofits For Common Steel Bridge Connections, Korey Albert Pough

Graduate Theses and Dissertations

Aging or deterioration of the nation’s bridge infrastructure is a significant issue that requires attention. Causes for much of this deterioration can be attributed to two main factors, 1) corrosion, and 2) metallic fatigue, both of which work together to reduce the strength and serviceability of bridge components over time. In many instances, strengthening of bridge components using localized retrofits offers an economical and fast solution for increasing the longevity of existing steel bridges; however, such retrofits must be resilient to further corrosion and fatigue damage. In this study, a localized retrofit is developed using pre-stressed Carbon Fiber Reinforced Polymer …