Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, 2024 Montana Tech Library
Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) United Congregational Church (Crayon Academy Preschool), 2024 Montana Tech Library
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) United Congregational Church (Crayon Academy Preschool), Environmental Resource Management (Erm)
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #10: Ur-44, Ur-45, Ur-46, Ur-47, And Ur-48, 2024 Atlantic Richfield Company
Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #10: Ur-44, Ur-45, Ur-46, Ur-47, And Ur-48, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
The Role Of Greenways In Achieving Urban Sustainability For Cities Accordance With The Sustainable Development Goals 2030, 2024 Vice Dean for Community and Environmental Affairs, Professor in the Department of Architecture, Tanta University, Egypt
The Role Of Greenways In Achieving Urban Sustainability For Cities Accordance With The Sustainable Development Goals 2030, Walaa Ahmed Nour Prof, Aya Abdelazim Abdeen, Lobna Agha Prof
Journal of Engineering Research
The concept of "greenways" emerged to achieve sustainable development in urban areas and to address natural disasters resulting from climate change. This research paper aims to study the role of greenways in achieving urban sustainability and their facilitation in achieving the Sustainable Development Goals for 2030. The paper expounds on the idea and origin of greenways, their benefits, and analyzes some global examples. Furthermore, it categorizes the indicators of greenway design into two types: those with a positive impact and those without an impact on sustainable development goals. Using standardized tools, the relationship between each indicator and sustainable development goals …
Comments For The Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Interior School Dust – Investigation Summary Report – Gold Hill Lutheran (Dated February 5, 2024), 2024 Environmental Protection Agency
Comments For The Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Interior School Dust – Investigation Summary Report – Gold Hill Lutheran (Dated February 5, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Repository And Haul Route Geotechnical Pre-Design Investigation (Pdi) Work Plan, 2024 Montana Tech Library
Repository And Haul Route Geotechnical Pre-Design Investigation (Pdi) Work Plan, Jacobs Engineering Group
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) East Middle School, Christopher Berg, Thomas J. Beckman
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Use Of Unoccupied Aerial Vehicle (Drones) Based Remote Sensing To Model Platform Topography And Identify Human-Made Earthen Barriers In Salt Marshes, 2024 University of Massachusetts Amherst
Use Of Unoccupied Aerial Vehicle (Drones) Based Remote Sensing To Model Platform Topography And Identify Human-Made Earthen Barriers In Salt Marshes, Joshua J. Ward
Masters Theses
Elevation is a foundational driver of salt marsh morphology. Elevation governs inundation and hydrological patterns, vegetation distribution, and soil health. Anthropogenic impacts at grand scales (e.g., rising sea levels) and local scales (e.g., infrastructure) have altered the elevation of the salt marsh surface, changing the topography and morphology of these ecosystems. This study establishes and assesses means to document and analyze these impacts using Unoccupied Aerial Vehicle (UAV) based remote sensing to model platform topography. This thesis’s first and primary study presents and compares methods of producing high-resolution digital terrain models (DTMs) with UAV-based Digital Aerial Photogrammetry (DAP) and Light …
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, 2024 Montana Tech Library
Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Epa Remedial Project Manager Change, Rocker Operable Unit Of The Silver Bow Creek/Butte Are, Civil Action No 89-39-Bu-Pgh, 2024 Environmental Protection Agency
Epa Remedial Project Manager Change, Rocker Operable Unit Of The Silver Bow Creek/Butte Are, Civil Action No 89-39-Bu-Pgh, Jason Rappe
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Butte Career Center / Webster Garfield, Christopher Berg, Thomas J. Beckman
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Enhancing Landslide Susceptibility Modelling Through A Novel Non-Landslide Sampling Method And Ensemble Learning Technique, 2024 China University of Geosciences Wuhan
Enhancing Landslide Susceptibility Modelling Through A Novel Non-Landslide Sampling Method And Ensemble Learning Technique, Chao Zhou, Yue Wang, Ying Cao, Ramesh P. Singh, Bayes Ahmed, Mahdi Motagh, Yang Wang, Ling Chen, Guangchao Tan, Shanshan Li
Mathematics, Physics, and Computer Science Faculty Articles and Research
In recent years, several catastrophic landslide events have been observed throughout the globe, threatening to lives and infrastructures. To minimize the impact of landslides, the need of landslide susceptibility map is important. The study aims to extract high-quality non-landslide samples and improve the accuracy of landslide susceptibility modelling (LSM) outcomes by applying a coupled method of ensemble learning and Machine Learning (ML). The Zigui-Badong section of the Three Gorges Reservoir area (TGRA) in China was considered in the present study. Twelve influencing factors were selected as inputs for LSM, and the relationship between each causal factor and landslide spatial development …
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Helehan Borrow Material Submittal #2 (Dated March 12, 2024), 2024 Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Helehan Borrow Material Submittal #2 (Dated March 12, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Epa Remedial Project Manager Change, Berkeley Pit/Mine Flooding Operable Unit (Bmfou) Of The Silver Bow Creek/Butte Area And Consent Decree For The Mine Flooding Site, Cv 02-35-Bu-Rfc, 2024 Environmental Protection Agency
Re: Epa Remedial Project Manager Change, Berkeley Pit/Mine Flooding Operable Unit (Bmfou) Of The Silver Bow Creek/Butte Area And Consent Decree For The Mine Flooding Site, Cv 02-35-Bu-Rfc, Jason Rappe
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Emerson Elementary School, 2024 Montana Tech Library
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Emerson Elementary School, Environmental Resource Management (Erm)
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Comments For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2023 Bres Field Evaluation Summary Report And Technical Recommendations Proposal (Dated November 15, 2023) And 2023 Corrective Action Plans For Reclaimed Sites (Dated January 31, 2024), 2024 Environmental Protection Agency
Re: Comments For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2023 Bres Field Evaluation Summary Report And Technical Recommendations Proposal (Dated November 15, 2023) And 2023 Corrective Action Plans For Reclaimed Sites (Dated January 31, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Type B Borrow Material Submittal #2 (Dated February 14, 2024), 2024 Environmental Protection Agency
Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Type B Borrow Material Submittal #2 (Dated February 14, 2024), Molly Roby
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Medical Monitoring Working Group Meeting Minutes, 2024 Atlantic Richfield Company
Medical Monitoring Working Group Meeting Minutes, Mike Mcanulty
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Final 2024 Butte Priority Soils Operable Unit Type B Borrow Material Submittal #2, 2024 Montana Tech Library
Final 2024 Butte Priority Soils Operable Unit Type B Borrow Material Submittal #2, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.
Draft Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, 2024 Montana Tech Library
Draft Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, Pioneer Technical Services, Inc.
Silver Bow Creek/Butte Area Superfund Site
No abstract provided.