Open Access. Powered by Scholars. Published by Universities.®

Environmental Indicators and Impact Assessment Commons

Open Access. Powered by Scholars. Published by Universities.®

5,511 Full-Text Articles 8,118 Authors 1,442,534 Downloads 198 Institutions

All Articles in Environmental Indicators and Impact Assessment

Faceted Search

5,511 full-text articles. Page 1 of 200.

Do Heat Waves Drive Natural Selection In Damselflies?, Adam Baranyk 2024 University of Arkansas, Fayetteville

Do Heat Waves Drive Natural Selection In Damselflies?, Adam Baranyk

Biological Sciences Undergraduate Honors Theses

Climate change has led to changes in both mean temperatures and temperature extremes over the recent years. These changes have had differential effects on animals throughout the world. Ectotherms depend on their external environment for thermal regulation, making them especially susceptible to temperature extremes. It is not yet clear whether there is a relationship between physical traits in ectotherms, and survivorship throughout a heat wave. That is, whether or not temperature extremes driven survival selection. In this study, a heat wave was simulated artificially using thermally regulated mesocosms at different temperatures (18°C, 22° C, 26° C, 30° C) with a …


Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Small World Day Care, Environmental Resource Management (ERM) 2024 Montana Tech Library

Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Small World Day Care, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments On The Repository And Haul Route Geotechnical Pre-Design Investigation Work Plan (Dated March 29, 2024), Repository And Proposed Haul Route – Silver Bow Creek Conservation Area Quality Assurance Project Plan (Dated March 29, 2024), And Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Dated March 22, 2024), Emma Rott 2024 Environmental Protection Agency

Re: Comments On The Repository And Haul Route Geotechnical Pre-Design Investigation Work Plan (Dated March 29, 2024), Repository And Proposed Haul Route – Silver Bow Creek Conservation Area Quality Assurance Project Plan (Dated March 29, 2024), And Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (Dated March 22, 2024), Emma Rott

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report Kennedy Elementary, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (ERM) 2024 ERM

Residential Metals Abatement Program Construction Completion Report Kennedy Elementary, Christopher Berg, Thomas J. Beckman, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, Pioneer Technical Services, Inc. 2024 Montana Tech Library

Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) United Congregational Church (Crayon Academy Preschool), Environmental Resource Management (ERM) 2024 Montana Tech Library

Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) United Congregational Church (Crayon Academy Preschool), Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #10: Ur-44, Ur-45, Ur-46, Ur-47, And Ur-48, Mike McAnulty 2024 Atlantic Richfield Company

Butte Priority Soils Operable Unit (Bpsou) Draft Final Unreclaimed Sites Field Sampling Plan (Fsp) Package #10: Ur-44, Ur-45, Ur-46, Ur-47, And Ur-48, Mike Mcanulty

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


The Role Of Greenways In Achieving Urban Sustainability For Cities Accordance With The Sustainable Development Goals 2030, walaa ahmed nour prof, Aya abdelazim Abdeen, lobna Agha Prof 2024 Vice Dean for Community and Environmental Affairs, Professor in the Department of Architecture, Tanta University, Egypt

The Role Of Greenways In Achieving Urban Sustainability For Cities Accordance With The Sustainable Development Goals 2030, Walaa Ahmed Nour Prof, Aya Abdelazim Abdeen, Lobna Agha Prof

Journal of Engineering Research

The concept of "greenways" emerged to achieve sustainable development in urban areas and to address natural disasters resulting from climate change. This research paper aims to study the role of greenways in achieving urban sustainability and their facilitation in achieving the Sustainable Development Goals for 2030. The paper expounds on the idea and origin of greenways, their benefits, and analyzes some global examples. Furthermore, it categorizes the indicators of greenway design into two types: those with a positive impact and those without an impact on sustainable development goals. Using standardized tools, the relationship between each indicator and sustainable development goals …


Comments For The Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Interior School Dust – Investigation Summary Report – Gold Hill Lutheran (Dated February 5, 2024), Molly Roby 2024 Environmental Protection Agency

Comments For The Butte Priority Soils (Bpsou) Residential Metals Abatement Program (Rmap) – Interior School Dust – Investigation Summary Report – Gold Hill Lutheran (Dated February 5, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Repository And Haul Route Geotechnical Pre-Design Investigation (Pdi) Work Plan, Jacobs Engineering Group 2024 Montana Tech Library

Repository And Haul Route Geotechnical Pre-Design Investigation (Pdi) Work Plan, Jacobs Engineering Group

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) East Middle School, Christopher Berg, Thomas J. Beckman 2024 ERM

Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) East Middle School, Christopher Berg, Thomas J. Beckman

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Use Of Unoccupied Aerial Vehicle (Drones) Based Remote Sensing To Model Platform Topography And Identify Human-Made Earthen Barriers In Salt Marshes, Joshua J. Ward 2024 University of Massachusetts Amherst

Use Of Unoccupied Aerial Vehicle (Drones) Based Remote Sensing To Model Platform Topography And Identify Human-Made Earthen Barriers In Salt Marshes, Joshua J. Ward

Masters Theses

Elevation is a foundational driver of salt marsh morphology. Elevation governs inundation and hydrological patterns, vegetation distribution, and soil health. Anthropogenic impacts at grand scales (e.g., rising sea levels) and local scales (e.g., infrastructure) have altered the elevation of the salt marsh surface, changing the topography and morphology of these ecosystems. This study establishes and assesses means to document and analyze these impacts using Unoccupied Aerial Vehicle (UAV) based remote sensing to model platform topography. This thesis’s first and primary study presents and compares methods of producing high-resolution digital terrain models (DTMs) with UAV-based Digital Aerial Photogrammetry (DAP) and Light …


Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc. 2024 Montana Tech Library

Draft Final Quarterly Operations And Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc.

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Epa Remedial Project Manager Change, Rocker Operable Unit Of The Silver Bow Creek/Butte Are, Civil Action No 89-39-Bu-Pgh, Jason Rappe 2024 Environmental Protection Agency

Epa Remedial Project Manager Change, Rocker Operable Unit Of The Silver Bow Creek/Butte Are, Civil Action No 89-39-Bu-Pgh, Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Butte Career Center / Webster Garfield, Christopher Berg, Thomas J. Beckman 2024 ERM

Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Butte Career Center / Webster Garfield, Christopher Berg, Thomas J. Beckman

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Enhancing Landslide Susceptibility Modelling Through A Novel Non-Landslide Sampling Method And Ensemble Learning Technique, Chao Zhou, Yue Wang, Ying Cao, Ramesh P. Singh, Bayes Ahmed, Mahdi Motagh, Yang Wang, Ling Chen, Guangchao Tan, Shanshan Li 2024 China University of Geosciences Wuhan

Enhancing Landslide Susceptibility Modelling Through A Novel Non-Landslide Sampling Method And Ensemble Learning Technique, Chao Zhou, Yue Wang, Ying Cao, Ramesh P. Singh, Bayes Ahmed, Mahdi Motagh, Yang Wang, Ling Chen, Guangchao Tan, Shanshan Li

Mathematics, Physics, and Computer Science Faculty Articles and Research

In recent years, several catastrophic landslide events have been observed throughout the globe, threatening to lives and infrastructures. To minimize the impact of landslides, the need of landslide susceptibility map is important. The study aims to extract high-quality non-landslide samples and improve the accuracy of landslide susceptibility modelling (LSM) outcomes by applying a coupled method of ensemble learning and Machine Learning (ML). The Zigui-Badong section of the Three Gorges Reservoir area (TGRA) in China was considered in the present study. Twelve influencing factors were selected as inputs for LSM, and the relationship between each causal factor and landslide spatial development …


Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Helehan Borrow Material Submittal #2 (Dated March 12, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Approval Letter For The Butte Priority Soils Operable Unit (Bpsou) Draft Final 2024 Helehan Borrow Material Submittal #2 (Dated March 12, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Epa Remedial Project Manager Change, Berkeley Pit/Mine Flooding Operable Unit (Bmfou) Of The Silver Bow Creek/Butte Area And Consent Decree For The Mine Flooding Site, Cv 02-35-Bu-Rfc, Jason Rappe 2024 Environmental Protection Agency

Re: Epa Remedial Project Manager Change, Berkeley Pit/Mine Flooding Operable Unit (Bmfou) Of The Silver Bow Creek/Butte Area And Consent Decree For The Mine Flooding Site, Cv 02-35-Bu-Rfc, Jason Rappe

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Emerson Elementary School, Environmental Resource Management (ERM) 2024 Montana Tech Library

Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Emerson Elementary School, Environmental Resource Management (Erm)

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Re: Comments For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2023 Bres Field Evaluation Summary Report And Technical Recommendations Proposal (Dated November 15, 2023) And 2023 Corrective Action Plans For Reclaimed Sites (Dated January 31, 2024), Molly Roby 2024 Environmental Protection Agency

Re: Comments For The Butte Priority Soils Operable Unit (Bpsou) Butte Reclamation Evaluation System (Bres) Draft 2023 Bres Field Evaluation Summary Report And Technical Recommendations Proposal (Dated November 15, 2023) And 2023 Corrective Action Plans For Reclaimed Sites (Dated January 31, 2024), Molly Roby

Silver Bow Creek/Butte Area Superfund Site

No abstract provided.


Digital Commons powered by bepress