Open Access. Powered by Scholars. Published by Universities.®

Urban Studies and Planning Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 7 of 7

Full-Text Articles in Urban Studies and Planning

Land Planning And Development Mitigation For Protecting Water Quality In The Great Lakes System: An Evaluation Of U.S. Approaches, Elizabeth Brabec, Peter Kumble Mar 2005

Land Planning And Development Mitigation For Protecting Water Quality In The Great Lakes System: An Evaluation Of U.S. Approaches, Elizabeth Brabec, Peter Kumble

Elizabeth Brabec

A review of the land use/water quality interface of the Great Lakes system, and the monitoring programs in place. The paper reviews the weakness in the system and suggests opportunities for improvement.


Land Planning And Development Mitigation For Protecting Water Quality In The Great Lakes System: An Evaluation Of U.S. Approaches, Elizabeth Brabec, Peter Kumble Mar 2005

Land Planning And Development Mitigation For Protecting Water Quality In The Great Lakes System: An Evaluation Of U.S. Approaches, Elizabeth Brabec, Peter Kumble

Landscape Architecture & Regional Planning Faculty Publication Series

A review of the land use/water quality interface of the Great Lakes system, and the monitoring programs in place. The paper reviews the weakness in the system and suggests opportunities for improvement.


Gill, Massachusetts: The Mariamante Parcel, Center For Economic Development Jan 2005

Gill, Massachusetts: The Mariamante Parcel, Center For Economic Development

Center for Economic Development Technical Reports

In December of 2004, the small Massachusetts town of Gill took a tremendous step to influence its own future. A fifteen acre parcel of land in the south of town, near the intersection of two important town roads, had been put up for sale by its previous owners. The land had been under an agricultural preservation restriction, a program enabled by Massachusetts General Law Chapter 61 A. As part of this restriction, if the land were ever sold, the town would have right of first refusal.

The town's recent Community Development Plan has identified the parcel as a prime site …


Economic Development Plan Town Of Warren, Massachusetts, Center For Economic Development Jan 2005

Economic Development Plan Town Of Warren, Massachusetts, Center For Economic Development

Center for Economic Development Technical Reports

This section of the Comprehensive Plan identifies economic development strategies within the framework of various development opportunities available to Warren given its current economic and geographical standing within the region. These economic development strategies strive to meet the needs and desires of the residents of Warren, Massachusetts based on their input and an analysis of local and regional economic trends and conditions. These potential economic strategies, intended to promote future economic growth, are in alignment with the Town’s core values and community goals.

Warren currently has two village centers, an active mill complex, significant open space, rivers and wetlands, and …


Haverhill Street Corridor Study: Methuen, Massachusetts, Center For Economic Development Jan 2005

Haverhill Street Corridor Study: Methuen, Massachusetts, Center For Economic Development

Center for Economic Development Technical Reports

The City of Methuen’s Department of Planning and Community Development hired a team of students from the University of Massachusetts Amherst’s Master’s in Regional Planning studio class to examine the growth impacts of a potential highway interchange reconfiguration. Exit 46 of Interstate 93 in Methuen is a failed interchange, and will likely be reconfigured in the next ten years. Methuen, a middle class city of 44,000 midway between Boston, MA and Manchester, NH, is currently experiencing significant growth pressures. The reconfigured interchange will only add to these pressures.

In consultation with the client, the studio team focused its analysis on …


From Lane To Lee A Quarry's Potential, Center For Economic Development Jan 2005

From Lane To Lee A Quarry's Potential, Center For Economic Development

Center for Economic Development Technical Reports

In collaboration with a student team from the Department of Landscape Architecture and Regional Planning at the University of Massachusetts Amherst, the Community Development Corporation of Lee explored the potential reuse of an industrial parcel owned by Lane Construction Corporation in Lee, Massachusetts. The 243-acre property is currently in operation as a gravel and sand operation and asphalt processing plant in Lenox Dale, north of Lee center.

Identified as one of the largest industrial zoned parcels in New England, the Lane site has great economic potential in the future development of the town and the surrounding region. However, the site …


Regional Land Pattern Assessment: Development Of A Resource Efficiency Measurement Method, Elizabeth Brabec, Geoffrey Mcd Lewis Jan 2005

Regional Land Pattern Assessment: Development Of A Resource Efficiency Measurement Method, Elizabeth Brabec, Geoffrey Mcd Lewis

Elizabeth Brabec

Debate on the sustainability of human settlements has recently been focused primarily on the urban portion of the land use pattern. However, urban areas rely on suburban, rural, and other less densely settled lands for their existence. In order to quantify the impacts of various land patterns on their supporting resources, these exurban lands must be included in any sustainability assessment. This need for a regional view has resulted in a measurement method that enables comparisons of relative sustainability between various regional land use patterns. Existing methods employed to assess urban sustainability are reviewed and compared with the regional characteristic …