Open Access. Powered by Scholars. Published by Universities.®

Physics Commons

Open Access. Powered by Scholars. Published by Universities.®

Environmental Sciences

Reports

Articles 1 - 2 of 2

Full-Text Articles in Physics

Hampton Roads Crossing Study Supplemental Environmental Impact Statement: Evaluation Of Potential Impact On Surface Water Elevation, Flow, Salinity, And Bottom Shear Stress, Yinglong J. Zhang, Harry V. Wang, Zhuo Liu, Mac Sisson, Jian Shen Jan 2017

Hampton Roads Crossing Study Supplemental Environmental Impact Statement: Evaluation Of Potential Impact On Surface Water Elevation, Flow, Salinity, And Bottom Shear Stress, Yinglong J. Zhang, Harry V. Wang, Zhuo Liu, Mac Sisson, Jian Shen

Reports

The purpose of this study is to evaluate the potential impacts of the proposed alternatives for the highway crossing in Hampton Roads on physical characteristics of surface water elevation, flow, salinity, and bottom shear stress. The analysis is part of the Virginia Department of Transportation (VDOT), the Federal Highway Administration, and other stakeholders’ Supplemental Environmental Impact Statement (SEIS) for Hampton Roads Crossing Study (HRCS).


Evaluation Of The Potential Impact On Flow And Sediment Transport From Proposed James River Crossings, Yinglong J. Zhang, Harry V. Wang, Zhuo Liu, Mac Sisson, Jian Shen Oct 2016

Evaluation Of The Potential Impact On Flow And Sediment Transport From Proposed James River Crossings, Yinglong J. Zhang, Harry V. Wang, Zhuo Liu, Mac Sisson, Jian Shen

Reports

The purpose of this study is to evaluate the potential impact on flow and sedimentation potential due to the proposed new crossings on the lower James River by VDOT. This project was built upon previous effort in the same area (Boon et al. 1999); the latter used VIMS’ 3D Hydrodynamic-Sedimentation Model (HYSED) to study the impact of the bridge-tunnel infrastructure on the physical characteristics (including tides, currents, circulation, salinity and sedimentation) under the existing and alternative scenarios. Due to various limitations at that time, smaller bridge pilings were not resolved but instead parameterized. In this update study, we used an …