Open Access. Powered by Scholars. Published by Universities.®
- Discipline
-
- Agricultural and Resource Economics (1)
- Animal Sciences (1)
- Aquaculture and Fisheries (1)
- Architectural Engineering (1)
- Biology (1)
-
- Climate (1)
- Earth Sciences (1)
- Environmental Indicators and Impact Assessment (1)
- Geology (1)
- Life Sciences (1)
- Natural Resource Economics (1)
- Operations Research, Systems Engineering and Industrial Engineering (1)
- Other Operations Research, Systems Engineering and Industrial Engineering (1)
- Physical and Environmental Geography (1)
Articles 1 - 2 of 2
Full-Text Articles in Fresh Water Studies
Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division
Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division
Dickey-Lincoln School Lakes Project
Objective of this study will be to assess Dickey-Lincoln in terms of its attainment of project objectives. How will this be done? The Water Resources Council in "Water and Related Land Resources -Establishment of Principles and Standards for Planning"' states that: The overall purpose of water and land resource planning is to promote the quality of life, by reflecting society's preferences for attainment of the objectives...
Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior
Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior
Dickey-Lincoln School Lakes Project
Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …