Open Access. Powered by Scholars. Published by Universities.®

Natural Resource Economics Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 31 - 34 of 34

Full-Text Articles in Natural Resource Economics

Observations On Groundwater Law From The Federal Perspective, Carol E. Dinkins Jun 1983

Observations On Groundwater Law From The Federal Perspective, Carol E. Dinkins

Groundwater: Allocation, Development and Pollution (Summer Conference, June 6-9)

66 pages.

Contains several cases and US Congress bills as supplemental materials.

Digitized copy lacks the Memorandum Opinion for City of El Paso v. Reynolds (563 F.Supp 379 (D. New Mexico 1983)).


Legal Systems For Allocating Groundwater And Controlling Its Extraction, Charles F. Wilkinson Jun 1983

Legal Systems For Allocating Groundwater And Controlling Its Extraction, Charles F. Wilkinson

Groundwater: Allocation, Development and Pollution (Summer Conference, June 6-9)

22 pages (includes illustration).

Contains research sources list (pages 1-2).


Sustaining Aquifer Productivity, Harrison C. Dunning Jun 1983

Sustaining Aquifer Productivity, Harrison C. Dunning

Groundwater: Allocation, Development and Pollution (Summer Conference, June 6-9)

12 pages.

Includes full text of the Owens Valley Groundwater Management Referendum Measure A, which is an ordinance to regulate the extraction of groundwater within the Owens Valley groundwater basin.


Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior Jan 1977

Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior

Dickey-Lincoln School Lakes Project

Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …