Open Access. Powered by Scholars. Published by Universities.®

Physical Sciences and Mathematics Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 10 of 10

Full-Text Articles in Physical Sciences and Mathematics

Diamond Mountain Resource Area Resource Management Plan And Environmental Impact Statement, Volume Ii, United States Bureau Of Land Management Jan 1993

Diamond Mountain Resource Area Resource Management Plan And Environmental Impact Statement, Volume Ii, United States Bureau Of Land Management

All U.S. Government Documents (Utah Regional Depository)

During the comment period January 3 through April 1, 1992, 286 letters were received on the Draft Diamond Mountain Resource Management Plan and Environmental Impact Statement. However, Several letters were received after the comment period closed and too late to be individually responded to in this document. The concerns and issues raised in these letters have been expressed in other comment letters which have been responded to and which are reprinted here.


Diamond Mountain Resource Area Resource Management Plan And Environmental Impact Statement, United States Bureau Of Land Management Jan 1993

Diamond Mountain Resource Area Resource Management Plan And Environmental Impact Statement, United States Bureau Of Land Management

All U.S. Government Documents (Utah Regional Depository)

This proposed resource management plan and final environmental impact statement addresses management of all resources on approximately 709,000 acres of public land administered by the Bureau of Land Management, Diamond Mountain Resource Area, Vernal District, in Daggett, Duchesne, and portions of Uintah Counties, in northeastern Utah.


Operation Of Glen Canyon Dam, Draft Environmental Impact Statement, United States Department Of The Interior Jan 1993

Operation Of Glen Canyon Dam, Draft Environmental Impact Statement, United States Department Of The Interior

All U.S. Government Documents (Utah Regional Depository)

This draft environmental impact statement (EIS) analyzes the impacts of operations from 1963 to 1990 (baseline conditions) and alternative operations of Glen Canyon Dam on downstream environmental and cultural resources of Glen and Grand Canyons. Alternative operations evaluated include three that would provide steady flows; three that would provide various levels of fluctuating flows; and two, including no action, that would provide unrestricted fluctuating flows. Additional measures have been combined with the alternative operations, where appropriate, to provide additional resource protection or enhancement. The preferred alternative is the Modified Low Fluctuating Flow Alternative.


Environmental Assessment, Proposed Predatory Animal Damage Control On Public Lands In Sweetwater, Lincoln, Uinta, And Sublette Counties, Wyoming, United States Department Of The Interior Bureau Of Land Management Jan 1993

Environmental Assessment, Proposed Predatory Animal Damage Control On Public Lands In Sweetwater, Lincoln, Uinta, And Sublette Counties, Wyoming, United States Department Of The Interior Bureau Of Land Management

Environmental Assessments (WY)

This Environmental Assessment is prepared by the Bureau of Land Management (BLM), Rock Springs District with the cooperative participation of the U.S. Department of Agriculture, Animal and Plant Health Inspection Service, Animal Damage Control Unit (USDA-APHIS-ADC, hereafter referred to as APHIS-ADC). This environmental assessment documents the environmental impact analysis of the APHIS-ADC ongoing and proposed program of predatory animal damage control for the protection of domestic livestock and wildlife within the BLM Rock Springs District. The environmental assessment analyzes the impacts associated with the full range of animal damage control activities included in the APHIS-ADC proposed Predatory Animal Damage Control …


Final Environmental Impact Statement North Slope Timber Sale Dixie National Forest Jan 1993

Final Environmental Impact Statement North Slope Timber Sale Dixie National Forest

Final environmental Impact Statements (UT)

This Final Environmental Impact Statement describes the analysis for the proposed North Slope Timber Sale. The 1,730 acre proposal area is located on the north slope of Boulder Mountain within the Teasdale Ranger District (Wayne County, Utah). Alternatives were developed for this proposal which respond to issues identified during the scoping and analysis process.


Final Environmental Impact Statement To Construct And Operate A Facility To Receive, Store, And Dispose Of 11e.(2) Byproduct Material Near Clive, Utah, United States Nuclear Regulatory Commission Jan 1993

Final Environmental Impact Statement To Construct And Operate A Facility To Receive, Store, And Dispose Of 11e.(2) Byproduct Material Near Clive, Utah, United States Nuclear Regulatory Commission

Final environmental Impact Statements (UT)

A Final Environmental Impact Statement related to the licensing of Envirocare of Utah, Inc.'s proposed disposal facility in Tooele County, Utah, (Docket No. 40-8989) for byproduct material as defined in Section 11e.(2) of the Atomic Energy Act, has been prepared by the Office of Nuclear Material Safety and Safeguards. This statement describes and evaluates (1) the purpose of and need for the proposed action, (2) alternatives considered, and (3) environmental consequences of the proposed action. The Nuclear Regulatory Commission has concluded that the proposed action evaluated under the National Environmental Policy Act of 1969 and 10 CFR Part 51, is …


Zion Canyon Headquarters, Zion National Park, Utah, Draft Development Concept Plan, Environmental Assessment, United States Department Of The Interior, National Park Service Jan 1993

Zion Canyon Headquarters, Zion National Park, Utah, Draft Development Concept Plan, Environmental Assessment, United States Department Of The Interior, National Park Service

All U.S. Government Documents (Utah Regional Depository)

The study area, referred to as the headquarters area, incorporates the area from the south entrance station north to the Zion Canyon bridge. This includes the visitor center, the Watchman and South campgrounds, the amphitheaters, the nature center, the Oak Creek, Watchman, and Pine Creek residential areas, and the Oak Creek maintenance area. The study area encompasses approximately 325 acres. It includes a development zone (107 acres) and a natural zone (218 acres), and is surrounded by a proposed wilderness subzone.


Final Environmental Impact Statement Moyer Salt Timber Sale, United States Forest Service Jan 1993

Final Environmental Impact Statement Moyer Salt Timber Sale, United States Forest Service

Final Environmental Impact Statements (ID)

This Final Environmental Impact Statement documents the analysis of the effects of the proposed timber harvesting and related road construction in the 15,360 acre Moyer Salt Analysis Area. The proposed actions are designed to help achieve the silvicultural goals and objectives of the 1988 Salmon National Forest Land and Resource Management Plan (Forest Plan).


Timpanogos Cave National Monument Environmental Impact Statement, General Management Plan, Development Concept Plan, United States Department Of The Interior National Park Service Jan 1993

Timpanogos Cave National Monument Environmental Impact Statement, General Management Plan, Development Concept Plan, United States Department Of The Interior National Park Service

All U.S. Government Documents (Utah Regional Depository)

This plan was initiated to fulfill the legal requirements as mandated by section 604 of Public Law 95-625 and is in compliance with NPS management policies, applicable legislation, and executive requirements. The purpose of this Environmental Impact Statement/General Management Plan/Development Concept Plan is to identify and assess the various management alternatives and associated potential environmental impacts relative to monument operations, visitor use and access, natural and cultural resource management, and general development at Timpanogos Cave National Monument. In developing these alternatives, special attention was focused on the management objectives of the monument and current issues as presented in the "Purpose …


Price - San Rafael Rivers Unit, Utah, Planning Report / Final Environmental Impact Statement, Colorado River Water Quality Improvement Program / Colorado River Salinity Control Program, United States Department Of The Interior, Bureau Of Reclamation And United States Department Of Agriculture, Soil Conservation Service Jan 1993

Price - San Rafael Rivers Unit, Utah, Planning Report / Final Environmental Impact Statement, Colorado River Water Quality Improvement Program / Colorado River Salinity Control Program, United States Department Of The Interior, Bureau Of Reclamation And United States Department Of Agriculture, Soil Conservation Service

All U.S. Government Documents (Utah Regional Depository)

This integrated Planning Report/Final Environmental Impact Statement (PR/FEIS) presents an analysis of the planning process and the environmental impacts of the proposed Price-San Rafael Rivers Unit (Unit) of the Colorado River Water Quality Improvement Program (CRWQIP) and the Colorado River Salinity Control Program (CRSC). The document has been jointly prepared by the Bureau of Reclamation (Reclamation) and the Soil Conservation Service (SCS) to address the full range of potential environmental impacts, in compliance with the National Environmental Policy Act (NEPA). The CRWQIP/CRSC programs provide for projects upstream of Imperial Dam (near Yuma, Arizona, on the Arizona-California border) that are necessary …