Open Access. Powered by Scholars. Published by Universities.®

Life Sciences Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 6 of 6

Full-Text Articles in Life Sciences

Middlesex County Tidal Marsh Inventory, Walter L. Priest Iii, Gene M. Silberhorn Jun 1981

Middlesex County Tidal Marsh Inventory, Walter L. Priest Iii, Gene M. Silberhorn

Reports

No abstract provided.


Surry County Tidal Marsh Inventory, Kenneth A. Moore, Gene M. Silberhorn May 1981

Surry County Tidal Marsh Inventory, Kenneth A. Moore, Gene M. Silberhorn

Reports

No abstract provided.


Maine's Whitewater Rapids And Their Relevance To The Critical Areas Program, Janet Mcmahon Apr 1981

Maine's Whitewater Rapids And Their Relevance To The Critical Areas Program, Janet Mcmahon

Maine Collection

Maine's Whitewater Rapids and Their Relevance to the Critical Areas Program

by Janet McMahon

Planning Report No. 74, Critical Areas Program, 184 State St., Augusta, Maine,

April, 1981 (additions made in October, 1981). Reprinted July, 1983.

Contents: Introduction / Natural History of Whitewater Rapids / Methods / Criteria / Results / Conclusions / General Evaluation of Whitewater Rapids for Inclusion on the Register of Critical Areas / Bibliography / Action Plan


Isle Of Wight Tidal Marsh Inventory, Gene M. Silberhorn, Arthur F. Harris Jr. Apr 1981

Isle Of Wight Tidal Marsh Inventory, Gene M. Silberhorn, Arthur F. Harris Jr.

Reports

No abstract provided.


Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, New England Division, United States Army Engineer Division Jan 1981

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

This document contains those comments and responses on the Revised Draft Environmental Impact Statement. It is a continuation of Volume II published by the Corps in 1978. In addition, it contains reproductions of those letters of comment received on the March 1980 Draft Fish and Wildlife Mitigation Plan, and the responses to these comments.


Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England Jan 1981

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England

Dickey-Lincoln School Lakes Project

The proposed Dickey-Lincoln School Lakes Project in northern Maine is a multipurpose installation on the St.John River. The combination hydroelectric power and flood control project is located in Aroostook County, Maine, near the Canadian border. The two proposed earth fill dams located at Dickey are 10,200 feet in length with a maximum height of 335 feet. They would impound 7.7 million acre feet of water at a maximum pool elevation 910 feet mean sea level. A second earth filled dam located 11 miles downstream at Lincoln School would serve as a regulatory dam. It would be 2100 feet in lenqth, …