Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England Jan 1981

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England

Dickey-Lincoln School Lakes Project

The proposed Dickey-Lincoln School Lakes Project in northern Maine is a multipurpose installation on the St.John River. The combination hydroelectric power and flood control project is located in Aroostook County, Maine, near the Canadian border. The two proposed earth fill dams located at Dickey are 10,200 feet in length with a maximum height of 335 feet. They would impound 7.7 million acre feet of water at a maximum pool elevation 910 feet mean sea level. A second earth filled dam located 11 miles downstream at Lincoln School would serve as a regulatory dam. It would be 2100 feet in lenqth, …


Federal Water Pollution Control Act Section "404" Evaluation For Dickey-Lincoln School Lakes, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers Jan 1980

Federal Water Pollution Control Act Section "404" Evaluation For Dickey-Lincoln School Lakes, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The purpose of this report is to relate various aspects of the proposed Dickey-Lincoln School Lakes Hydroelectric Project to appropriate considerations defined by Section 404 of the Federal Water Pollution Control Act of 1972.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The principal objective of this study is to identify the major types and intensity of social and economic impacts anticipated with the proposed pre-construction, construction, operation and maintenance of the Dickey-Lincoln transmission line. In order to address the types of anticipated impacts it was necessary to first develop a socio-economic profile of the affected area.


Alternative Power Transmission Corridors. Map Volume., United States. Department Of Energy Jan 1978

Alternative Power Transmission Corridors. Map Volume., United States. Department Of Energy

Dickey-Lincoln School Lakes Project

Source data for base map taken from US Geological Survey Topographic Maps. 1:250.000 scale series. Horizontal and vertical control depicted herein is relative to the U S.G S source maps.


Revised Draft Impact Statement Issued For Dickey-Lincoln, New England Division, United States Army Corps Of Engineers Jan 1978

Revised Draft Impact Statement Issued For Dickey-Lincoln, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The revised draft combines data previously published in two separate impact statements prepared by the Corps relating to the dams, reservoirs and Power Plants and by the U. S. Department of Energy for transmission facilities to link the St. John River development to the New England power grid.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route, and an environmental impact statement as required by the National Environmental Policy Act of 1969. This report, one of several covering various topical areas, is published as an appendix to that statement.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix E: Ecological Resources Impact Study, United States Department Of Energy, Dickey-Lincoln School Lakes Project Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix E: Ecological Resources Impact Study, United States Department Of Energy, Dickey-Lincoln School Lakes Project

Dickey-Lincoln School Lakes Project

The responsibility for marketing federally generated power (under provisions of the Flood Control Act of 1944) was transferred from the Department of the Interior to the newly formed Department of Energy. The power transmission portions of the Dickey- Lincoln School Lakes Project were included in that transfer. The U.S. Department of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route and an environmental impact statement, as required by the National …


Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior Jan 1977

Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior

Dickey-Lincoln School Lakes Project

Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …


Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers Jan 1976

Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The purpose of the proposed Dickey-Lincoln School Lakes Hydroelectric Project is to convert the natural energy of the upper St. John River in northern Maine for use as a source of electricity to meet future needs of New England consumers.


[Letter From New England Regional Director To Division Engineer, New England Division, U.S. Army Corps Of Engineers], U.S. Fish And Wildlife Service Jan 1976

[Letter From New England Regional Director To Division Engineer, New England Division, U.S. Army Corps Of Engineers], U.S. Fish And Wildlife Service

Dickey-Lincoln School Lakes Project

The results of appraisals conducted jointly by this Service, the Maine Department of Inland Fisheries and Wildlife, and your agency concerning bald eagle, osprey, peregrine falcon, and great blue heron.


A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter Jan 1973

A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter

Dickey-Lincoln School Lakes Project

This report was under-taken primarily to evaluate the impact that the construction of the Dickey-Lincoln project would have upon the resources of the Upper St. John River, and to examine the assertion that the Dickey-Lincoln project constitutes a wise use of the public's environmental and economic resources. Since the case that has been made for the construction of the Dickey-Lincoln project rest primarily on the justification of the project in economic terms, this aspect of the project proposal will be intensively explored.