Open Access. Powered by Scholars. Published by Universities.®

Other Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Other Engineering

What Lessons Can Be Learned From The Delivery Of The First Building On The Grangegorman Campus Using Building Information Management (Bim)?, Pat O'Sullivan, Avril Behan Nov 2017

What Lessons Can Be Learned From The Delivery Of The First Building On The Grangegorman Campus Using Building Information Management (Bim)?, Pat O'Sullivan, Avril Behan

Conference papers

There is an acceptance that BIM, via data management, can be integrated with FM to reduce costs during the Operations and Maintenance stage of a project. However, what has not been documented is the ‘on the ground’ reality which can be reviewed as a lessons learnt exercise to improve the implementation of BIM FM for future projects. This case study sets out to explore the realities of a client’s adoption of BIM based upon the actual experience of the Greenway Hub. Rather than relying on anecdotal evidence the research was based upon the real practices and experiences of the Dublin …


Linking Geospatial Engineering Into Collaborative Multidisciplinary Bim Projects - An Educational Perspective, Avril Behan, Helen Murray, Jonathan Argue, Ronan Hogan, Audrey Martin, Pat O'Sullivan, Robert Moore, Malachy Mathews Jan 2017

Linking Geospatial Engineering Into Collaborative Multidisciplinary Bim Projects - An Educational Perspective, Avril Behan, Helen Murray, Jonathan Argue, Ronan Hogan, Audrey Martin, Pat O'Sullivan, Robert Moore, Malachy Mathews

Conference papers

This paper describes the background to and execution of a postgraduate project undertaken by students on DIT's MSc in Geospatial Engineering (GeoEng) in support of a project on level 2 BIM being undertaken by students on the MSc in applied Building Information Modelling & Management (aBIMM) around the retrofit of and new build extension to the Grangegorman Clock Tower Building. In support of this requirement, an external and internal survey of the existing structure and its surrounding topography was required. The aBIMM students and staff acted as the Design Team who subcontracted the Geo Eng group who were organised into …