Open Access. Powered by Scholars. Published by Universities.®

Other Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 4 of 4

Full-Text Articles in Other Engineering

Influence Of Site And System Parameters On The Performance Of Roof-Top Grid-Connected Pv Systems Installed In Harlequins, Belfast, Northern Ireland, Chibuisi Chinasaokwu Okorieimoh, Brian Norton, Michael Conlon, Desmond Lalor, Ciaran Mcnamara Feb 2022

Influence Of Site And System Parameters On The Performance Of Roof-Top Grid-Connected Pv Systems Installed In Harlequins, Belfast, Northern Ireland, Chibuisi Chinasaokwu Okorieimoh, Brian Norton, Michael Conlon, Desmond Lalor, Ciaran Mcnamara

Other Resources

The problem of energy scarcity has hit a global scale because of the dependency of most of the energy generation on non-renewable sources (e.g., fossil fuels). As in supply and demand laws, the lower the amount of energy provided, the more expensive it becomes, causing a major problem for the industry in general, which is dependent on it. These non-renewable energy sources contribute to environmental degradation effects and depletion of the ozone layer from the atmosphere. To reduce this effect, the use of renewable energy sources which is environmentally friendly has been on the growing index across the globe.

Solar …


Standardisation In Construction Cost Control, Charles Mitchell Mar 2019

Standardisation In Construction Cost Control, Charles Mitchell

Other Resources

Poster presentation submitted as to the School of Surveying and Construction Management Research and Innovation Industry Evening, March 2019.


A Time For Change” An Evaluation Of The Ability Of The Quantity Surveyor To Measure Mechanical And Electrical Services Under The Irish Public Works Contracts (Designed By The Employer) Using The Agreed Rules Of Measurement., Charles Mitchell Sep 2016

A Time For Change” An Evaluation Of The Ability Of The Quantity Surveyor To Measure Mechanical And Electrical Services Under The Irish Public Works Contracts (Designed By The Employer) Using The Agreed Rules Of Measurement., Charles Mitchell

Other Resources

Abstract

This dissertation seeks to examine the ability of the quantity surveyor to measure mechanical and electrical bills of quantities under the Irish Public Works Contracts using the Agreed Rules of Measurement 4. The study uses the opinions and perspectives of a broad range of industry stakeholders to identify barriers and drivers which will facilitate this change.

A mixed methodology research method incorporating both quantitative and qualitative research methods was used. A literature review covers relevant research in the field of the Public Works Contracts, the use of bills of quantities and specialist sub-contractors. The results of an unreported survey …


An Investigation Of Block Searching Algorithms For Video Frame Codecs, Jerome Casey Jan 2008

An Investigation Of Block Searching Algorithms For Video Frame Codecs, Jerome Casey

Other Resources

Block matching is the most computationally demanding aspect of the video encoding process. In many applications real-time video encoding is desired and therefore it is important that the encoding is fast. Also where handheld devices such as a PDA or mobile phone are concerned a less computationally intensive algorithm means a simpler processor can be used which saves on hardware costs and also extends battery life. An optimised algorithm also allows these devices to be used in low bandwidth wireless networks. The challenge is to decrease the computational load on the system without compromising the quality of the video stream …