Eagle Medical Tray Denesting & Debris Removal Process, Nicholas Allen Ungefug, Noah Chavez, Susana Shu-Lin Okhuysen, Michael Augustine Pennington Jun 2022

Eagle Medical Tray Denesting & Debris Removal Process, Nicholas Allen Ungefug, Noah Chavez, Susana Shu-Lin Okhuysen, Michael Augustine Pennington

Industrial and Manufacturing Engineering

Eagle Medical Incorporated is a contract medical device packaging and sterilization company. The company purchases thermoformed medical packaging trays, which maintain the sterility of medical devices, from various manufacturers. To ensure packaging quality and to prevent cleanroom contamination, Eagle Medical inspects and sterilizes each blister tray that they order. This process is an essential non-value-added activity that creates a bottleneck. Cleanroom employees must stop packaging medical devices and attend to the processing of blister trays and packaging solutions. The blister trays arrive at Eagle’s facility in nested stacks. Vibration and movement during shipping further compresses the stacks, which makes separation …


Application Of Assignment Problem Theory To Cal Poly's Week Of Welcome Program Presentation Schedule, Kevin T. Aban Mar 2013

Application Of Assignment Problem Theory To Cal Poly's Week Of Welcome Program Presentation Schedule, Kevin T. Aban

Industrial and Manufacturing Engineering

The Week of Welcome (WOW) is a part of Cal Poly’s Orientation Programs. One of the main objectives of WOW is to provide content to new students on a variety of different topics in the form of Awareness Presentations. The problem being addressed in this paper is that of assigning the orientation groups of incoming students to these Awareness Presentations so that they have a schedule that meets all of the necessary criteria. The most important of those requirements is schedule balance and flexibility for future use. This scheduling problem is solved through the use of operations research and binary …


Laser Clean Room Re-Design: A Manufacturing Facility Re-Layout, Jennifer J. Siu Jun 2010

Laser Clean Room Re-Design: A Manufacturing Facility Re-Layout, Jennifer J. Siu

Industrial and Manufacturing Engineering

Alcon’s Laser Clean Room fosters inefficient production practices, is outdated for its current process, and lacking in clear process/product flow. A facility re-design is applied to bring order, efficiency, and optimize flow in the laser production lines.

Deliverables include a new layout that decreases product travel distances and increases productivity as well as an implementation plan and cost/savings analysis. Major design decisions include downsizing the clean room, sorting to find waste and establishing clear process/product flows. The design was implemented within three weeks and results yield 29% reduction of product travel distance, 10.4 hrs/day saved from eliminated gowning time and …


Design And Manufacture Of Tennis Ball Retriever, Philip Hurst Jan 2010

Design And Manufacture Of Tennis Ball Retriever, Philip Hurst

Industrial and Manufacturing Engineering

No abstract provided.


Design Of A Low Cost Powered R/C Combat Airplane And Manufacturing Plan, Jonathan N. Bailey Jan 2010

Design Of A Low Cost Powered R/C Combat Airplane And Manufacturing Plan, Jonathan N. Bailey

Industrial and Manufacturing Engineering

The goals of this project are to design a low cost powered remote control combat airplane capable of outdoor flight, named the Aero EX and to develop a manufacturing plan to produce each unit at a selling price of $200, while operating at a 25 vehicle batch rate inside a 1,000 square foot facility. These goals are achieved using: Aerospace fundamentals to design the vehicle, Design for Manufacturability to optimize the design for minimal use of labor, Design for Assembly to give consumers the ability to build the vehicle without fixtures, Pull production to eliminate scheduling and match customer demand. …


Process Design For Aeration Of Facial Prosthetic, Nathaniel J. Urciuoli Jan 2010

Process Design For Aeration Of Facial Prosthetic, Nathaniel J. Urciuoli

Industrial and Manufacturing Engineering

Facial prosthetics are becoming a necessary step for the recovery of injured veterans and civilians who have suffered severe facial burning. Current users of such prosthetics are not able to wear the prosthetic for an extended period of time due to uncomfortable conditions created by the silicone material. A solution for this problem was to develop a process for creating small holes similar to skin pores that will both ventilate and aid in the evaporation of accumulated sweat under the prosthetic.

The main steps of this process were to create a flexible fixture capable of supporting and securing the prosthetic …


Design For Manufacturing Of Sports Equipment, Cedrick Bit, Christopher L. Head Jan 2010

Design For Manufacturing Of Sports Equipment, Cedrick Bit, Christopher L. Head

Industrial and Manufacturing Engineering

The purpose of this project was to validate industrial designs for a product in its conceptual stage and suggest/implement design changes that suit the contracting company’s needs while assuring the product maintains its basic functional requirements. Techniques and methods used to validate the design include 3‐D solid modeling, physical product application using rapid prototyping to produce the product. Methods of design for manufacturing were analyzed in the design. Processes used in the validation and verification of the design include solid modeling design, methods of measurements, fixture design and manufacturing processes. Full design specifications and solid model files were finalized and …