Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 3 of 3

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

The Relationship Between Management Training And Other Predictor Variables And Managerial Performance Among Selected Industrial First-Line Supervisors, Joseph Thomas Martelli Jan 1981

The Relationship Between Management Training And Other Predictor Variables And Managerial Performance Among Selected Industrial First-Line Supervisors, Joseph Thomas Martelli

Dissertations and Theses @ UNI

The purpose of this study was to determine whether a relationship exists between industrial first-line supervisors' participation in management training programs and subsequent job related performance as assessed by the subjects' overall management by objectives (MBO) performance appraisal rating .

Also, the relationship between managerial performance and predictor variables (age, years of supervisory experience, formal education level, self development, prior management training, and professional society involvement) was assessed.

Twenty-three first-line supervisors from a medium sized manufacturing organization participated in the study. A questionnaire was designed which extracted measures on the predictor variables from the subjects. Corporate management supplied the measure …


A Study Of Industrial Arts Teachers' Opinions Of Gifted And Talented Students In Black Hawk County, Iowa, James Robert Wrona Jan 1981

A Study Of Industrial Arts Teachers' Opinions Of Gifted And Talented Students In Black Hawk County, Iowa, James Robert Wrona

Dissertations and Theses @ UNI

While the handicapped and disadvantaged have enjoyed the benefit of some unique industrial arts educational programming, relatively little has been done to provide for the special educational needs of gifted and talented students. This may be partially a result of little research completed associating the gifted and talented student with industrial arts. Additionally, legislative support for gifted and talented students has been lacking. It was not until 1978, with the passage of Public Law 95-561, that programs for gifted and talented students have been granted some funding on the federal level. Although this public law can authorize up to $35 …


A Feasibility Study Of A System For Computer-Aided Selection Of Materials For Industrial Production, Seth Pardee Bates Jan 1981

A Feasibility Study Of A System For Computer-Aided Selection Of Materials For Industrial Production, Seth Pardee Bates

Dissertations and Theses @ UNI

This study was a comparative analysis of two methods of selecting materials for industrial production. The specific objectives were to find out if (a) a computer-aided materials selection system would select materials which were not significantly different from materials chosen by practicing professional engineers; and (b) the time required by the computer system to select materials would be significantly less than the time required by the engineers.

The criterion measures were (a) the closeness of fit of properties to design specifications for each material selected; and (b) the amount of time consumed by each subject in the selection of each …