Articles 1 - 8 of 8

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Emerson Electric -- Application And Results Of An Electric Energy Audit, Bruce E. Jacobs, Yildirim Omurtag Oct 1977

Emerson Electric -- Application And Results Of An Electric Energy Audit, Bruce E. Jacobs, Yildirim Omurtag

UMR-MEC Conference on Energy / UMR-DNR Conference on Energy

The objective of the study was to examine the electrical usage of an Emerson division located in the Northeast, provide a method of managing the usage and make recommendations for conservation. Both past and present usage were examined in an attempt to determine if potential savings might be realized by a reduction in energy and peak demand. Discussion will include an electrical energy tracking mechanism, ratios and indicators, use of rate consultants, state sales tax exemption clauses, and sample calculations of cost improvements on demand charges.


Dickey-Lincoln School Lakes Project: Transmission System Planning Study, United States Department Of The Interior Jan 1977

Dickey-Lincoln School Lakes Project: Transmission System Planning Study, United States Department Of The Interior

Dickey-Lincoln School Lakes Project

The purpose of this report is to investigate various transmission system alternatives and recommend a plan of service to integrate power from the Dickey-Lincoln School Lakes (D-L) Project into the New England electric power transmission system.


Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 2 Report, Acres American Incorporated Jan 1977

Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 2 Report, Acres American Incorporated

Dickey-Lincoln School Lakes Project

This report presents the results of Task 2 of this study, the overall purpose of which is the evaluation of alternative methods of providing electrical energy in New England in lieu of the Dickey-Lincoln hydroelectric project. The final Task 1 report was presented in July 1976 and will, in conjunction with this Task 2 and subsequent Tasks 3 and 4 reports, ultimately become part of the "Environmental Impact Statement" for the Dickey-Lincoln Project.


Dickey-Lincoln School Lakes Project Power Alternatives Study Draft Report : Task 1 Through 4, Acres American Incorporated Jan 1977

Dickey-Lincoln School Lakes Project Power Alternatives Study Draft Report : Task 1 Through 4, Acres American Incorporated

Dickey-Lincoln School Lakes Project

This report presents the detailed findings of Tasks 1 through 4 of the Dickey-Lincoln School Lakes Project Power Alternatives Study undertaken for the New England Division of the Corps of Engineers, by Acres American Incorporated, Consulting Engineers of Buffalo, New York under the terms of Contract Number DACW33-76-C-0047. Earlier reports on Task 1 dated July 1976, on Task 2 dated January 1977 and on Task 3 dated March 1977 have been incorporated virtually unchanged into this Task 4 report.


Report Of The Citizens' Dickey-Lincoln Project Impact Review Committee To Governor James B. Longley, John D. Robinson, James B. Longley Jan 1977

Report Of The Citizens' Dickey-Lincoln Project Impact Review Committee To Governor James B. Longley, John D. Robinson, James B. Longley

Dickey-Lincoln School Lakes Project

The construction of the Dickey-Lincoln Hydroelectric Project. To examine, in depth, the proposal and its impact as seen by various segments of our society. The report will identify the factors that must carry the main weight in making a final determination.


Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc. Jan 1977

Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

The Dickey-Lincoln Hydroelectric Dam is a water resources project proposed by the Federal Government (U. S. Army Corps of Engineers). Therefore, in accordance with the National Environmental Policy Act, the Corps of Engineers is required to prepare an environmental impact statement (EIS) on the project. A federal plan or project such as Dickey-Lincoln should take into account its effect upon man's health, safety, welfare and economic well-being, as well as effects upon the surrounding environment. More importantly, project plans should be evaluated in a "manner calculated to encourage harmony between man and his environment." In other words, project plans or …


Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division Jan 1977

Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

Objective of this study will be to assess Dickey-Lincoln in terms of its attainment of project objectives. How will this be done? The Water Resources Council in "Water and Related Land Resources -Establishment of Principles and Standards for Planning"' states that: The overall purpose of water and land resource planning is to promote the quality of life, by reflecting society's preferences for attainment of the objectives...


Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc. Jan 1977

Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

This study is to assess the effects or impacts of construction and operation of the Dickey-Lincoln hydroelectric project upon the people in the St. John Valley, Maine, and New England. Having determined the effects of the project, a second objective is to discuss mitigation of defined adverse impacts. More specifically, this study attempts to identify adverse impacts and deal with how to minimize such impacts if at all possible.