Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 23 of 23

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Computational Decision Support For Socio-Technical Awareness Of Land-Use Planning Under Complexity—A Dam Resilience Planning Case Study, Andreas Tolk, Jennifer A. Richkus, F. Leron Shults, Wesley J. Wildman Jan 2023

Computational Decision Support For Socio-Technical Awareness Of Land-Use Planning Under Complexity—A Dam Resilience Planning Case Study, Andreas Tolk, Jennifer A. Richkus, F. Leron Shults, Wesley J. Wildman

VMASC Publications

Land-use planning for modern societies requires technical competence as well as social competence. We therefore propose an integrative solution enabling better land-use planning and management through better-informed decision-making. We adapt a method developed for cross-disciplinary team building to identify the stakeholders and their various objectives and value systems. We use these results to populate artificial societies embedded into a dynamic data analytics framework as a tool to identify, explore, and visualize the challenges resulting from the different objectives and value systems in land-use planning and management. To prove the feasibility of the proposed solution, we present two use cases from …


A Decision Support Tool For Building Integrated Renewable Energy Microgrids Connected To A Smart Grid, Damilola A. Asaleye, Michael D. Murphy, Michael Breen Nov 2017

A Decision Support Tool For Building Integrated Renewable Energy Microgrids Connected To A Smart Grid, Damilola A. Asaleye, Michael D. Murphy, Michael Breen

Publications

The objective of this study was to create a tool that will enable renewable energy microgrid (REμG) facility users to make informed decisions on the utilization of electrical power output from a building integrated REμG connected to a smart grid. A decision support tool for renewable energy microgrids (DSTREM) capable of predicting photovoltaic array and wind turbine power outputs was developed. The tool simulated users’ daily electricity consumption costs, avoided CO2 emissions and incurred monetary income relative to the usage of the building integrated REμG connected to the national electricity smart grid. DSTREM forecasted climate variables, which were used …


Assessment Of Squirrel-Caused Power Outages, J. Chris Hamilton, Ron J. Johnson, Ronald M. Case, Michael W. Riley Jan 1989

Assessment Of Squirrel-Caused Power Outages, J. Chris Hamilton, Ron J. Johnson, Ronald M. Case, Michael W. Riley

School of Natural Resources: Faculty Publications

Squirrel-caused power outages in Lincoln and Omaha, Nebraska, were evaluated by examining company power outage reports and by consulting with power company representatives. Reports showed that squirrel-caused outages at pole-mounted transformers were most prevalent during May, June, and October (48% of total) and between 1 and 4 h after sunrise (38%), patterns that coincide with squirrel dispersal or morning activity periods. In Lincoln, 1980 and 1981, squirrels caused 177 outages per year, which was 24% of all outages and 90% of animal-caused outages. Estimated minimum annual costs were $23 364 for repairs, public relations, and lost revenue while meters were …


Interstate Gas Pipeline Ratemaking And Contract Implications, Henry E. Brown Mar 1983

Interstate Gas Pipeline Ratemaking And Contract Implications, Henry E. Brown

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

61 pages.

Contains references.

Contains 7 attachments.


Creditors’ Rights Involved In The Production And Sale Of Natural Gas, William M. Schultz Mar 1983

Creditors’ Rights Involved In The Production And Sale Of Natural Gas, William M. Schultz

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

101 pages (includes forms).

Contains 6 attachments.


Contractual And Other Considerations Affecting Producers, Pipelines And Distributors During Current Period Of Market Demand Constraints [Outline], Michael J. Manning Mar 1983

Contractual And Other Considerations Affecting Producers, Pipelines And Distributors During Current Period Of Market Demand Constraints [Outline], Michael J. Manning

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

6 pages.


Off-System Sales: Will They Ever Return?, Paul F. O'Konski Mar 1983

Off-System Sales: Will They Ever Return?, Paul F. O'Konski

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

5 pages.


Section 311 And 312 Of The Natural Gas Policy Act Of 1978 And Hinshaw Pipelines, Lauren Eaton Mar 1983

Section 311 And 312 Of The Natural Gas Policy Act Of 1978 And Hinshaw Pipelines, Lauren Eaton

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

5 pages.


The Natural Gas Industry In Transition, Ruth A. Maurer Mar 1983

The Natural Gas Industry In Transition, Ruth A. Maurer

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

10 pages (includes illustrations).


Drafting And Interpreting Sensitive Gas Purchase Contract Provisions, William D. Watson Mar 1983

Drafting And Interpreting Sensitive Gas Purchase Contract Provisions, William D. Watson

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

8 pages.


Agenda: Natural Gas Symposium: Contract Solutions For The Future Of Regulatory Environment, University Of Colorado Boulder. Natural Resources Law Center, University Of Houston. Law Center Mar 1983

Agenda: Natural Gas Symposium: Contract Solutions For The Future Of Regulatory Environment, University Of Colorado Boulder. Natural Resources Law Center, University Of Houston. Law Center

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

Contents:

The natural gas industry in transition / Ruth A. Maurer -- Legislative prospects for wellhead pricing of natural gas / Richard G. Morgan -- Off-system sales : will they ever return? : the interstate side / Robert C. McHugh -- Off-system sales : will they ever return? / Paul F. O'Konski -- Contractual and other considerations affecting producers, pipelines and distributors during current period of market demand constraints / Michael J. Manning -- Section 311 and 312 of the Natural Gas Policy Act of 1978 and Hinshaw pipelines / Lauren Eaton -- Drafting and interpreting sensitive gas purchase contract …


Off-System Sales – Will They Ever Return? (The Interstate Side), Robert C. Mchugh Mar 1983

Off-System Sales – Will They Ever Return? (The Interstate Side), Robert C. Mchugh

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

27 pages (includes illustrations).

Contains 2 pages of references.

Contains 1 attachment.


Legislative Prospects For Wellhead Pricing Of Natural Gas, Richard G. Morgan Mar 1983

Legislative Prospects For Wellhead Pricing Of Natural Gas, Richard G. Morgan

Natural Gas Symposium: Contract Solutions for the Future of Regulatory Environment (March 24-25)

162 pages.

Contains 16 attachments.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, one of several prepared under contract to the DOE by various consultants, is published as an appendix to that statement. Appendix F, Geotechnical Impact Study (two volumes, the second being a map volume), documents a study performed by E. C. …


Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy Jan 1978

Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy

Dickey-Lincoln School Lakes Project

This draft environmental impact statement (EIS) will describe the environmental impacts of transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Electric power produced by the project is to be integrated into the New England electric system if the project is constructed.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix E: Ecological Resources Impact Study, United States Department Of Energy, Dickey-Lincoln School Lakes Project Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix E: Ecological Resources Impact Study, United States Department Of Energy, Dickey-Lincoln School Lakes Project

Dickey-Lincoln School Lakes Project

The responsibility for marketing federally generated power (under provisions of the Flood Control Act of 1944) was transferred from the Department of the Interior to the newly formed Department of Energy. The power transmission portions of the Dickey- Lincoln School Lakes Project were included in that transfer. The U.S. Department of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route and an environmental impact statement, as required by the National …


Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc. Jan 1977

Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

The Dickey-Lincoln Hydroelectric Dam is a water resources project proposed by the Federal Government (U. S. Army Corps of Engineers). Therefore, in accordance with the National Environmental Policy Act, the Corps of Engineers is required to prepare an environmental impact statement (EIS) on the project. A federal plan or project such as Dickey-Lincoln should take into account its effect upon man's health, safety, welfare and economic well-being, as well as effects upon the surrounding environment. More importantly, project plans should be evaluated in a "manner calculated to encourage harmony between man and his environment." In other words, project plans or …


Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc. Jan 1977

Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

This study is to assess the effects or impacts of construction and operation of the Dickey-Lincoln hydroelectric project upon the people in the St. John Valley, Maine, and New England. Having determined the effects of the project, a second objective is to discuss mitigation of defined adverse impacts. More specifically, this study attempts to identify adverse impacts and deal with how to minimize such impacts if at all possible.


Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior Jan 1976

Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior

Dickey-Lincoln School Lakes Project

The regional scope of this study (a three state area of approximately 33,000 square miles) necessitated an initial investigation to determine what data was available. Known and potential sources of data were identified through the use of the Environmental Data Reconnaissance Report* prepared by Comitta Frederick Associates for the United States Depart-ment of the Interior in March 1976. The collected data was then analyzed for its accuracy, reliability, mappability and compatibility with the scope of this study.


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …


Use Of Remote Sensing To Quantify Construction Material And To Define Geologic Lineations : Dickey-Lincoln School Lakes Project, Maine, H. L. Mckim, C. J. Merry Jan 1976

Use Of Remote Sensing To Quantify Construction Material And To Define Geologic Lineations : Dickey-Lincoln School Lakes Project, Maine, H. L. Mckim, C. J. Merry

Dickey-Lincoln School Lakes Project

This report contains Appendixes A and B of Special Report 242, use of remote sensing to quantify construction material and to define geologic lineations.


Hydroelectric Power Potential At Corps Of Engineers Projects : A Report, Ralph L. Trisko, United States. Army., Institiute For Water Resources Jan 1975

Hydroelectric Power Potential At Corps Of Engineers Projects : A Report, Ralph L. Trisko, United States. Army., Institiute For Water Resources

Dickey-Lincoln School Lakes Project

This report completes phase one of the study. It is intended to fill the need, recognized at the outset, for a broad framework within which subsequent more detailed study at the project level might take place. It is an overview of physical hydropower potential in the context of energy and water resources and demands, energy economics, and federal policy, organization, and practices pertaining to hydropower development and marketing.


A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter Jan 1973

A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter

Dickey-Lincoln School Lakes Project

This report was under-taken primarily to evaluate the impact that the construction of the Dickey-Lincoln project would have upon the resources of the Upper St. John River, and to examine the assertion that the Dickey-Lincoln project constitutes a wise use of the public's environmental and economic resources. Since the case that has been made for the construction of the Dickey-Lincoln project rest primarily on the justification of the project in economic terms, this aspect of the project proposal will be intensively explored.