Articles 1 - 14 of 14

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Federal Water Pollution Control Act Section "404" Evaluation For Dickey-Lincoln School Lakes, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers Jan 1980

Federal Water Pollution Control Act Section "404" Evaluation For Dickey-Lincoln School Lakes, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The purpose of this report is to relate various aspects of the proposed Dickey-Lincoln School Lakes Hydroelectric Project to appropriate considerations defined by Section 404 of the Federal Water Pollution Control Act of 1972.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The principal objective of this study is to identify the major types and intensity of social and economic impacts anticipated with the proposed pre-construction, construction, operation and maintenance of the Dickey-Lincoln transmission line. In order to address the types of anticipated impacts it was necessary to first develop a socio-economic profile of the affected area.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, one of several prepared under contract to the DOE by various consultants, is published as an appendix to that statement. Appendix F, Geotechnical Impact Study (two volumes, the second being a map volume), documents a study performed by E. C. …


Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy Jan 1978

Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy

Dickey-Lincoln School Lakes Project

This draft environmental impact statement (EIS) will describe the environmental impacts of transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Electric power produced by the project is to be integrated into the New England electric system if the project is constructed.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix J: Historical-Archeological Impact Study, Albert A. Dekin Jr., Bruce R. Donaldson, J. Lloyd Pepper, Paul A. Robinson, Edward A. Hession, Judith A. Rasson, Public Archaeology Facility Department Of Anthropology, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix J: Historical-Archeological Impact Study, Albert A. Dekin Jr., Bruce R. Donaldson, J. Lloyd Pepper, Paul A. Robinson, Edward A. Hession, Judith A. Rasson, Public Archaeology Facility Department Of Anthropology, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The report assessing cultural resources for the Dickey/Lincoln School Transmission Project consists of five narrative chapters, a topical bibliography, and five appendices. The scope of work, together with the USDI guidelines for cultural resource survey (included in Appendix E), comprise an attitude and approach toward prehistory which is in accord with the current state of the art, not simply in terms of cultural resource management but also in terms of contemporary standards generally recognized by practitioners of anthropological archaeology.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix I: Visual-Recreation Resources Impact Study, United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route, and an environmental impact statement as required by the National Environmental Policy Act of 1969. This report, one of several covering various topical areas, is published as an appendix to that statement.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix E: Ecological Resources Impact Study, United States Department Of Energy, Dickey-Lincoln School Lakes Project Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix E: Ecological Resources Impact Study, United States Department Of Energy, Dickey-Lincoln School Lakes Project

Dickey-Lincoln School Lakes Project

The responsibility for marketing federally generated power (under provisions of the Flood Control Act of 1944) was transferred from the Department of the Interior to the newly formed Department of Energy. The power transmission portions of the Dickey- Lincoln School Lakes Project were included in that transfer. The U.S. Department of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route and an environmental impact statement, as required by the National …


Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior Jan 1976

Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior

Dickey-Lincoln School Lakes Project

This second volume of the Assessment of Alternative Power Transmission Corri-dors related to the Dickey Lincoln/School Hydroelectric Project, contains all relevant background materials to support the mapping and analysis of en-vironmental resource information. Narrative explaining what information was evaluated and the sources and reasons for its consideration are integral to this assessment.


Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers Jan 1976

Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The purpose of the proposed Dickey-Lincoln School Lakes Hydroelectric Project is to convert the natural energy of the upper St. John River in northern Maine for use as a source of electricity to meet future needs of New England consumers.


Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior Jan 1976

Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior

Dickey-Lincoln School Lakes Project

The regional scope of this study (a three state area of approximately 33,000 square miles) necessitated an initial investigation to determine what data was available. Known and potential sources of data were identified through the use of the Environmental Data Reconnaissance Report* prepared by Comitta Frederick Associates for the United States Depart-ment of the Interior in March 1976. The collected data was then analyzed for its accuracy, reliability, mappability and compatibility with the scope of this study.


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …


Scope Of Work, Environmental Impact Statement For The Dickey-Lincoln School Lakes Project, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers Jan 1975

Scope Of Work, Environmental Impact Statement For The Dickey-Lincoln School Lakes Project, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

Revised draft combines data previously published in two separate impact statements prepared by the corps relating to the dams, reservoirs and power plants and by the U. S. Department of Energy for transmission facilities to link the St. John River development to the New England power grid. The latter agency is responsible for the marketing and distribution of power generated at federally-financed installations.


Hydroelectric Power Potential At Corps Of Engineers Projects : A Report, Ralph L. Trisko, United States. Army., Institiute For Water Resources Jan 1975

Hydroelectric Power Potential At Corps Of Engineers Projects : A Report, Ralph L. Trisko, United States. Army., Institiute For Water Resources

Dickey-Lincoln School Lakes Project

This report completes phase one of the study. It is intended to fill the need, recognized at the outset, for a broad framework within which subsequent more detailed study at the project level might take place. It is an overview of physical hydropower potential in the context of energy and water resources and demands, energy economics, and federal policy, organization, and practices pertaining to hydropower development and marketing.


A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter Jan 1973

A Study Of The Dickey-Lincoln Hydroelectric Project And Its Impact On The Resources Of The Upper Saint John River Valley, Rosemary M. Manning, Sierra Club, New England Chapter

Dickey-Lincoln School Lakes Project

This report was under-taken primarily to evaluate the impact that the construction of the Dickey-Lincoln project would have upon the resources of the Upper St. John River, and to examine the assertion that the Dickey-Lincoln project constitutes a wise use of the public's environmental and economic resources. Since the case that has been made for the construction of the Dickey-Lincoln project rest primarily on the justification of the project in economic terms, this aspect of the project proposal will be intensively explored.