Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 4 of 4

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix H: Socio-Economic Impact Study, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The principal objective of this study is to identify the major types and intensity of social and economic impacts anticipated with the proposed pre-construction, construction, operation and maintenance of the Dickey-Lincoln transmission line. In order to address the types of anticipated impacts it was necessary to first develop a socio-economic profile of the affected area.


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix F: Geotechnical Impact Study, Jordan Gorrill Associates, Edward C. Jordan Co., Inc., United States Department Of Energy

Dickey-Lincoln School Lakes Project

The U.S. Departments of the Interior and Energy have conducted system planning, location, and environmental studies for the trans-mission facilities required for the Dickey-Lincoln School Hydroelectric project. These studies of many alternate routes have resulted in iden-tification of a proposed transmission line route and an environmental impact statement, as required by the National Environmental Policy Act of 1969. This report, one of several prepared under contract to the DOE by various consultants, is published as an appendix to that statement. Appendix F, Geotechnical Impact Study (two volumes, the second being a map volume), documents a study performed by E. C. …


Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix E: Ecological Resources Impact Study, United States Department Of Energy, Dickey-Lincoln School Lakes Project Jan 1978

Dickey-Lincoln School Lakes Project Transmission Studies Environmental Impact Statement: Appendix E: Ecological Resources Impact Study, United States Department Of Energy, Dickey-Lincoln School Lakes Project

Dickey-Lincoln School Lakes Project

The responsibility for marketing federally generated power (under provisions of the Flood Control Act of 1944) was transferred from the Department of the Interior to the newly formed Department of Energy. The power transmission portions of the Dickey- Lincoln School Lakes Project were included in that transfer. The U.S. Department of the Interior and Energy have conducted system planning, location, and environmental studies for the transmission facilities required for the Dickey-Lincoln School Hydroelectric Project. These studies of many alternate routes have resulted in identification of a proposed transmission line route and an environmental impact statement, as required by the National …


Scope Of Work, Environmental Impact Statement For The Dickey-Lincoln School Lakes Project, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers Jan 1975

Scope Of Work, Environmental Impact Statement For The Dickey-Lincoln School Lakes Project, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

Revised draft combines data previously published in two separate impact statements prepared by the corps relating to the dams, reservoirs and power plants and by the U. S. Department of Energy for transmission facilities to link the St. John River development to the New England power grid. The latter agency is responsible for the marketing and distribution of power generated at federally-financed installations.