Facility Redesign

Articles 1 - 5 of 5

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

Facilities Redesign Of Stockroom At Elcon Precision, David M. Brawner, Tyler O. Mastromattei, Jay Y. Matsumoto Jun 2018

Facilities Redesign Of Stockroom At Elcon Precision, David M. Brawner, Tyler O. Mastromattei, Jay Y. Matsumoto

Industrial and Manufacturing Engineering

Elcon Precision is a company based out of San Jose, California specializing in the photochemical processing of materials and brazing of metals and ceramics for a variety of different industries. Three students from the Industrial Engineering Department at California Polytechnic State University, San Luis Obispo were contacted by Elcon Precision to help redesign their stockroom and inventory areas in their San Jose location in order to allow for the future growth of the company. Elcon asked the Cal Poly project team to help increase efficiencies throughout the stockroom by creating an alternative layout that best suited the company's needs. This …


Healing Alternatives Workspace Remodel, Lissandra Ilcyn, Jenifer Astrid Colmenares, Grace E. Kuffner Jun 2018

Healing Alternatives Workspace Remodel, Lissandra Ilcyn, Jenifer Astrid Colmenares, Grace E. Kuffner

Industrial and Manufacturing Engineering

Healing Alternatives is an acupuncture office space located in a repurposed house in San Luis Obispo. Healing Alternatives’ current facility layout does not allow for an additional treatment room or the space to provide additional services because of the wasted space within the facility. Furthermore, patients can be disrupted by noise outside the treatment room causing a negative customer experience. The project team’s objectives are to:

o Design two layout alternatives

o Provide a time estimate for each alternative

o Provide a cost analysis of each alternative

o Implement 5s methodology on the storage room

o Provide a 2D-3D model …


Parker Aerospace Fluid Systems Division Product Support Facility Redesign, Sean Walker Jun 2011

Parker Aerospace Fluid Systems Division Product Support Facility Redesign, Sean Walker

Industrial and Manufacturing Engineering

With growing popularity for commercial air travel and aerial military operations comes an increase in demand for innovative, technological solutions of aircraft system components. As OEM sales of these components rise, this creates a burden on the aftermarket side of the business when these parts and systems require service in order to continue functioning properly. Parker Aerospace, Fluid Systems Division, and its Product Support Team are experiencing this growth burden and want to reconfigure necessary means within the layout to succeed in accommodating new program areas on the aftermarket side. During this process, cost reduction opportunities will be explored and …


Hardy Diagnostics Facility Redesign, Jamie W. Lam Mar 2011

Hardy Diagnostics Facility Redesign, Jamie W. Lam

Industrial and Manufacturing Engineering

This senior project is a facilities design for the plate production room at Hardy Diagnostics. This project was completed using a systematic layout planning approach. The main reason for this redesign was to consolidate all plate line production into one room. This would ensure better visability for the managers. After the project was defined, the different departments were established and the relationships between those departments were found. The space requirements needed for those departments were then measured out to also include the aisle widths and any machinery or carts needed to complete each function. Having determined all requirements for this …


5-S And The Facility Redesign For A Cleaning Products Manufacturing Company, Jonathan Eipper Jan 2010

5-S And The Facility Redesign For A Cleaning Products Manufacturing Company, Jonathan Eipper

Industrial and Manufacturing Engineering

This project deals with a “green” cleaning products company in Southern California. Business has increased 38% in the past year along with changes in production capacity and capability, so the company has identified a need for a sustainable model of manufacturing at their new and expanded facility. Goals of promoting sustainable waste management, minimizing types of lean waste, properly storing inventory, improving workplace communication, and defining production tasks will be addressed in this facilities redesign through 5S. The biggest component and outcome of the facility design will be organization. This leads to a goal of eliminating waste, which will in …