A Systemic Approach To Next Generation Infrastructure Data Elicitation And Planning Using Serious Gaming Methods, Ersin Ancel Jul 2011

A Systemic Approach To Next Generation Infrastructure Data Elicitation And Planning Using Serious Gaming Methods, Ersin Ancel

Engineering Management & Systems Engineering Theses & Dissertations

Infrastructure systems are vital to the functioning of our society and economy. However, these systems are increasingly complex and are more interdependent than ever, making them difficult to manage. In order to respond to increasing demand, environmental concerns, and natural and man-made threats, infrastructure systems have to adapt and transform. Traditional engineering design approaches and planning tools have proven to be inadequate when planning and managing these complex socio-technical system transitions. The design and implementation of next generation infrastructure systems require holistic methodologies, encompassing organizational and societal aspects in addition to technical factors. In order to do so, a serious …


Exploring The Effects Of Cooperative Adaptive Cruise Control In Mitigating Traffic Congestion, Georges M. Arnaout Apr 2011

Exploring The Effects Of Cooperative Adaptive Cruise Control In Mitigating Traffic Congestion, Georges M. Arnaout

Engineering Management & Systems Engineering Theses & Dissertations

The aim of this research is to examine the impact of CACC (Cooperative Adaptive Cruise Control) equipped vehicles on traffic-flow characteristics of a multilane highway system. The research identifies how CACC vehicles affect the dynamics of traffic flow on a road network and demonstrates the potential benefits of reducing traffic congestion due to stop-and-go traffic conditions. An agent-based traffic simulation model is developed specifically to examine the effect of these intelligent vehicles on the traffic flow dynamics. Traffic performance metrics characterizing the evolution of traffic congestion throughout the road network, are analyzed. Different CACC penetration levels are studied.

The positive …


Optimization Models And Approximate Algorithms For The Aerial Refueling Scheduling And Rescheduling Problems, Sezgin Kaplan Apr 2011

Optimization Models And Approximate Algorithms For The Aerial Refueling Scheduling And Rescheduling Problems, Sezgin Kaplan

Engineering Management & Systems Engineering Theses & Dissertations

The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for fighter aircrafts (jobs) on multiple tankers (machines) to minimize the total weighted tardiness. ARSP can be modeled as a parallel machine scheduling with release times and due date-to-deadline window. ARSP assumes that the jobs have different release times, due dates, and due date-to-deadline windows between the refueling due date and a deadline to return without refueling. The Aerial Refueling Rescheduling Problem (ARRP), on the other hand, can be defined as updating the existing AR schedule after being disrupted by job related events including the …


Delayed-Bang Approach Towards More Sustainable Critical Infrastructure Risk Management, C. Ariel Pinto, Michael K. Mcshane, Abhishek S. Pathak Jan 2011

Delayed-Bang Approach Towards More Sustainable Critical Infrastructure Risk Management, C. Ariel Pinto, Michael K. Mcshane, Abhishek S. Pathak

Finance Faculty Publications

This article describes the Delayed Bang Approach for determining the value of risk management alternatives in critical infrastructure security. The discussion includes (1) the need for sustainable risk management (2) the importance of time valuation in evaluating competing loss prevention and loss reduction alternatives, (3) the convergence of deterministic engineering economics, survivability analysis, and probabilistic analysis, and (4) hypothetical examples of the Delayed-Bang Approach and significance towards more sustainable risk management.