Open Access. Powered by Scholars. Published by Universities.®

Operations Research, Systems Engineering and Industrial Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 30 of 37

Full-Text Articles in Operations Research, Systems Engineering and Industrial Engineering

An Exploration Into The Design Of A Portable Music Player For People With Alzheimer’S And Dementia, Jaxon V. Silva Dec 2022

An Exploration Into The Design Of A Portable Music Player For People With Alzheimer’S And Dementia, Jaxon V. Silva

Liberal Arts and Engineering Studies

An exploration into the design of a portable music player for people with Alzheimer's and dementia.


Novel Hitch Cargo Cart, Cesilio Sanchez Ramirez, Lance Haidet, Richard Lontoc, Tyler Selinka Dec 2022

Novel Hitch Cargo Cart, Cesilio Sanchez Ramirez, Lance Haidet, Richard Lontoc, Tyler Selinka

Mechanical Engineering

This document presents the engineering design process used to develop, manufacture, and test a new and improved iteration of a hitch cart prototype. This process was performed by a team of four mechanical engineering seniors as part of California Polytechnic State University, San Luis Obispo’s senior design pathway. The goal of this project was to develop a sturdy and reliable iteration of our sponsor’s hitch cart prototype, that integrated the functionality of a vehicle hitch cargo platform and that of a height adjustable cargo cart into a single streamlined and easy to use product. This design could be used by …


Eagle Medical Tray Denesting & Debris Removal Process, Nicholas Allen Ungefug, Noah Chavez, Susana Shu-Lin Okhuysen, Michael Augustine Pennington Jun 2022

Eagle Medical Tray Denesting & Debris Removal Process, Nicholas Allen Ungefug, Noah Chavez, Susana Shu-Lin Okhuysen, Michael Augustine Pennington

Industrial and Manufacturing Engineering

Eagle Medical Incorporated is a contract medical device packaging and sterilization company. The company purchases thermoformed medical packaging trays, which maintain the sterility of medical devices, from various manufacturers. To ensure packaging quality and to prevent cleanroom contamination, Eagle Medical inspects and sterilizes each blister tray that they order. This process is an essential non-value-added activity that creates a bottleneck. Cleanroom employees must stop packaging medical devices and attend to the processing of blister trays and packaging solutions. The blister trays arrive at Eagle’s facility in nested stacks. Vibration and movement during shipping further compresses the stacks, which makes separation …


Smartphone Control Of Rc Cars, Weston R. Fitzgerald Jun 2022

Smartphone Control Of Rc Cars, Weston R. Fitzgerald

Electrical Engineering

The smartphone-controlled RC (remote-controlled) car is an inexpensive remote-controlled car designed to be fast and portable. Instead of manufacturing, packaging, and shipping a separate controller, the remote control is implemented in a phone application, which saves time and money in both the design process and the manufacturing process. Utilizing the user’s smartphone is more cost-effective since mobile devices are a common recurrence, and packaging fewer devices results in overall better portability of the product.

This smartphone-controlled car is speedy and intuitive to learn for typical smartphone users. The user can change the car’s speed and direction wirelessly using their phone; …


Application Of Assignment Problem Theory To Cal Poly's Week Of Welcome Program Presentation Schedule, Kevin T. Aban Mar 2013

Application Of Assignment Problem Theory To Cal Poly's Week Of Welcome Program Presentation Schedule, Kevin T. Aban

Industrial and Manufacturing Engineering

The Week of Welcome (WOW) is a part of Cal Poly’s Orientation Programs. One of the main objectives of WOW is to provide content to new students on a variety of different topics in the form of Awareness Presentations. The problem being addressed in this paper is that of assigning the orientation groups of incoming students to these Awareness Presentations so that they have a schedule that meets all of the necessary criteria. The most important of those requirements is schedule balance and flexibility for future use. This scheduling problem is solved through the use of operations research and binary …


Csp Desalination/Water Purification Unit, Sean Goodison Mar 2013

Csp Desalination/Water Purification Unit, Sean Goodison

Industrial Technology and Packaging

An estimated 3.4 million people die each year from unsanitary water or inaccessible water supply. Most of these deaths take place in the developing, third world (99%). There is a dilemma arising on the world stage as well. The water demand/supply deficit is expected to increase significantly over the next 37 years if preemptive action isn’t taken. 97% of the world water supply is oceanic, making it an attractive solution to the water deficit. Providing autonomous, “deploy and watch” systems for utilizing sustainable energy to provide purified water for unitized low pricing has the potential to penetrate a large world …


Polyparking, Christopher Blackmer, Michael Suttie Mar 2013

Polyparking, Christopher Blackmer, Michael Suttie

Biomedical Engineering

The purpose of this senior project is to analyze the various options for the implementation of a parking lot information system on the California Polytechnic State University, San Luis Obispo campus. This system would involve three main components: physical counting hardware, a database and analysis organization system, and a user interface for disseminating the gathered information. The project investigates and provides commentary on various available and commonplace systems, and the benefits and drawbacks of these systems. During the course of the project, a flexible database and user-interface was developed in Microsoft Access, which will allow counter output to be gathered …


Rfid For Inventory Of Medical Records, Johny Wu Jun 2012

Rfid For Inventory Of Medical Records, Johny Wu

Biomedical Engineering

The purpose of this project is to explore the feasibility and economic viability of the implementation of a radio frequency identification (RFID) system in a large-scale, medical office setting. Practitioners in fields such as; medicine, chiropractic, dentistry, nursing, pharmacy, allied health, and other care providers do not have a sufficient method for tracking filing forms. RFID has the potential to reduce wait time, improve checking-in time, and decrease the possibility of interchanging documents between patients.

The purpose of this RFID system is to improve upon the filing system already in place in any office setting. The major consideration behind this …


Ackermann Steering Geometry Applied To A Skateboard Truck, Daniel D. Downs Jun 2011

Ackermann Steering Geometry Applied To A Skateboard Truck, Daniel D. Downs

Industrial and Manufacturing Engineering

Conventional skateboard trucks are currently unable to meet the challenges of the modern enthusiast. They are lacking in key performance metrics such as handling, stability, and traction. Longboard enthusiasts, whom rely heavily on handling performance, are hungry for new and innovative technology to help bring the sport to the next level. The aim of this project was to solve these problems by applying specific aspects of automotive steering geometry and best engineering practices. Three successive prototypes were designed, with the first two prototype sets being manufactured and extensively tested. The first prototype served as a proof of concept, but suffered …


Cable Time Estimation Database, Joshua L. Okerman Jun 2010

Cable Time Estimation Database, Joshua L. Okerman

Industrial and Manufacturing Engineering

The use of time standards are the basis for a high efficiency system in the manufacturing environment. This project will investigate the process followed to design and develop a database used to calculate accurate cable assembly time standards used for scheduling at General Atomics. This project will then justify the use of the Cable Time Estimation Database, through an economic analysis compared to the current methods applied.


Increasing Production Capacity At A Start Up Biomedical Company, Traci J. Otsuji Jun 2010

Increasing Production Capacity At A Start Up Biomedical Company, Traci J. Otsuji

Industrial and Manufacturing Engineering

The following senior project was first introduced during a summer internship at a biomedical company called Asthmatx Inc. Asthmatx is responsible for the development and manufacturing of a catheter‐based device for moderate to severe cases of asthma. Upon the approval of FDA, Asthmatx had planned to ramp up their production capacity significantly in order to accommodate the potential growth.

The first step in the process improvement was a facility reconfiguration that involved the adjustment of process sequencing and the implementation of ergonomic catheter channels. Next, time studies were conducted to gain more accurate time standards of the production process. After …


Police Operations Simulation, Robert Mcgee Jun 2010

Police Operations Simulation, Robert Mcgee

Industrial and Manufacturing Engineering

In this report, the author explains the process of creating the Police Operations Simulation, shows step-by-step how it works, and statistically analyzes the results from SLOPD’s own proposed and current schedules. The data-gathering from the department and the simulation itself will receive the bulk of the coverage in this report, followed by sample results from SLOPD and a business plan for future sale to other departments.

Using the given numbers, it appears that the proposed schedule will result in significantly improved coverage for the city of San Luis Obispo. While any increase in the number officers on patrol tends to …


Process Improvement For The Department Of Surgery Sierra Vista Medical Center, Jessica Paz Jun 2010

Process Improvement For The Department Of Surgery Sierra Vista Medical Center, Jessica Paz

Industrial and Manufacturing Engineering

This report proposes and analyzes process improvement methods for the Surgical Services Department at Sierra Vista Regional Medical Center. The department currently operates with an average of 25% of elective cases starting on time. This can be attributed to a number of inefficiencies that occur throughout the hospital.

The following Industrial Engineering methods were utilized to improve patient flow:  creation of a data collection system to quantify delays  use of simulation and facility redesign techniques to determine feasibility and benefits of moving towards a surgical center model  development of a user interfaced database to record and analyze …


Laser Clean Room Re-Design: A Manufacturing Facility Re-Layout, Jennifer J. Siu Jun 2010

Laser Clean Room Re-Design: A Manufacturing Facility Re-Layout, Jennifer J. Siu

Industrial and Manufacturing Engineering

Alcon’s Laser Clean Room fosters inefficient production practices, is outdated for its current process, and lacking in clear process/product flow. A facility re-design is applied to bring order, efficiency, and optimize flow in the laser production lines.

Deliverables include a new layout that decreases product travel distances and increases productivity as well as an implementation plan and cost/savings analysis. Major design decisions include downsizing the clean room, sorting to find waste and establishing clear process/product flows. The design was implemented within three weeks and results yield 29% reduction of product travel distance, 10.4 hrs/day saved from eliminated gowning time and …


Lean Inventory Management System For Boeing Missile Defense, Danielle Partridge Jun 2010

Lean Inventory Management System For Boeing Missile Defense, Danielle Partridge

Industrial and Manufacturing Engineering

Lean inventory management is influential for business. One of the wastes businesses aim to reduce, using lean principles, is inventory. Inventory management provides the essential tools for eliminating extra inventory and cost that is tied up in capital.

Boeing’s Ground Based Missile Defense inventory area was failing at meeting their proprietary lean manufacturing goals. There was a need for an inventory system that included: lean principles, inventory management and user-friendly capability. The goal of this project’s inventory management database process was to minimize inventory investment while still meeting functional requirements. The deliverables for this project met the needs of Boeing’s …


An Alternative To Stretch Wrap Using Triple Bottom Line, Christian Guirola Jun 2010

An Alternative To Stretch Wrap Using Triple Bottom Line, Christian Guirola

Industrial and Manufacturing Engineering

Packaging products has always been a major sector of industries. Mass producing manufacturing companies use wooden pallets to store and transport items; these products are stacked and then secured by wrapping stretch wrap around them. The main issue with this packaging method is that millions of pounds of waste is produced. Some of the other effects include green house gas emissions during its production, limited recycling, and high packaging costs. In order to reduce the amounts of stretch wrap used by industries and distribution centers, there was a need to research and evaluate alternate methods to secure products on pallets. …


Implementing Rfid To Improve Animal Shelter Inventory And Allocation, Adam Mach Jan 2010

Implementing Rfid To Improve Animal Shelter Inventory And Allocation, Adam Mach

Industrial and Manufacturing Engineering

The purpose of this project is to observe the best way to incorporate Radio Frequency Identification (RFID) technology into the animal inventory system present in animal shelters, while also observing the benefits of implementing this system. The Woods Humane Society was used in this project as a sample animal care facility that could benefit from this application.

Many RFID systems can be observed in other industries, but very few examples this technology exist in animal shelters or smaller animal care facilities. Part of the reason for that is because funds are scarce at most animal care facilities, like the Woods …


Design And Manufacture Of Tennis Ball Retriever, Philip Hurst Jan 2010

Design And Manufacture Of Tennis Ball Retriever, Philip Hurst

Industrial and Manufacturing Engineering

No abstract provided.


Design And Development Of An Integrated Waste Management System For Huai Nam Khun, Thailand, Annie Duong Jan 2010

Design And Development Of An Integrated Waste Management System For Huai Nam Khun, Thailand, Annie Duong

Industrial and Manufacturing Engineering

Background

A rural village in Thailand has always been limited in access to waste collection services and processing facilities. As a result, their behaviors of disposing waste in ineffective manners such as dumping and burning causes a variety of environmental impacts. In addition, the people dwelling in these areas are often unaware of the health risks associated to these types of engagements because of the inadequate education system. For a long time coming these circumstances remained untouched until a non-profit organization recently shed light to the need for a solution. An investigation, to develop a design solution in order to …


5-S And The Facility Redesign For A Cleaning Products Manufacturing Company, Jonathan Eipper Jan 2010

5-S And The Facility Redesign For A Cleaning Products Manufacturing Company, Jonathan Eipper

Industrial and Manufacturing Engineering

This project deals with a “green” cleaning products company in Southern California. Business has increased 38% in the past year along with changes in production capacity and capability, so the company has identified a need for a sustainable model of manufacturing at their new and expanded facility. Goals of promoting sustainable waste management, minimizing types of lean waste, properly storing inventory, improving workplace communication, and defining production tasks will be addressed in this facilities redesign through 5S. The biggest component and outcome of the facility design will be organization. This leads to a goal of eliminating waste, which will in …


Decision Analysis Tool For Appropriate Water Treatment Technologies In Improverished Villages, Conner David Johnston Jan 2010

Decision Analysis Tool For Appropriate Water Treatment Technologies In Improverished Villages, Conner David Johnston

Industrial and Manufacturing Engineering

No abstract provided.


Ernie Ball Guitars Woodshop Facilities Redesign, Cameron Lea Schlemer Jan 2010

Ernie Ball Guitars Woodshop Facilities Redesign, Cameron Lea Schlemer

Industrial and Manufacturing Engineering

This report details a facilities design for Ernie Ball’s guitar and bass guitar manufacturing facility in San Luis Obispo, CA. Specifically, this project will redesign the layout for the Woodshop, the largest of the 5 manufacturing cells in the facility. This project was completed using the Systematic Layout Planning procedure and focused mostly on phase II and III in which the specifics for a layout are determined, however, space requirements were not evaluated as it was not within scope.

The first step was to develop departments in the facilities; two master departments were identified for the neck manufacturing process and …


Determining A Reliability Factor For Photovoltaic's In San Luis Obispo, Ryan S. Roach Jan 2010

Determining A Reliability Factor For Photovoltaic's In San Luis Obispo, Ryan S. Roach

Industrial and Manufacturing Engineering

This project will analyze raw photovoltaic (PV) solar panel performance data in order to determine a reliability factor for solar panels in San Luis Obispo. This project is a subset of a larger project being performed by SLO RESCO, which is funded by a grant from the California Energy Commission. Their project will explore the use of solar, wind, geothermal, and biomass renewable resources. The scope of this project is limited to a small section of RESCO's analysis of solar panel technology and implementation in which a reliability factor will be generated.

The objective is to determine a reliability factor …


Process Design For Aeration Of Facial Prosthetic, Nathaniel J. Urciuoli Jan 2010

Process Design For Aeration Of Facial Prosthetic, Nathaniel J. Urciuoli

Industrial and Manufacturing Engineering

Facial prosthetics are becoming a necessary step for the recovery of injured veterans and civilians who have suffered severe facial burning. Current users of such prosthetics are not able to wear the prosthetic for an extended period of time due to uncomfortable conditions created by the silicone material. A solution for this problem was to develop a process for creating small holes similar to skin pores that will both ventilate and aid in the evaporation of accumulated sweat under the prosthetic.

The main steps of this process were to create a flexible fixture capable of supporting and securing the prosthetic …


Application Of Radio Frequency Identification To An Asset Checkout System, Ma'ayan K. Bennaim Jan 2010

Application Of Radio Frequency Identification To An Asset Checkout System, Ma'ayan K. Bennaim

Industrial and Manufacturing Engineering

Radio Frequency Identification (RFID) is a growing technology which is increasingly utilized throughout industry. This senior project identifies an RFID alternative to the checkout system in the tool crib of the Cal Poly Aero Hanger. A new database is designed and built to interface with an RFIDeas AIR enroll reader. The system realizes vast time savings in check in times and increases student accountability for the tools which are checked out by tagging tools.


Layout And Procedure Re-Design Of Dcpp Receiving Warehouse, Nicole Elizabeth Riegel Jan 2010

Layout And Procedure Re-Design Of Dcpp Receiving Warehouse, Nicole Elizabeth Riegel

Industrial and Manufacturing Engineering

The receiving warehouse at Diablo Canyon Power Plant, owned by Pacific Gas and Electric, serves as a place to recognize the receiving of items into an ERP system, repackage and label items for long-term storage, and organize items for delivery inside the secured area. The warehouse managers would like to redesign the layout and procedures of the warehouse. Currently items are not received, scanned, or shipped in a timely manner. The flow of people and items in the receiving and shipping area is chaotic and space is limited especially during plant outages. The objective of this project is to: • …


Environmental Savings Tracking System For Cisco Systems, Inc., Lauren J. Herrera Jan 2010

Environmental Savings Tracking System For Cisco Systems, Inc., Lauren J. Herrera

Industrial and Manufacturing Engineering

This paper illustrates the research, methodology and design used to create an environmental savings tracking system, also known as the Green Dashboard, for Cisco Systems Inc.’s Green Initiatives Group to quantify and capture an annualized summary of savings from projects initiated within its Customer Value Chain Management Organization. It articulately describes the

methodology behind the selection of metrics and the design of the process required to collect and track these quantitative direct savings. As well as describes the benefits associated with implementing this system, such as shifting Cisco towards more sustainable products and increased customer satisfaction and investor relations by …


E.J. Gallo Winery Spirit-Makers Facility, Aaron Pickar Jan 2010

E.J. Gallo Winery Spirit-Makers Facility, Aaron Pickar

Industrial and Manufacturing Engineering

With growing demand for E.J. Gallo spirit brands, the cramped and cluttered facility allocated to the spirit-makers does not provide an adequate work environment to design and test new hard alcohols. E.J. Gallo Winery wants to relocate the spirit-makers to a new facility located near the brandy production floor for under 200,000 dollars. In order to do this, a revised systematic approach to facility design is used.

In this process, the departments are first defined, then the relationships between these departments and the space requirements are documented. Once these planning steps are complete, alternative layouts are constructed and analyzed until …


Digester Selection And Operation For Heybeli Island, Spencer Fackler, Joseph Violetti Jan 2010

Digester Selection And Operation For Heybeli Island, Spencer Fackler, Joseph Violetti

Industrial and Manufacturing Engineering

The Heybeli Digester project originated with Sema Alptekin in her personal research and was incorporated into a Senior Project opportunity at California Polytechnic State University, San Luis Obispo. The aim of this project was to select and design a plan for the use of a digester for the island of Heybeli, Turkey. The objective of this plan was to incorporate economic, social, and environmental justifications to evaluate if a digester would be a benefit to the community.

Systems Engineering analysis is a vital tool when working with complicated projects that include multiple systems interfacing with one another. Through the use …


Design For Manufacturing Of Sports Equipment, Cedrick Bit, Christopher L. Head Jan 2010

Design For Manufacturing Of Sports Equipment, Cedrick Bit, Christopher L. Head

Industrial and Manufacturing Engineering

The purpose of this project was to validate industrial designs for a product in its conceptual stage and suggest/implement design changes that suit the contracting company’s needs while assuring the product maintains its basic functional requirements. Techniques and methods used to validate the design include 3‐D solid modeling, physical product application using rapid prototyping to produce the product. Methods of design for manufacturing were analyzed in the design. Processes used in the validation and verification of the design include solid modeling design, methods of measurements, fixture design and manufacturing processes. Full design specifications and solid model files were finalized and …