Open Access. Powered by Scholars. Published by Universities.®
Articles 1 - 1 of 1
Full-Text Articles in Mechanical Engineering
Itw Deltar Model Factory, Bri Hollowell, Tyler Rogers, Jake Klingelsmith
Itw Deltar Model Factory, Bri Hollowell, Tyler Rogers, Jake Klingelsmith
Scholar Week 2016 - present
The project given to the design team was a request from ITW Deltar to improve their packaging system for some production machines in cell C. The primary goal of the project is to optimize the safety and workflow of the packaging systems in cell C. The safety of the packaging system will be determined using the REBA risk assessment number. The workflow improvement is determined through analysis of the packaging time and the walking distances of the workers.
The design team identified the functional requirements and design constraints that need to be met. These functional requirements include the packaging system …