Pre-Construction Rock Treatment And Soil Modification Program Using Low Mobility Grout To Mitigate Future Sinkhole Development In A 2,787.1 Square Meter (30,000 Sf) Maintenance Facility, Steven W. Shifflett Oct 2015

Pre-Construction Rock Treatment And Soil Modification Program Using Low Mobility Grout To Mitigate Future Sinkhole Development In A 2,787.1 Square Meter (30,000 Sf) Maintenance Facility, Steven W. Shifflett

Sinkhole Conference 2015

The US Army required construction of a 2,787.1 square meters (30,000 sf) maintenance facility supported on shallow foundations at the Fort Campbell Military Installation. During the subsurface investigation a seven foot air-filled void was encountered in the bedrock within the building footprint. Electrical Resistivity Imaging (ERI) was conducted in an attempt to determine the lateral extent of the encountered void and to establish the general prevalence of karst features at the site. Due to uncertainty in the subsurface conditions, a rock treatment and soil modification program was developed which consisted of a series of targeted exploratory grout holes advanced in …