Open Access. Powered by Scholars. Published by Universities.®

Civil Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Innovative Research Publications IRP India

Selected Works

2015

Integral Abutment bridge; Skew angle; creep; soilstructure interaction

Articles 1 - 1 of 1

Full-Text Articles in Civil Engineering

Long-Term Response Prediction Of Skewed Integral Bridges Under Creep Effects, Innovative Research Publications Irp India, Akilu Muhammad, Redzuan Abdullah, Ibrahim Ogiri Hassan Jan 2015

Long-Term Response Prediction Of Skewed Integral Bridges Under Creep Effects, Innovative Research Publications Irp India, Akilu Muhammad, Redzuan Abdullah, Ibrahim Ogiri Hassan

Innovative Research Publications IRP India

A research was carried out to assess the effect of concrete creep on long-term performance of skewed Integral Abutment Bridge. Time-history transient analysis was conducted using Finite Element method for 75-year period. Parametric study was conducted in LUSAS to assess the effect of bridge total length (60m,90m,150m), skew angles (00 ,100 ,200 ,300 ,400 ), backfill soil stiffness (dense sand, loose sand) on the behaviour of the bridge measured by girder and abutment displacement, moment and shears. Three dimensional nonlinear thick beam element with CEP-FIP 1990 creep material properties was used to model bridge girders. Other structural members were modelled …