Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Mechanical engineering

Civil and Environmental Engineering

Articles 1 - 2 of 2

Full-Text Articles in Engineering

Polyurethane-Carbon Microfiber Composite Coating For Electrical Heating Of Concrete Pavement Surfaces, Alireza Sassani, Ali Arabzadeh, Halil Ceylan, Sunghwan Kim, Kasthurirangan Gopalakrishnan, Peter C. Taylor, Ali Nahvi Aug 2019

Polyurethane-Carbon Microfiber Composite Coating For Electrical Heating Of Concrete Pavement Surfaces, Alireza Sassani, Ali Arabzadeh, Halil Ceylan, Sunghwan Kim, Kasthurirangan Gopalakrishnan, Peter C. Taylor, Ali Nahvi

Ali Nahvi

Electrically-heated pavements have attracted attention as alternatives to the traditional ice/snow removal practices. Electrically conductive polymer-carbon composite coatings provide promising properties for this application. Based on the concept of joule heating, the conductive composite can be utilized as a resistor that generates heat by electric current and increases the surface temperature to melt the ice and snow on the pavement surface. This research investigates the feasibility of applying an electrically conductive composite coating made with a Polyurethane (PU) binder and micrometer-scale carbon fiber (CMF) filler as the electrical heating materials on the surface of Portland cement concrete (PCC) pavements. PU-CMF …


Fatigue Of Drill Pipes Used In Horizontal Directional Drilling, Feibai Ma Apr 2004

Fatigue Of Drill Pipes Used In Horizontal Directional Drilling, Feibai Ma

Doctoral Dissertations

Fatigue is the most common cause of mini-HDD drill rod failure. It can occur at stress levels far below the normal operating stress in most drill stem components. Fatigue failures occur because the drill rod, after it has been forced into a curved path, undergoes a cyclic bending stress oscillating from tension to compression in concert with the other stress components caused by torque, thrust, or pullback.

When a rod breaks underground, there is considerable extra cost caused by the delay in “fishing” out the broken rod as well as the cost of replacing the rod. On the other hand, …