Open Access. Powered by Scholars. Published by Universities.®

Engineering Commons

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 3 of 3

Full-Text Articles in Engineering

Upper Spokane River Model: Boundary Conditions And Model Setup, 2001, Spencer Slominski, Robert Leslie Annear, Chris Berger, Scott A. Wells Dec 2002

Upper Spokane River Model: Boundary Conditions And Model Setup, 2001, Spencer Slominski, Robert Leslie Annear, Chris Berger, Scott A. Wells

Civil and Environmental Engineering Faculty Publications and Presentations

The Washington Department of Ecology is interested in a water quality model for the Upper Spokane River system for use in developing Total Maximum Daily Loads (TMDLs). The goals of this modeling effort are to:

• Gather data to construct a computer simulation model of the Spokane River system including Long Lake Reservoir and the pools behind Nine Mile dam, Upper Falls dam and Upriver dam for 2001 based on the calibration conducted for 1991 and 2000 data sets, (Annear et al, 2001).

• Ensure that the model accurately represents the system hydrodynamics and water quality (flow, temperature, dissolved oxygen …


Tmdls: Statistical Correlations Or Mechanistic Modeling?, Scott A. Wells, Thomas M. Cole Nov 2002

Tmdls: Statistical Correlations Or Mechanistic Modeling?, Scott A. Wells, Thomas M. Cole

Civil and Environmental Engineering Faculty Publications and Presentations

In developing TMDL waste-load allocations for the Snake River-Reservoir system in Western Idaho and Eastern Oregon, determinations of the assimilative capacity of the system and the impact of pollutant reduction strategies has been performed using both a statistical-correlation approach and a mechanistic modeling approach. The system included the Lower Snake River, Brownlee Reservoir, Oxbow Reservoir, and Hells Canyon Reservoir with the focus was on Brownlee Reservoir.

The statistical approach used on Brownlee Reservoir divided the system into riverine and lacustrine zones. Field data were then averaged over season and location to provide statistical correlations, such as between total phosphorus (TP) …


Upper Spokane River Model: Model Calibration, 1991 And 2000, Chris Berger, Robert Leslie Annear, Scott A. Wells Jan 2002

Upper Spokane River Model: Model Calibration, 1991 And 2000, Chris Berger, Robert Leslie Annear, Scott A. Wells

Civil and Environmental Engineering Faculty Publications and Presentations

The Washington Department of Ecology is interested in a water quality model for the Upper Spokane River system for use in developing Total Maximum Daily Loads (TMDLs). The goals of this modeling effort are to:

• Gather data to construct a computer simulation model of the Spokane River system including Long Lake Reservoir and the pools behind Nine Mile dam, Upper Falls dam and Upriver dam. • Ensure that the model accurately represents the system hydrodynamics and water quality (flow, temperature, dissolved oxygen and nutrient dynamics)

This report evaluates the model calibration and discusses issues relative to that calibration effort. …