Open Access. Powered by Scholars. Published by Universities.®

Arts and Humanities Commons

Open Access. Powered by Scholars. Published by Universities.®

2017

Journal

Anthropology

Hays County

Articles 1 - 4 of 4

Full-Text Articles in Arts and Humanities

Archeological Survey For The Proposed Leah Tract Development And Leah Avenue Extension, San Marcos, Hays County, Texas, Andrea Stahman Burden, Timothy Griffith, Joseph Sanchez Jan 2017

Archeological Survey For The Proposed Leah Tract Development And Leah Avenue Extension, San Marcos, Hays County, Texas, Andrea Stahman Burden, Timothy Griffith, Joseph Sanchez

Index of Texas Archaeology: Open Access Gray Literature from the Lone Star State

On October 18 and 19, 2017, Blanton & Associates, Inc. conducted an intensive archeological survey of the proposed Leah Tract Development and Leah Avenue Extension on behalf of Lifestyle Development LLC in Hays County, Texas. The total area of potential effects for the proposed project is approximately 50 acres (20.23 hectares) in size, and the maximum depth of impacts from the proposed project would be 6 feet below the current ground surface. Survey of the area of potential effects was conducted prior to commercial development of the parcel and roadway construction in compliance with Section 106 of the National Historic …


Intensive Cultural Resources Survey Of The 1,753.7-Acre Waterstone Tract, San Marcos, Hays County, Texas, Jeffrey D. Owens, Kathryn St. Clair Jan 2017

Intensive Cultural Resources Survey Of The 1,753.7-Acre Waterstone Tract, San Marcos, Hays County, Texas, Jeffrey D. Owens, Kathryn St. Clair

Index of Texas Archaeology: Open Access Gray Literature from the Lone Star State

Horizon Environmental Services, Inc. (Horizon) was selected by Wolff Enterprises II, LLC (Wolff), on behalf of La Salle Municipal Utility District (MUD) Nos. 1, 2, 3, 4, and 5, to conduct a cultural resources inventory survey and assessment of the 709.7-hectare (1,753.7-acre) Waterstone tract. The Waterstone tract consists of a series of undeveloped agricultural fields located roughly midway between Kyle and San Marcos in southeastern Hays County, Texas. The proposed undertaking would involve construction of mixed-use commercial and residential development on the tract. The tract is located a short distance east of Interstate Highway (IH) 35 and is bounded on …


Intensive Cultural Resources Survey Of The 1,753.7-Acre Waterstone Tract, San Marcos, Hays County, Texas, Jeffrey D. Owens, Kathryn St. Clair Jan 2017

Intensive Cultural Resources Survey Of The 1,753.7-Acre Waterstone Tract, San Marcos, Hays County, Texas, Jeffrey D. Owens, Kathryn St. Clair

Index of Texas Archaeology: Open Access Gray Literature from the Lone Star State

Horizon Environmental Services, Inc. (Horizon) was selected by Wolff Enterprises II, LLC (Wolff), on behalf of La Salle Municipal Utility District (MUD) Nos. 1, 2, 3, 4, and 5, to conduct a cultural resources inventory survey and assessment of the 709.7-hectare (1,753.7-acre) Waterstone tract. The Waterstone tract consists of a series of undeveloped agricultural fields located roughly midway between Kyle and San Marcos in southeastern Hays County, Texas. The proposed undertaking would involve construction of mixed-use commercial and residential development on the tract. The tract is located a short distance east of Interstate Highway (IH) 35 and is bounded on …


Interstate Highway 35 From South Of State Highway 80 To North Of Ranch-To-Market 12, Hays County, Texas, Katherine Seikel Jan 2017

Interstate Highway 35 From South Of State Highway 80 To North Of Ranch-To-Market 12, Hays County, Texas, Katherine Seikel

Index of Texas Archaeology: Open Access Gray Literature from the Lone Star State

In February 2017, AmaTerra Environmental, Inc. (AmaTerra) conducted an intensive archeological survey for proposed improvements to Interstate Highway (I) 35 from South of State Highway (SH) 80 to North of Ranch-to-Market (RM) 12 through the City of San Marcos in Hays County, Texas (CSJ No. 0016-03-114). The proposed project would realign entrance and exit ramps, reconstruct frontage roads, make intersection improvements at SH 123, replace frontage road bridges over the San Marcos River and Willow Springs Creek, replace bridges at SH 123/Guadalupe Streets, and construct a new shared-use path along the northbound frontage road to accommodate bicycle and pedestrian use. …