Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England Jan 1981

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England

Dickey-Lincoln School Lakes Project

The proposed Dickey-Lincoln School Lakes Project in northern Maine is a multipurpose installation on the St.John River. The combination hydroelectric power and flood control project is located in Aroostook County, Maine, near the Canadian border. The two proposed earth fill dams located at Dickey are 10,200 feet in length with a maximum height of 335 feet. They would impound 7.7 million acre feet of water at a maximum pool elevation 910 feet mean sea level. A second earth filled dam located 11 miles downstream at Lincoln School would serve as a regulatory dam. It would be 2100 feet in lenqth, …


Federal Water Pollution Control Act Section "404" Evaluation For Dickey-Lincoln School Lakes, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers Jan 1980

Federal Water Pollution Control Act Section "404" Evaluation For Dickey-Lincoln School Lakes, New England Division, United States Army Engineer Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The purpose of this report is to relate various aspects of the proposed Dickey-Lincoln School Lakes Hydroelectric Project to appropriate considerations defined by Section 404 of the Federal Water Pollution Control Act of 1972.


Fish And Wildlife Mitigation Report : Dickey-Lincoln School Lakes Project, Maine, New England Division, Corps Of Engineers, U. S. Army Engineer Division Jan 1980

Fish And Wildlife Mitigation Report : Dickey-Lincoln School Lakes Project, Maine, New England Division, Corps Of Engineers, U. S. Army Engineer Division

Dickey-Lincoln School Lakes Project

The Dickey Lincoln School Lakes Project is a proposed multipurpose project located on the upper reaches of the St. John River in Aroostook County, Maine. Development would consist of two dams with associated reservoirs and hydroelectric generating facilities, five dikes and transmission lines. A more detailed description of the proposed project and its associated impacts is contained within the Revised Draft Environmental Impact Statement for the proposed project.


Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Supplement Environmental Impact Statement, U.S. Army Engineer Division, New England Division Jan 1980

Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Supplement Environmental Impact Statement, U.S. Army Engineer Division, New England Division

Dickey-Lincoln School Lakes Project

The purpose of this Draft Supplement (SDEIS) to the Revised Draft Environmental Impact Statement (RDEIS) is to evaluate the environmental impacts of the Fish and Wildlife Mitigation Plan proposed for Implementation in conjunction with development of the Dickey-Lincoln School Lakes Project, Maine (Appendix K, RDEIS and Attachment 1 of the Report). Although the mitigation plan is intended to mitigate rather than impose adverse environmental impacts, the mitigation measures proposed do constitute a major Federal action requiring the development of a supplemental environmental impact statement pursuant to the National Environmental Policy Act of 1969.


Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior Jan 1977

Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior

Dickey-Lincoln School Lakes Project

Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …


[Letter From New England Regional Director To Division Engineer, New England Division, U.S. Army Corps Of Engineers], U.S. Fish And Wildlife Service Jan 1976

[Letter From New England Regional Director To Division Engineer, New England Division, U.S. Army Corps Of Engineers], U.S. Fish And Wildlife Service

Dickey-Lincoln School Lakes Project

The results of appraisals conducted jointly by this Service, the Maine Department of Inland Fisheries and Wildlife, and your agency concerning bald eagle, osprey, peregrine falcon, and great blue heron.


Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers Jan 1976

Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers

Dickey-Lincoln School Lakes Project

The first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey Dam - Spillway Design Flood, III - Lincoln School Dam - Spillway Design Flood and IV - Flood Analysis and Reservoir Regulation. la section I, hydro-logic studies will be confined generally to the drainage area of the Saint John River above the gaging station at Fort Kent, Maine. The purpose of section I is to present the climatological and streamflow data for the Saint John River above Fort Kent in order to establish hydrologic criteria for the design of the Dickey and Lincoln …


Hydroelectric Power Potential At Corps Of Engineers Projects : A Report, Ralph L. Trisko, United States. Army., Institiute For Water Resources Jan 1975

Hydroelectric Power Potential At Corps Of Engineers Projects : A Report, Ralph L. Trisko, United States. Army., Institiute For Water Resources

Dickey-Lincoln School Lakes Project

This report completes phase one of the study. It is intended to fill the need, recognized at the outset, for a broad framework within which subsequent more detailed study at the project level might take place. It is an overview of physical hydropower potential in the context of energy and water resources and demands, energy economics, and federal policy, organization, and practices pertaining to hydropower development and marketing.