Articles 1 - 10 of 10

Full-Text Articles in Architecture

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England Jan 1981

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England

Dickey-Lincoln School Lakes Project

The proposed Dickey-Lincoln School Lakes Project in northern Maine is a multipurpose installation on the St.John River. The combination hydroelectric power and flood control project is located in Aroostook County, Maine, near the Canadian border. The two proposed earth fill dams located at Dickey are 10,200 feet in length with a maximum height of 335 feet. They would impound 7.7 million acre feet of water at a maximum pool elevation 910 feet mean sea level. A second earth filled dam located 11 miles downstream at Lincoln School would serve as a regulatory dam. It would be 2100 feet in lenqth, …


Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy Jan 1978

Draft Environmental Impact Statement : Dickey-Lincoln School Lakes Transmission Project, United States Department Of Energy

Dickey-Lincoln School Lakes Project

This draft environmental impact statement (EIS) will describe the environmental impacts of transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Electric power produced by the project is to be integrated into the New England electric system if the project is constructed.


Report Of The Citizens' Dickey-Lincoln Project Impact Review Committee To Governor James B. Longley, John D. Robinson, James B. Longley Jan 1977

Report Of The Citizens' Dickey-Lincoln Project Impact Review Committee To Governor James B. Longley, John D. Robinson, James B. Longley

Dickey-Lincoln School Lakes Project

The construction of the Dickey-Lincoln Hydroelectric Project. To examine, in depth, the proposal and its impact as seen by various segments of our society. The report will identify the factors that must carry the main weight in making a final determination.


Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc. Jan 1977

Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

The Dickey-Lincoln Hydroelectric Dam is a water resources project proposed by the Federal Government (U. S. Army Corps of Engineers). Therefore, in accordance with the National Environmental Policy Act, the Corps of Engineers is required to prepare an environmental impact statement (EIS) on the project. A federal plan or project such as Dickey-Lincoln should take into account its effect upon man's health, safety, welfare and economic well-being, as well as effects upon the surrounding environment. More importantly, project plans should be evaluated in a "manner calculated to encourage harmony between man and his environment." In other words, project plans or …


Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division Jan 1977

Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

Objective of this study will be to assess Dickey-Lincoln in terms of its attainment of project objectives. How will this be done? The Water Resources Council in "Water and Related Land Resources -Establishment of Principles and Standards for Planning"' states that: The overall purpose of water and land resource planning is to promote the quality of life, by reflecting society's preferences for attainment of the objectives...


Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior Jan 1977

Transmission Reconnaissance Study : Dickey-Lincoln School Lakes Project, United States Department Of Interior

Dickey-Lincoln School Lakes Project

Two dams are proposed on the St. John River in northern Maine: Dickey, a high earth filled dam immediately above the confluence of the Allagash with the St. John, will have an installed generating capacity of 760 MW; and Lincoln School Dam, 11 miles downstream, a capacity of 70 MW. These dams are scheduled for completion during the mid 1980's. The U.S. Corps of Engineers, New England Division, has been allocated funds to design the project and prepare their own environmental impact statement. This report (Transmission Reconnaissance Studies) discusses alternative transmission facilities needed to connect the project with the New …


Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc. Jan 1977

Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

This study is to assess the effects or impacts of construction and operation of the Dickey-Lincoln hydroelectric project upon the people in the St. John Valley, Maine, and New England. Having determined the effects of the project, a second objective is to discuss mitigation of defined adverse impacts. More specifically, this study attempts to identify adverse impacts and deal with how to minimize such impacts if at all possible.


Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior Jan 1976

Recommendations Of Alternative System Plans And Transmission Corridors For The Dickey/Lincoln School Hydroelectric Project, Vtn Environmental Sciences (Firm), Interior

Dickey-Lincoln School Lakes Project

This second volume of the Assessment of Alternative Power Transmission Corri-dors related to the Dickey Lincoln/School Hydroelectric Project, contains all relevant background materials to support the mapping and analysis of en-vironmental resource information. Narrative explaining what information was evaluated and the sources and reasons for its consideration are integral to this assessment.


An Energy Strategy For New England : Objectives And Implementation, Development Sciences, Inc., New England Regional Commission Jan 1976

An Energy Strategy For New England : Objectives And Implementation, Development Sciences, Inc., New England Regional Commission

Dickey-Lincoln School Lakes Project

This report is a product of the New England Regional Commission's Energy Research and Policy Formulation Program. The goal of the Energy Program is to supply the members of the New England Regional Commission, which is comprised of the six New England Governors and a Federal Co-chairman appointed by the President, with reliable baseline information on New England's energy requirements and vulnerability, and to provide the Governors and the region with viable energy policy options and recommendations to guide New England's energy future.


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …