Open Access. Powered by Scholars. Published by Universities.®

Architecture Commons

Open Access. Powered by Scholars. Published by Universities.®

Architectural Engineering

Construction Engineering

Poly Canyon

Publication Year

Articles 1 - 2 of 2

Full-Text Articles in Architecture

Bridge House Restoration, Adam Mcpherson Pruitt, Ben Christopher Sykes, Samantha Sophia Solow, Christopher Ryan Levy, Severin Bechtel Elste Jun 2019

Bridge House Restoration, Adam Mcpherson Pruitt, Ben Christopher Sykes, Samantha Sophia Solow, Christopher Ryan Levy, Severin Bechtel Elste

Architectural Engineering

Bridge House was severely neglected for years since its creation. Our team’s primary objective was to rejuvenate the structure and once again make it a priority destination for the public when visiting the Experimental Structures Laboratory. With this goal in mind, we replaced the plywood barricades with guard railings designed and fabricated by the team to complement those installed on the structure by the previous group. With the elimination of the plywood barricades, the Bridge House could once again be a sense of pride in the rich historical landscape of our Cal Poly community.

In addition, our team hoped to …


Modular House Revival, Kevin Chiang, Spencer Dilley, Sarah Dowthwaite, Trevor Houghton, Ryan Lefebvre, Michele Leung, Cameron Lober, Chris Martinez, Katie Mayer May 2017

Modular House Revival, Kevin Chiang, Spencer Dilley, Sarah Dowthwaite, Trevor Houghton, Ryan Lefebvre, Michele Leung, Cameron Lober, Chris Martinez, Katie Mayer

Architectural Engineering

The Modular House, located in Poly Canyon, has seen extensive damage since the last caretaker left nearly ten years ago. To prevent further damage and improve the safety and appeal of the structure, we are proposing a renovation of the existing building that removes the existing cladding and partitions. By the end of Spring Quarter 2017, the Modular House will have a guardrail system replacing the wood paneling on the walls and a new steel composite deck to replace the current flooring system. The structural steel framing system will remain as is.