Dickey-Lincoln School Lakes Project Economic Analysis Study, New England Division, United States Army Engineer Division, Acres American Incorporated Jan 1981

Dickey-Lincoln School Lakes Project Economic Analysis Study, New England Division, United States Army Engineer Division, Acres American Incorporated

Dickey-Lincoln School Lakes Project

The purpose of this study was to perform an economic assessment of the Dickey-Lincoln School Lakes Project. This was accomplished by simulating the New England electrical supply system with and without the project and making a comparison of the resultant production costs.


Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Impact Statement, New England Division, United States Army Engineer Division Jan 1981

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Impact Statement, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

The Final Impact Statement is supported by all appendices from all drafts as well as supplementary information provided in Supplements to those Appendices. It comprises three volumes. Volume I is the statement volume. Volume II consists of two parts. Part I contains the comment and response portion of Section 9 for the 1977 Draft EIS. Part II contains comments and responses on the 1978 Revised Draft EIS, in addition to reproductions of the original comment letters received on the Draft Fish and Wildlife Mitigation Report and responses to these comments. Volume III, Part I contains reproductions of the original comment …


Dickey-Lincoln School Lakes Transmission Project: Final Environmental Impact Statement: Appendix L, New England Division, United States Army Corps Of Engineers, United States Department Of Energy Jan 1981

Dickey-Lincoln School Lakes Transmission Project: Final Environmental Impact Statement: Appendix L, New England Division, United States Army Corps Of Engineers, United States Department Of Energy

Dickey-Lincoln School Lakes Project

This draft EIS Supplement describes the environmental impacts of updated transmission plans of the Department of Energy (DOE) for the proposed Dickey-Lincoln School Lakes Project. Energy produced by the project is to be integrated into the New England electric system if the project is constructed.


Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England Jan 1981

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England

Dickey-Lincoln School Lakes Project

The proposed Dickey-Lincoln School Lakes Project in northern Maine is a multipurpose installation on the St.John River. The combination hydroelectric power and flood control project is located in Aroostook County, Maine, near the Canadian border. The two proposed earth fill dams located at Dickey are 10,200 feet in length with a maximum height of 335 feet. They would impound 7.7 million acre feet of water at a maximum pool elevation 910 feet mean sea level. A second earth filled dam located 11 miles downstream at Lincoln School would serve as a regulatory dam. It would be 2100 feet in lenqth, …