Full-Text Articles in Architecture
Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 3: Hydropower Capacity And Project Economic, New England Division, United States Army Corps Of Engineers
Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 3: Hydropower Capacity And Project Economic, New England Division, United States Army Corps Of Engineers
Dickey-Lincoln School Lakes Project
This design memorandum presents the results of current engineering and economic analyses which serve as the basis for the selection of the recommended hydro-power installation at the Dickey-Lincoln School Lakes project. The report includes a summary of data pertinent to hydropower features of the project, projections of electricity needs for the New England Power Supply Areas, a description of the recom-mended power plan and facilities, pertinent data associated with power regulation studies, and the economic and engineering rationale for capacity optimization.
Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers
Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers
Dickey-Lincoln School Lakes Project
The purpose of the proposed Dickey-Lincoln School Lakes Hydroelectric Project is to convert the natural energy of the upper St. John River in northern Maine for use as a source of electricity to meet future needs of New England consumers.
Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior
Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior
Dickey-Lincoln School Lakes Project
This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …
Use Of Remote Sensing To Quantify Construction Material And To Define Geologic Lineations : Dickey-Lincoln School Lakes Project, Maine, H. L. Mckim, C. J. Merry
Use Of Remote Sensing To Quantify Construction Material And To Define Geologic Lineations : Dickey-Lincoln School Lakes Project, Maine, H. L. Mckim, C. J. Merry
Dickey-Lincoln School Lakes Project
This report contains Appendixes A and B of Special Report 242, use of remote sensing to quantify construction material and to define geologic lineations.