Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network

Open Access. Powered by Scholars. Published by Universities.®

Theses/Dissertations

Mathematics

Educational Leadership

The University of Southern Mississippi

Publication Year

Articles 1 - 2 of 2

Full-Text Articles in Entire DC Network

The Relationship Between Student Achievement Of At-Risk Students And The Georgia Performance Standards In Mathematics, Loralee Ann Hill May 2012

The Relationship Between Student Achievement Of At-Risk Students And The Georgia Performance Standards In Mathematics, Loralee Ann Hill

Dissertations

Educational leaders continue to be challenged in terms of accountability measures for increased student achievement, as mandated by the No Child Left Behind Act of 2001 (NCLB). In particular, schools must show adequate yearly progress (AYP) reaching 100 % proficiency levels for all students in the areas of English language arts and mathematics by 2014. In 2008, the Georgia Performance Standards (GPS) in mathematics were implemented at the high school level. Coupled with this new curriculum, a newly developed Georgia High School Graduation Test (GHSGT) in mathematics was administered in March 2011. The purpose of this study was to add …


Student Achievement In Block And Non-Block Schedule Schools, William Shelton Smith Jr. May 2011

Student Achievement In Block And Non-Block Schedule Schools, William Shelton Smith Jr.

Dissertations

The purpose of this study was to determine if the number of minutes allocated for high school instructional periods influences student achievement. The study also examined the perceptions of principals regarding one method of instructional time allocation, block scheduling.

The study examined the differences in student achievement on a high school exit examination in the content areas of Reading and Mathematics between schools in a southern state using a four-period block schedule and schools using a non-block schedule in order to ascertain if the type of schedule has any impact on student achievement. Additionally, information pertaining to scheduling was collected …