Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network

Open Access. Powered by Scholars. Published by Universities.®

Research Collection Lee Kong Chian School Of Business

1996

Flow shop

Articles 1 - 1 of 1

Full-Text Articles in Entire DC Network

Reducing Cycle Time At An Ibm Wafer Fabrication Facility, Lieven Demeester, Christopher S. Tang Mar 1996

Reducing Cycle Time At An Ibm Wafer Fabrication Facility, Lieven Demeester, Christopher S. Tang

Research Collection Lee Kong Chian School Of Business

In 1991, IBM San Jose decided to produce and sell magnetic heads for computer disk drives on the open market to original equipment manufacturers. However, as IBM's wafer fabrication facility increased the number of products it manufactured, its manufacturing cycle time lengthened. Since cycle time is important in competing in the open market, IBM San Jose formed a study team (in cooperation with UCLA) to examine the wafer fab and to develop ways to reduce cycle time. The team designed a new production control system and proposed new performance measures for operators and engineers. IBM implemented the new production control …