Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, New England Division, United States Army Engineer Division Jan 1981

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

This document contains those comments and responses on the Revised Draft Environmental Impact Statement. It is a continuation of Volume II published by the Corps in 1978. In addition, it contains reproductions of those letters of comment received on the March 1980 Draft Fish and Wildlife Mitigation Plan, and the responses to these comments.


Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England Jan 1981

Dickey-Lincoln School Lakes Project At Dickey, Maine : Final Environmental Statement, Volume 1-4, U. S. Army Engineer Division, New England

Dickey-Lincoln School Lakes Project

The proposed Dickey-Lincoln School Lakes Project in northern Maine is a multipurpose installation on the St.John River. The combination hydroelectric power and flood control project is located in Aroostook County, Maine, near the Canadian border. The two proposed earth fill dams located at Dickey are 10,200 feet in length with a maximum height of 335 feet. They would impound 7.7 million acre feet of water at a maximum pool elevation 910 feet mean sea level. A second earth filled dam located 11 miles downstream at Lincoln School would serve as a regulatory dam. It would be 2100 feet in lenqth, …


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix K: Fish & Wildlife Mitigation Plan & Impacts (Revised), New England Division, United States Army Engineer Division Jan 1980

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix K: Fish & Wildlife Mitigation Plan & Impacts (Revised), New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

The proposed plan is comprised of three major segments: terrestrial, fisheries and endangered species. Each segment is essentially a self-contained unit. All costs for the three segments including land acquisition, operation and maintenance and capital equipment, are to be charged to the project and allocated to the project purposes of hydroelectric generation and flood control.


Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Supplement Environmental Impact Statement, U.S. Army Engineer Division, New England Division Jan 1980

Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Supplement Environmental Impact Statement, U.S. Army Engineer Division, New England Division

Dickey-Lincoln School Lakes Project

The purpose of this Draft Supplement (SDEIS) to the Revised Draft Environmental Impact Statement (RDEIS) is to evaluate the environmental impacts of the Fish and Wildlife Mitigation Plan proposed for Implementation in conjunction with development of the Dickey-Lincoln School Lakes Project, Maine (Appendix K, RDEIS and Attachment 1 of the Report). Although the mitigation plan is intended to mitigate rather than impose adverse environmental impacts, the mitigation measures proposed do constitute a major Federal action requiring the development of a supplemental environmental impact statement pursuant to the National Environmental Policy Act of 1969.


Citizens Dickey-Lincoln Project Impact Review Committee Final Summary Report, Forrest P. Dexter Jr. Jan 1978

Citizens Dickey-Lincoln Project Impact Review Committee Final Summary Report, Forrest P. Dexter Jr.

Dickey-Lincoln School Lakes Project

The proposed multi-purpose hydroelectric power project at Dickey-Lincoln School would be the largest work..public or private..ever under-taken in the State of Maine. Currently, eight or nine major contacts have been authorized in preparation for writing an environmental impact statement which will assess the project's effect on Maine's economy, resources and social life.


An Overview Of The Proposed Dickey-Lincoln School Lakes Hydro-Electric Project : Aroostook County, Maine, New England Division, Department Of The Army, Corps. Of Engineers, Department Of Energy Jan 1978

An Overview Of The Proposed Dickey-Lincoln School Lakes Hydro-Electric Project : Aroostook County, Maine, New England Division, Department Of The Army, Corps. Of Engineers, Department Of Energy

Dickey-Lincoln School Lakes Project

An overview of The Dickey-Lincoln Project in northern Aroostook County, Maine is a proposed Federally financed hydro-electric power generating facility. Electric energy generated by the facility would be introduced into the New England Power Pool system through construction of new transmission lines across northern Maine, New Hampshire, and Vermont.

Responsibility for investigation and construction rests in the two Federal agencies, i.e. dams and reservoirs in the U.S. Army Corps of Engineers and transmission lines in the U.S. Department of Energy (DOE). The two actions are part of the same proposal, although they are in essence separate and distinct. The dams …


Revised Draft Impact Statement Issued For Dickey-Lincoln, New England Division, United States Army Corps Of Engineers Jan 1978

Revised Draft Impact Statement Issued For Dickey-Lincoln, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The revised draft combines data previously published in two separate impact statements prepared by the Corps relating to the dams, reservoirs and Power Plants and by the U. S. Department of Energy for transmission facilities to link the St. John River development to the New England power grid.


Earthquake Investigations At The Dickey-Lincoln School Damsites, Maine, Ellis L. Krinitzsky, David M. Patrick Jan 1977

Earthquake Investigations At The Dickey-Lincoln School Damsites, Maine, Ellis L. Krinitzsky, David M. Patrick

Dickey-Lincoln School Lakes Project

The Dickey-Lincoln School damsites are less than 50 miles from an area along the St. Lawrence River which has experienced some of the most severe earthquakes in North America. A geological and seismological investigation was made of the region in order to determine the hazards from earthquakes at the damsites. No active faults were found in the general area of the damsites. The source area of potentially severe earthquakes was found to be restricted to a narrow band that follows the St. Lawrence River. This band was designated as Zone A. The boundary of Zone A is located U5 miles …


Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 5: Water Quality, New England Division, United States Army Corps Of Engineers Jan 1977

Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 5: Water Quality, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

This design memorandum presents the results of several studies undertaken to provide an understanding of present and potential future water quality conditions within and downstream from Dickey and Lincoln School Lakes in accordance with the requirements of ETL 1110-2-1402, dated 12 November 1976. Included are an examination of baseline water quality conditions and the findings of qualitative and quantitative predictive analyses performed to evaluate water quality conditions during all phases of the project's lifetime. This document will also serve as a reference for the water quality portions of the project Environmental Impact Statement.


Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Environmental Impact Statement, New England Division, United States Army Engineer Division Jan 1977

Dickey-Lincoln School Lakes Project At Dickey, Maine : Draft Environmental Impact Statement, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

This draft EIS address the impacts of the dams and appurtenant structures. The marketing and transmission of power from Federal projects are the statutory responsibility of the Department of the Interior. Accordingly, they are conducting transmission line studies in the preparation of a draft EIS. The draft EIS for transmission line and marketing is scheduled to be submitted to the Council on Environmental Quality in February 1978. Both drafts will be combined and submitted as a Final Environmental Impact Statement in August 1978.


Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix H: Noise Impact Assessment, Stone & Webster Engineering Corporation, New England Division, United States Army Engineer Division Jan 1977

Dickey-Lincoln School Lakes Project Environmental Impact Statement: Appendix H: Noise Impact Assessment, Stone & Webster Engineering Corporation, New England Division, United States Army Engineer Division

Dickey-Lincoln School Lakes Project

The overall project area can be described as a very quiet natural area remote from any major industrial activity, but subject to high traffic noise levels along the main road. Noise sensitive areas consist of low density residential areas in the villages and widely spaced residences along the main road. The estimated yearly average Ldn for all noise sensitive areas 1s 60 dB due to the close proximity of traffic to all residences. The yearly average Ldn decreases to 40 dB at 600 ft from the main road, and to 30 dB 1n the timberland areas.


Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 2 Report, Acres American Incorporated Jan 1977

Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 2 Report, Acres American Incorporated

Dickey-Lincoln School Lakes Project

This report presents the results of Task 2 of this study, the overall purpose of which is the evaluation of alternative methods of providing electrical energy in New England in lieu of the Dickey-Lincoln hydroelectric project. The final Task 1 report was presented in July 1976 and will, in conjunction with this Task 2 and subsequent Tasks 3 and 4 reports, ultimately become part of the "Environmental Impact Statement" for the Dickey-Lincoln Project.


Dickey-Lincoln School Lakes Project Power Alternatives Study Draft Report : Task 1 Through 4, Acres American Incorporated Jan 1977

Dickey-Lincoln School Lakes Project Power Alternatives Study Draft Report : Task 1 Through 4, Acres American Incorporated

Dickey-Lincoln School Lakes Project

This report presents the detailed findings of Tasks 1 through 4 of the Dickey-Lincoln School Lakes Project Power Alternatives Study undertaken for the New England Division of the Corps of Engineers, by Acres American Incorporated, Consulting Engineers of Buffalo, New York under the terms of Contract Number DACW33-76-C-0047. Earlier reports on Task 1 dated July 1976, on Task 2 dated January 1977 and on Task 3 dated March 1977 have been incorporated virtually unchanged into this Task 4 report.


Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc. Jan 1977

Social Impact Summary : Dickey-Lincoln School Lakes Project / Prepared For The Department Of The Army, Corps Of Engineers, New England Division, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

The Dickey-Lincoln Hydroelectric Dam is a water resources project proposed by the Federal Government (U. S. Army Corps of Engineers). Therefore, in accordance with the National Environmental Policy Act, the Corps of Engineers is required to prepare an environmental impact statement (EIS) on the project. A federal plan or project such as Dickey-Lincoln should take into account its effect upon man's health, safety, welfare and economic well-being, as well as effects upon the surrounding environment. More importantly, project plans should be evaluated in a "manner calculated to encourage harmony between man and his environment." In other words, project plans or …


Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division Jan 1977

Economic Impacts Summary : Dickey-Lincoln School Lakes Project, Edward C. Jordan Co. Inc, United States Army Corps Of Engineers, New England Division

Dickey-Lincoln School Lakes Project

Objective of this study will be to assess Dickey-Lincoln in terms of its attainment of project objectives. How will this be done? The Water Resources Council in "Water and Related Land Resources -Establishment of Principles and Standards for Planning"' states that: The overall purpose of water and land resource planning is to promote the quality of life, by reflecting society's preferences for attainment of the objectives...


Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc. Jan 1977

Summary Of Labor Impacts During Construction : Dickey-Lincoln School Lakes Project, Edward C. Jordan Company, Inc.

Dickey-Lincoln School Lakes Project

This study is to assess the effects or impacts of construction and operation of the Dickey-Lincoln hydroelectric project upon the people in the St. John Valley, Maine, and New England. Having determined the effects of the project, a second objective is to discuss mitigation of defined adverse impacts. More specifically, this study attempts to identify adverse impacts and deal with how to minimize such impacts if at all possible.


1976 Deer Wintering Survey Of The St. John River-Dickey-Lincoln Project Area, Alan Hutchinson Jan 1976

1976 Deer Wintering Survey Of The St. John River-Dickey-Lincoln Project Area, Alan Hutchinson

Dickey-Lincoln School Lakes Project

As a result of renewed interest and funding for the Dickey-Lincoln Hydro-electric project, this study was initiated to update information on deer wintering habitat in the section of the St. John River Valley affected by the proposed impoundment. In particular, this project was aimed at determining the acreage of deer wintering habitat that would be directly lost due to the impoundment. In addition, the distribution of deer wintering habitat in the surrounding area was evaluated to give a regional perspective.


Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 1 Report, Acres American Incorporated Jan 1976

Dickey-Lincoln School Lakes Project Power Alternatives Study : Task 1 Report, Acres American Incorporated

Dickey-Lincoln School Lakes Project

This report presents the results of Task 1 of a study undertaken by Acres American Incorporated to evaluate alternative methods of providing electrical energy in lieu of the Dickey-Lincoln School Lakes Project. It is understood that this report will ultimately become part of the "Environmental Impact Statement" for the project.


Dickey-Lincoln School Project : Financial Feasibility Study For Electric Power, Southeastern Power Administration, United States Department Of The Interior Jan 1976

Dickey-Lincoln School Project : Financial Feasibility Study For Electric Power, Southeastern Power Administration, United States Department Of The Interior

Dickey-Lincoln School Lakes Project

Analysis of the power feature of the proposed Dickey-Lincoln School Project finds that sufficient power revenues can be obtained from the sale of power under marketing arrangements consistent with Section 5 of the Flood Control Act of 1944 to repay all costs associated with the production and distribution of the power produced.


Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers Jan 1976

Fact Sheet : Dickey-Lincoln School Lakes, Maine, New England Division, United States Army Corps Of Engineers

Dickey-Lincoln School Lakes Project

The purpose of the proposed Dickey-Lincoln School Lakes Hydroelectric Project is to convert the natural energy of the upper St. John River in northern Maine for use as a source of electricity to meet future needs of New England consumers.


Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior Jan 1976

Transmission Planning Summary : Dickey-Lincoln School Lakes Project Transmission Studies, United States Department Of Interior

Dickey-Lincoln School Lakes Project

This report summarizes the results of system planning, environmental, and location studies for transmission facilities associated with the proposed Dickey-Lincoln School Lakes Project in northern Maine. The studies recommend the construction of two 345-kV transmission circuits from a substation near the project along a route through western Maine into northern New Hampshire and Vermont. The plan will integrate the power produced by the project into the New England Power Pool Transmission System. Five alternate integration plans were identified and studied. Of the five plans, the recommended plan, which calls for the lines to be suspended from a single row of …


Terrestrial Ecology Of The Dickey-Lincoln School Lakes Project, Corps Of Engineers, New England Division, Environmental Research & Technology, Inc Jan 1976

Terrestrial Ecology Of The Dickey-Lincoln School Lakes Project, Corps Of Engineers, New England Division, Environmental Research & Technology, Inc

Dickey-Lincoln School Lakes Project

This introduction of the St. John River watershed is situated in a transitional zone between the Boreal Forest Formation and the Eastern Deciduous Forest Formation. Second-growth forests representative of these two ecosystems cover extensive areas of the project site. The boreal forest forms a broad transcontinental belt in northern North America and Eurasia, with southern montane extensions. This northern forest is characterized by evergreen, coniferous trees, predominately spruce-fir The eastern deciduous forest, composed of broad-leaved hardwoods, extends throughout the eastern United States except Florida (Dasmann, 1968; Oosting, 1956).


[Letter From New England Regional Director To Division Engineer, New England Division, U.S. Army Corps Of Engineers], U.S. Fish And Wildlife Service Jan 1976

[Letter From New England Regional Director To Division Engineer, New England Division, U.S. Army Corps Of Engineers], U.S. Fish And Wildlife Service

Dickey-Lincoln School Lakes Project

The results of appraisals conducted jointly by this Service, the Maine Department of Inland Fisheries and Wildlife, and your agency concerning bald eagle, osprey, peregrine falcon, and great blue heron.


Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers Jan 1976

Water Resources Development Project, Saint John River Basin : Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada : Design Memorandum No. 2 : Hydrology And Hydraulic Analysis, Section Iv - Lincoln School Dam-Spillway Design Flood, Department Of The Army, New England Division, Corps Of Engineers

Dickey-Lincoln School Lakes Project

The first of four sections comprising Design Memo-randum No. 2. The other sections are: II - Dickey Dam - Spillway Design Flood, III - Lincoln School Dam - Spillway Design Flood and IV - Flood Analysis and Reservoir Regulation. la section I, hydro-logic studies will be confined generally to the drainage area of the Saint John River above the gaging station at Fort Kent, Maine. The purpose of section I is to present the climatological and streamflow data for the Saint John River above Fort Kent in order to establish hydrologic criteria for the design of the Dickey and Lincoln …


Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 2: Hydrology And Hydraulic Analysis: Section 3 - Dickey Dam-Spillway Design Flood, Army. Corps Of Engineers. New England Division Jan 1975

Dickey-Lincoln School Lakes, Maine, U.S.A. And Quebec, Canada: Design Memorandum No. 2: Hydrology And Hydraulic Analysis: Section 3 - Dickey Dam-Spillway Design Flood, Army. Corps Of Engineers. New England Division

Dickey-Lincoln School Lakes Project

This report, Section III, is the third of five sections comprising Design Memorandum No. 2. This section, on the development of the spillway design flood (SDF) for the Dickey project, describes the hydrologic criteria used and analysis performed in determining the SDF and the results of routing the flood through the reservoir in order to establish surcharge-length relations for the spillway at Dickey Dam. Also included is a discussion of freeboard requirements, frequency of filling data, an update of climatologic data and daily discharge records of the Saint John and Allagash Rivers.


Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine: Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray Jan 1968

Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine: Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray

Dickey-Lincoln School Lakes Project

The intention of this report is to present a still picture of the selected area as of the summer of 1966. The emphasis is on empirical relationships. The data contained herein will provide a base for subsequent analysis. Thus little attempt is made to cast the findings of the study in a theoretical framework. Later publications will utilize relevant theory and research to analyze the social and economic changes in an area related to the building of the Dickey and Lincoln School Dams. It is presumed that this particular report and its statistical supplement will be of particular interest to …


Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray Jan 1968

Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray

Dickey-Lincoln School Lakes Project

The intention of this report is to present a still picture of the selected area as of the summer of 1966. The emphasis is on empirical relationships. The data contained herein will provide a base for subsequent analysis. Thus little attempt is made to cast the findings of the study in a theoretical framework. Later publications will utilize relevant theory and research to analyze the social and economic changes in an area related to the building of the Dickey and Lincoln School Dams. It is presumed that this particular report and its statistical sup-plement will be of particular interest to …


Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray Jan 1968

Social And Economic Consequences Of The Dickey-Lincoln School Hydro-Electric Power Development On The Upper St. John Valley, Maine -- : Phase 1, Preconstruction, Louis A. Ploch, Nelson L. Leray

Dickey-Lincoln School Lakes Project

The intention of this report is to present a still picture of the selected area as of the summer of 1966. The emphasis is on empirical relationships. The data contained herein will provide a base for subsequent analysis. Thus little attempt is made to cast the findings of the study in a theoretical framework. Later publications will utilize relevant theory and research to analyze the social and economic changes in an area related to the building of the Dickey and Lincoln School Dams. It is presumed that this particular report and its statistical sup-plement will be of particular interest to …