Process Modelling Support For The Conceptual Modelling Phase Of A Simulation Project, Cathal Heavey, John Ryan Dec 2006

Process Modelling Support For The Conceptual Modelling Phase Of A Simulation Project, Cathal Heavey, John Ryan

Conference papers

While many developments have taken place around supporting the model coding task of simulation, there are few tools available to assist in the conceptual modelling phase. Several authors have reported the advantages of using process modelling tools in the early phases of a simulation project.

This paper provides an overview of process modelling tools in relation to their support for simulation, categorizing the tools into formal method and descriptive methods. A conclusion from this review is that none of the tools available adequately support the requirements gathering phase of simulation. This is not surprising as none of the process modelling …


Statistical Computation For Extreme Bridge Traffic Load Effects, Colin C. Caprani, E. J. O'Brien Jan 2006

Statistical Computation For Extreme Bridge Traffic Load Effects, Colin C. Caprani, E. J. O'Brien

Conference papers

The maintenance of highway infrastructure constitutes a major expenditure in many countries. This cost can be reduced significantly by minimizing the repair or replacement of highway bridges. In the assessment of existing bridges, the strength estimate tends to be more accurate than that of traffic loading, due to the more variable nature of loading. Recent advances in the statistical analysis of highway bridge traffic loading have resulted in more accurate forecasts of the actual loading to which a bridge is subject. While these advances require extensive numerical computation, they can significantly improve the accuracy of the calculation. This paper outlines …


Estimating Risk Of Failure Of Engineering Structures Using Predictive Likelihood, Colin C. Caprani, A. Bordallo-Ruiz, E. J. O'Brien Jan 2006

Estimating Risk Of Failure Of Engineering Structures Using Predictive Likelihood, Colin C. Caprani, A. Bordallo-Ruiz, E. J. O'Brien

Conference papers

It has been common engineering practice to define characteristic values for loading and capacity of structures in order to assess the structural capacity of existing structures. This approach, yet practical and intuitive, lead to the comparison of deterministic values (characteristic values) that had to represent all the variability of the problem and is considered to be conservative, as usually loading is overestimated and capacity underestimated, yielding to calculations with high safety margins for the extreme events. Probabilistics methods have tried to overcom e this limitation by computing the overall probability of failure (Pf) for the lifetime of the structure, taking …


Study Of Same-Lane And Inter-Lane Gvw Correlation, Bernard Enright, Eugene J. O'Brien, Colin C. Caprani Jan 2006

Study Of Same-Lane And Inter-Lane Gvw Correlation, Bernard Enright, Eugene J. O'Brien, Colin C. Caprani

Conference papers

The methodology used is to generate a number of years of simulated traffic and to use extreme value statistics to predict more accurately the characteristic loading for a given bridge. The parameters and probability distributions used in the Monte Carlo simulation must be based on observed sample traffic data. Some previous studies have made unsubstantiated assumptions regarding correlation between the Gross Vehicle Weights (GVW) of trucks in the same lane, or between trucks in adjacent, same-direction lanes. For this paper, an extensive database of Dutch Weigh-in-Motion data is analysed. Data are collected from two same-direction lanes and are time-stamped to …


Requirements Gathering For Simulation, John Ryan, Cathal Heavey Jan 2006

Requirements Gathering For Simulation, John Ryan, Cathal Heavey

Conference papers

This paper discusses the current shortfalls in support for the pre-coding phases of a discrete event simulation project. The paper then presents a process modelling technique, Simulation Activity Diagrams (SADs), developed to specifically support the initial requirements gathering phases of a simulation project. The paper concludes with an outline of proposed future developments to the modelling technique.