Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 3 of 3

Full-Text Articles in Entire DC Network

An Evaluation Of Facility Maintenance And Repair Strategies Of Select Companies, Christopher L. Sharp Sep 2002

An Evaluation Of Facility Maintenance And Repair Strategies Of Select Companies, Christopher L. Sharp

Theses and Dissertations

Although initial construction costs are high, the cost of operation and maintenance over a facilities life-cycle is significantly higher. A common challenge for facility maintenance professionals is balancing the cost of facility Maintenance and Repair (M&R) with the benefits derived from those facilities. This thesis documents how a selection of companies implemented that balance by determining their facilities requirements based on their chosen facility condition level and how they then allocated funds. The research effort consisted of interviews with facility maintenance professionals at each company selected. The data was then used to perform a multiple case study analysis and comparison …


A Life Cycle Cost Analysis Of The Proposed Replacement Of Pope Air Force Base's C-130e Fleet Using A Fleet Replacement Model, Lance R. French Mar 2002

A Life Cycle Cost Analysis Of The Proposed Replacement Of Pope Air Force Base's C-130e Fleet Using A Fleet Replacement Model, Lance R. French

Theses and Dissertations

The 43rd Airlift Wing at Pope AFB, NC, possesses 33 E-model C-130 aircraft. The airplanes range in age from 30-36 years old. Current plans call for replacing Pope's aging fleet of tactical airlifters with new C-130J model planes in FY11. There are two replacement alternatives proposed in this research. The first is to calls for replacing the C-130Es with C-130Js now. The second option is upgrade the C-130Es to C-130Xs and replace them in 10 years with the C-130J. The results indicate that the least cost solution is to upgrade Pope's fleet of C-130Es to C-130Xs now. However, after conducting …


Estimating The Operating And Support Cost Difference Among Tuaf C-130, C-130b And Usaf C-130j Aircraft, Kubilay Kosucu Mar 2002

Estimating The Operating And Support Cost Difference Among Tuaf C-130, C-130b And Usaf C-130j Aircraft, Kubilay Kosucu

Theses and Dissertations

In an era of decreasing defense budgets in Korea, the Korean Air Force Transportation Department has suffered from an insufficient vehicles procurement budget, resulting in fewer vehicles of increasing age, as well as decreasing military morale. For these reasons, the Korean Air Force Transportation Department needs a breakthrough to retain the transportation ability to support the field of operation in an effective and economic way. However, the Korea Air Force Transportation Department has only one method for procuring general-purpose vehicles, which is purchasing. Thus, the comparative analysis of leasing versus buying vehicle study started from the recognition of this situation …