Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network

Open Access. Powered by Scholars. Published by Universities.®

PDF

Roger Williams University

Historic Preservation

Series

2012

Rehabilitation

Articles 1 - 2 of 2

Full-Text Articles in Entire DC Network

Matthewson St. United Methodist Church: Rehabilitation Feasiblity Report, Catherine Varnas, Jonathan Hopkins, Dylan Peacock, Joshua Lentz, Arnold Robinson Jan 2012

Matthewson St. United Methodist Church: Rehabilitation Feasiblity Report, Catherine Varnas, Jonathan Hopkins, Dylan Peacock, Joshua Lentz, Arnold Robinson

Historic Preservation

The first-story floor plan was altered significantly during the 1951 renovations, and the entry vestibule is adorned with Neo-Gothic panelling. The chapel on the first floor is handsomely finished. The two-story sanctuary space has a semi-circular configuration with pews radiating from the altar, a balcony and substantial crown moulding.


Liberty Street School: Reuse And Rehabilitation Feasibility Report, Eric Deitz, Matt Spears, Nedith Wikina, Arnold Robinson Jan 2012

Liberty Street School: Reuse And Rehabilitation Feasibility Report, Eric Deitz, Matt Spears, Nedith Wikina, Arnold Robinson

Historic Preservation

It is recommended that the iron fire escapes on the east and west elevations be removed because they do not meet current fire codes as a proper means of egress from the building. The metal railings should also be removed and replaced with railings that meet current building code with a proper height.