Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network

Open Access. Powered by Scholars. Published by Universities.®

Petroleum Engineering

Theses/Dissertations

2010

CBHP

Articles 1 - 1 of 1

Full-Text Articles in Entire DC Network

A Simulation Study Of Factors That Affect Pressure Control During Kick Circulation In Managed Pressure Drilling Operations, Jose Eduardo Eduardo Chirinos Jan 2010

A Simulation Study Of Factors That Affect Pressure Control During Kick Circulation In Managed Pressure Drilling Operations, Jose Eduardo Eduardo Chirinos

LSU Master's Theses

An university-industry consortium has been studying alternative well control procedures to be used for kicks taken during managed pressure drilling (MPD) operations using the constant bottom hole pressure (CBHP) method. The CBHP method of MPD allows more precise control of wellbore pressure than conventional drilling. MPD surface equipment allows more alternatives for controlling a kick and may support faster detection of kicks and losses which can reduce the severity of a well control event. Nevertheless, the elimination of well control incidents cannot be guaranteed, and the uncertainty in downhole drilling margins are not reduced by adopting MPD methods. The primary …