Sustainable Production Through Balancing Trade-Offs Among Three Metrics In Flow Shop Scheduling, Amin Abedini, Wei Li, Fazleena Badurdeen, Ibrahim S. Jawahir
Sustainable Production Through Balancing Trade-Offs Among Three Metrics In Flow Shop Scheduling, Amin Abedini, Wei Li, Fazleena Badurdeen, Ibrahim S. Jawahir
Institute for Sustainable Manufacturing Faculty Publications
In sustainable manufacturing, inconsistencies exist among objectives defined in triple-bottom-lines (TBL) of economy, society, and environment. Analogously, inconsistencies exist in flow shop scheduling among three objectives of minimizing total completion time (TCT), maximum completion time (MCT), and completion time variance (CTV), respectively. For continuous functions, the probability is zero to achieve the objectives at their optimal values, so is it at their worst values. Therefore, with inconsistencies among individual objectives of discrete functions, it is more meaningful and feasible to seek a solution with high probabilities that system performance varies within the …
An Efficient Constructive Heuristic To Balance Trade-Offs Between Makespan And Flowtime In Permutation Flow Shop Scheduling, Feidi Dang, Wei Li, Honghan Ye
An Efficient Constructive Heuristic To Balance Trade-Offs Between Makespan And Flowtime In Permutation Flow Shop Scheduling, Feidi Dang, Wei Li, Honghan Ye
Mechanical Engineering Faculty Publications
Balancing trade-offs between production cost and holding cost is critical for production and operations management. Utilization of a production line affects production cost, which relates to makespan, and work-in-process (WIP) inventories in a production line affect holding cost, which relate to flowtime. There are trade-offs between two objectives, to minimize makespan and to minimize flowtime. Without addressing trade-off balancing issues in flow shop scheduling, WIP inventories are still high in manufacturing, generating unnecessary holding cost. However, utilization is coupled with WIP inventories. Low WIP inventory levels might lower utilization and generate high production cost. Most existing constructive heuristics focus only …
Stochastic Bi-Level Optimization Models For Efficient Operating Room Planning, Amin Abedini, Wei Li, Honghan Ye
Stochastic Bi-Level Optimization Models For Efficient Operating Room Planning, Amin Abedini, Wei Li, Honghan Ye
Mechanical Engineering Faculty Publications
Within a hospital, the operating room (OR) department has the largest cost and revenue. Because of the aging population, the demand for surgical services has been increasing sharply in recent years. At the other hand, the rate of OR capacity expansion is lower than the rate of increasing demand. As a result, OR managers must leverage their resources by efficient OR planning. OR planning is challenging because of multiple competing\conflicting objectives such cost minimization and throughput maximization. Inherent uncertainty in the surgical procedures and patients arrivals complicate the decision making process. This increases the risk of non-realization of the system …