Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Entire DC Network

Control Of Hydrogen Sulfide From Groundwater Using Packed-Bed Anion Exchange And Other Technologies, Camilo Romero Cotrino Apr 2006

Control Of Hydrogen Sulfide From Groundwater Using Packed-Bed Anion Exchange And Other Technologies, Camilo Romero Cotrino

USF Tampa Graduate Theses and Dissertations

Hydrogen sulfide imparts odors and taste to drinking water and can be corrosive to distribution systems. Groundwater sources used to produce drinking water tend to have sulfide concentrations ranging from below 0.1 to over 3 mg/L. Under anaerobic conditions, hydrogen sulfide can be formed from reduction of sulfate and elemental sulfur through chemical or biological reactions. Therefore, to decrease the potential for hydrogen sulfide in water systems, control of all forms of sulfur should be consistent.

Hydrogen sulfide in groundwater can be controlled through conversion or removal mechanisms. Conversion reactions result from chemical or biological reactions that oxidize hydrogen sulfide …


Development Of A Gis Based Infrastructure Replacement Prioritization System; A Case Study, Brian D. Pickard Mar 2006

Development Of A Gis Based Infrastructure Replacement Prioritization System; A Case Study, Brian D. Pickard

USF Tampa Graduate Theses and Dissertations

Maintenance, repair, and replacement of transmission mains and distribution system piping is expected to cost approximately $75 billion over the next two decades to ensure that public water systems are capable of providing the United States with safe drinking water. However, there is a significant gap between the funds available and the projected costs of infrastructure replacement or rehabilitation. Infrastructure Management Systems (IMS) have been developed to assist utilities and decision-makers in determining how to allocate resources for infrastructure. This project utilizes theTampa Water Department (TWD) as a case study to develop a tool for prioritizing infrastructure replacement.

TWD is …