Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network

Open Access. Powered by Scholars. Published by Universities.®

Civil and Environmental Engineering

PDF

Missouri Dam Safety Inspection Reports

1981

Articles 1 - 4 of 4

Full-Text Articles in Entire DC Network

Phase 1 Inspection Report: National Dam Safety Program. Upper Mississippi - Kaskaskia - St. Louis Basin. Lake Bono Del Dam, Jefferson County, Missouri, Horner & Shifrin, Inc., St. Louis, Missouri Jan 1981

Phase 1 Inspection Report: National Dam Safety Program. Upper Mississippi - Kaskaskia - St. Louis Basin. Lake Bono Del Dam, Jefferson County, Missouri, Horner & Shifrin, Inc., St. Louis, Missouri

Missouri Dam Safety Inspection Reports

This report presents the results of field inspection and evaluation of the Lake Bono Del Dam (MO 30434):

It was prepared under the National Program of Inspection of Non-Federal Dams.

This dam has been classified as unsafe, non-emergency by the St. Louis District as a result of the application of the following criteria:

1) Spillway will not pass 50 percent of the Probable Maximum Flood without overtopping the dam.

2) Overtopping of the dam could result in failure of the dam.

3) Dam failure significantly increases the hazard to loss of life downstream.


Phase 1 Inspection Report: National Dam Safety Program. Mississippi - Kaskaskia - St. Louis Basin. Lac Marseilles Dam, St. Francois County, Missouri, Woodward-Clyde Consultants, Chicago, Illinois Jan 1981

Phase 1 Inspection Report: National Dam Safety Program. Mississippi - Kaskaskia - St. Louis Basin. Lac Marseilles Dam, St. Francois County, Missouri, Woodward-Clyde Consultants, Chicago, Illinois

Missouri Dam Safety Inspection Reports

This report presents the results of field inspection and evaluation of the Lac Marseilles Dam. It was prepared under the National Program of Inspection of Non-Federal Dams.


Phase 1 Inspection Report: National Dam Safety Program. White River Basin. Ozark Lead Tailings Dam, Reynolds County, Missouri, Woodward-Clyde Consultants, Chicago, Illinois Jan 1981

Phase 1 Inspection Report: National Dam Safety Program. White River Basin. Ozark Lead Tailings Dam, Reynolds County, Missouri, Woodward-Clyde Consultants, Chicago, Illinois

Missouri Dam Safety Inspection Reports

This report presents the results of field inspection and evaluation of the Ozark Lead Tailings Dam. It was prepared under the National Program of Inspection of Non-Federal Dams.


Phase 1 Inspection Report: National Dam Safety Program. Mississippi - Kaskaskia - St. Louis Basin. Lake Adelle Dam, Jefferson County, Missouri, Crawford, Murphy & Tilly, Inc., Springfield, Illinois, A & H Engineering Corporation, Carbondale, Illinois Jan 1981

Phase 1 Inspection Report: National Dam Safety Program. Mississippi - Kaskaskia - St. Louis Basin. Lake Adelle Dam, Jefferson County, Missouri, Crawford, Murphy & Tilly, Inc., Springfield, Illinois, A & H Engineering Corporation, Carbondale, Illinois

Missouri Dam Safety Inspection Reports

This report is prepared under guidance contained in Department of the Army, Office of the Chief of Engineers, Recommended Guidelines For Safety Inspection Of Dams, for a Phase I investigation. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigations and analyses involving topographic mapping, subsurface Investigations, testing and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any …