Articles 1 - 11 of 11

Full-Text Articles in Entire DC Network

The Living Breakwaters Pdr Efforts Econcrete Resource Analysis, Guianina Ferrari, Shervon Stephens, Calvin O. Walters Jr. Dec 2022

The Living Breakwaters Pdr Efforts Econcrete Resource Analysis, Guianina Ferrari, Shervon Stephens, Calvin O. Walters Jr.

Publications and Research

On October 29, 2012, Superstorm Sandy impacted 443,000 people and caused nearly $19 billion (about $58 per person in the US) worth of damage within New York City. As part of the New York City infrastructure reparation plan, the Living Breakwaters project in Tottenville addressed coastal resilience, allocating $100M of public funds to a series of artificial breakwaters by the southwest coast of Staten Island. Each breakwater is constructed and designed to mitigate water flow in storm events. ECOncrete, a primary element of the breakwater, is a specialty cast cementitious product that is marine organism-friendly that encourages biocalcification and photosynthesis. …


The Living Breakwaters Pdr Efforts: Conceptual Scheduling, Calvin O. Walters Jr. May 2022

The Living Breakwaters Pdr Efforts: Conceptual Scheduling, Calvin O. Walters Jr.

Publications and Research

On October 29, 2012, Superstorm Sandy caused nearly $19 billion in damages in New York City including 69,000 residential units across the five boroughs. This disaster precipitated a post-disaster-rebuilding (PDR) project including roughly $4.2 billion in a Community Development Block Grant allocated towards PDR projects. A portion of the grant was used to construct a living breakwater in Tottenville, Staten Island, consisting of a resiliency approach to risk reduction through erosion prevention, wave energy attenuation, and enhancement of ecosystems and social resiliency to improve resistance to storms for the community of Tottenville. The ridges of each breakwater are designed with …


Assessing The Impact Of The Lead/Lag Times On The Project Duration Estimates In Highway Construction, Mohamed Abdel-Raheem, Jennifer Reyes, Xiaohui Wang, Grecia Silva Sanchez Jul 2021

Assessing The Impact Of The Lead/Lag Times On The Project Duration Estimates In Highway Construction, Mohamed Abdel-Raheem, Jennifer Reyes, Xiaohui Wang, Grecia Silva Sanchez

Civil Engineering Faculty Publications and Presentations

The literature mentions multiple factors that can affect the accuracy of estimating the project duration in highway construction, such as weather, location, and soil conditions. However, there are other factors that have not been explored, yet they can have significant impact on the accuracy of the project time estimate. Recently, TxDOT raised a concern regarding the importance of the proper estimating of the lead/lag times in project schedules. These lead/lag times are often determined based on the engineer’s experience. However, inaccurate estimates of the lead/lag time can result in unrealistic project durations. In order to investigate this claim, the study …


Benefits Of Pre-Construction Analysis: Cet Senior Capstone Expands Understanding Of An Urban Refuge At Gallopnyc Sunrise Stables, Aalaa Mohammed Dec 2020

Benefits Of Pre-Construction Analysis: Cet Senior Capstone Expands Understanding Of An Urban Refuge At Gallopnyc Sunrise Stables, Aalaa Mohammed

Publications and Research

For any construction project, there exists a phase of planning known as “pre-construction.” This initial phase of the project provides a definition of the project, identification of potential issues, planning and scheduling, scope, cost estimation, and analysis of needs for the job. My research analyzes a pre-construction case study conducted for Gallop NYC’s Stable in Howard Beach, Queens. The findings suggest that the practice of construction planning is effective in order to avoid delays in construction itself and ensure successful project completion. Supporting literature examines some of the best practices for pre-construction analysis. These include but are not limited to: …


Impact Of Critical Path Method (Cpm) Of Scheduling On On-Time Completion Of Transportation Projects, Fahim Ahmed Jan 2018

Impact Of Critical Path Method (Cpm) Of Scheduling On On-Time Completion Of Transportation Projects, Fahim Ahmed

Theses and Dissertations

This study addresses the effectiveness of Critical Path Method (CPM) scheduling on project delivery. Specifically, the on-time completion of projects with and without a CPM schedule is explored. The paper uses data from 2,097 South Carolina transportation projects let after February 2008 and substantially completed by August 2015. The delay analysis uses the original contract completion date as well as the completion date adjusted by change orders. Chi-Squared tests are used to examine the relationship between CPM scheduled projects and delayed projects, and t-tests are used to compare the mean delay (in days) between CPM scheduled and unscheduled projects. The …


Enhancing Productivity By Using Building Information Modeling Applications In Pipeline Construction Projects, Harsha Vardhan Reddy Guduru Penusila May 2016

Enhancing Productivity By Using Building Information Modeling Applications In Pipeline Construction Projects, Harsha Vardhan Reddy Guduru Penusila

Civil Engineering Theses

Building Information Modeling (BIM) is a technology and associated set of processes to produce, communicate, and analyze building models. BIM is a new concept within the construction industry. The objective of this thesis is to utilize BIM in pipeline construction projects as one of the pioneering steps to reduce rework and delays due to unforeseen conditions. This thesis presents evaluation and recommendations to help pipeline construction industry’s transition from traditional two-dimensional drawings to a BIM management process aiding owners and contractors to develop and implement a basic form of BIM technique to manage their projects. This thesis uses two pipeline …


Scheduling Of Container Handling Equipment In Marine Container Terminals, Narges Kaveshgar Dec 2014

Scheduling Of Container Handling Equipment In Marine Container Terminals, Narges Kaveshgar

Theses and Dissertations

To improve the competitiveness of marine container terminals, it is critical to minimize the makespan of a container vessel. The makespan is defined as the latest completion time among all handling tasks of the container vessel. Lower makespan (i.e. lower vessel turn time) can be achieved through better scheduling of the container handling equipment during vessel operations. The scheduling of terminal equipment is an operational problem, and a detailed schedule for each type of equipment operating in the terminal is necessary. Several studies have applied operations research techniques to optimize the processes of equipment in a terminal. This dissertation investigates …


A Real-Time Crane Service Scheduling Decision Support System (Css-Dss) For Construction Tower Cranes, Amir Tork Jan 2013

A Real-Time Crane Service Scheduling Decision Support System (Css-Dss) For Construction Tower Cranes, Amir Tork

Electronic Theses and Dissertations

The success of construction projects depends on proper use of construction equipment and machinery to a great extent. Thus, appropriate planning and control of the activities that rely on construction equipment could have significant effects on improving the efficiency of project operations. Cranes are the largest and most conspicuous construction equipment, widely used in typical construction sites. They play a major role in relocation of materials in horizontal and vertical directions on construction sites. Given the nature of activities relying on construction cranes in various stages of a project, cranes normally have control over the critical path of the project …


Primecontract.Com, Purdue Ect Team Jan 2007

Primecontract.Com, Purdue Ect Team

ECT Fact Sheets

The PrimeContract.com network is based on a three-tier software architecture using JAVA in a UNIX environment. The network is designed to effortlessly accommodate large numbers of users in an extremely secure environment.


Application Of Tabu Search Algorithm In Job Shop Scheduling, Betrianis Betrianis, Putu Teguh Aryawan Dec 2003

Application Of Tabu Search Algorithm In Job Shop Scheduling, Betrianis Betrianis, Putu Teguh Aryawan

Makara Journal of Technology

Application of Tabu Search Algorithm in Job Shop Scheduling. Tabu Search is one of local search methods which is used to solve the combinatorial optimization problem. This method aimed is to make the searching process of the best solution in a complex combinatorial optimization problem(np hard), ex : job shop scheduling problem, became more effective, in a less computational time but with no guarantee to optimum solution.In this paper, tabu search is used to solve the job shop scheduling problem consists of 3 (three) cases, which is ordering package of September, October and November with objective of minimizing makespan (Cmax). …


An Expert System For The Civil Engineering In-Service Work Plan, Philip W. Melancon Dec 1991

An Expert System For The Civil Engineering In-Service Work Plan, Philip W. Melancon

Theses and Dissertations

Civil Engineering managers make many decisions each day which could be aided using expert system technology. One of the most important decision processes affecting CE operations is the scheduling of work order to be accomplished each month. A good work order schedule, or In-Service Work Plan (IWP), can ensure that material and manpower resources are fully utilized, that base facilities are properly maintained, and that customers are satisfied. The purpose of this research was to build and test a PC-based prototype expert system to schedule the IWP. Expanding on previous research, a multiplicative weighting technique was developed to provide relative …