Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network

Open Access. Powered by Scholars. Published by Universities.®

Articles 1 - 2 of 2

Full-Text Articles in Entire DC Network

Intelligent Painting Process Planner For Robotic Bridge Painting, Yong Bai Apr 2007

Intelligent Painting Process Planner For Robotic Bridge Painting, Yong Bai

Civil and Environmental Engineering Faculty Research and Publications

Due to increased government regulations on environment, health, and safety, the cost of on-site bridge painting has quadrupled over the past several years. The construction industry faces a great challenge in how to control the increased costs of bridge painting and meet the regulations at the same time. A possible solution to address this challenge is to develop a robotic bridge painting system. The development of the robotic system can be justified by the potential improvements in safety and productivity. This paper presents the development and testing of an Intelligent Painting Process Planner. The Planner, built based on bridge feature …


Enhancing The Capability Of Rapid Bridge Replacement After Extreme Events, Yong Bai, Seong Hoon Kim, William R. Burkett Jan 2007

Enhancing The Capability Of Rapid Bridge Replacement After Extreme Events, Yong Bai, Seong Hoon Kim, William R. Burkett

Civil and Environmental Engineering Faculty Research and Publications

Purpose

The potential threats of extreme events to highway bridges have received increased attention from government agencies, the engineering and construction communities, and the traveling public. These events include terrorist attacks as well as human‐induced and natural hazards such as earthquakes, explosions, fires, floods, and hurricanes. To respond to the potential threats on highway bridges, a research project was conducted to identify rapid bridge replacement processes, techniques, and needs for improvements.

Design/methodology/approach

To achieve the research objectives, a detailed case study of previous bridge replacement following an extreme event was conducted. The case study was performed using a three‐step approach. …