Open Access. Powered by Scholars. Published by Universities.®

Digital Commons Network

Open Access. Powered by Scholars. Published by Universities.®

Civil Engineering

PDF

University of Central Florida

Theses/Dissertations

2010

Bridges

Articles 1 - 1 of 1

Full-Text Articles in Entire DC Network

Transfer And Development Length Of Strands In Post-Tensioned Members After Anchor Head Failure, Elie El Zghayar Jan 2010

Transfer And Development Length Of Strands In Post-Tensioned Members After Anchor Head Failure, Elie El Zghayar

Electronic Theses and Dissertations

Post-tensioning tendons in segmental bridge construction are often only anchored within the deviator and pier segments. The effectiveness of the post-tensioning (PT) system is therefore dependent on proper functioning of the anchorages. On August 28, 2000 a routine inspection of the Mid-Bay Bridge (Okaloosa County, Florida) revealed corrosion in numerous PT tendons. Moreover, one of the 19-strand tendons was completely slacked, with later inspection revealing a corrosion-induced failure at the pier anchor location. Anchorage failure caused all PT force to transfer to the steel duct located within the pier segment that in turn slipped and caused the tendon to go …